FORM - 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and withdrawal of money from Designation Account - Project Wise) Datet 27 -07 -2077 To, The VAIBHAV WAREHOUSE Plot. No. 731,D Khare Town NaBpur. Subject: Certificate of Cost lncurred For Developement of construction of "VAIBHAV WAREHOUSE - I Building / No Wing of the building of the project [MahaRERA Registration Number Situated on the ] piot No,-x293, At MOUZA-RENGAPAR BUT|BoRt tNDUsTRtAL AREA. Demarcated by its boundaries (latitude and longitude of the end points) 5o.0OO to the North 5O,O0O to the South 60.000 to the East 60.000 to the West of Division Village taluka Naqpur District Naqpur PIN 441122 admeasuring 3000,000 Sq.Mts. area being developed by promoter,s Name:- OU SHRI NANAJI LMMAN KONDAWAR 02} SHRI GAJANAN MADHUKAR AINCHWAR 03) SMT. ANITA PRAVIN AINCHWAR Ref :J MahaRERA Registration Number Sir, I Nitin M. Zade have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project Proposed to be registered under MahaRERA, being Rs, 4,50.ooo,oo.ooo Building situated on the plot bearing c.N" No./crs No./ surveyNo./ the plot No.-x293, At MOUZA-RENGAPAR BUT|BORI INDUSTRIALAREA of Division vilfafe taluka Naqpur District Naspur ptN4411z2 admeasuring 3000.000 Sq.Mts. area being developed by promoter,s Name;_ OU SHRI NANAJI LAXMAN KON,DAWAR 02) SHRI GAJANAN MADHUKAR AINCHWAR 03) sMT. ANTTA PRAVTN ArNC{WAR 1. Following technical professlionals are appointed by Owner / promoter :- (i) shri Nitin M, ZADE as L.S. .,"lftar;ri Arun Uttarwar as Structural Consultant" (iii) M/s/ Shri /Smt as MEP Consultant. (Not appointed) (iv) Shri Nitin M. ZADE as Site Supervisor. 2' we have estimated the cost of the completion to obtain occupation certificate / completion certificate, of the civir, MEp AND AIried works of , the Buirding (s) of the project, our estimated cost calculations are based on the Drawing pran made / avairabre to us for the project under reference by the Deveroper and consurtants and the schedure of items and quantity for the entire work as calculited by Nitin M. zade quantity surveyor * appointed by Deveroper / EnSineer, and the assumption of the cost materiar, rabour and other inputs made by deveroper, and the site inspection carried out by us. 3' we Estimate total Estimated cost of completion ot the builaing (s) of the aforesaid project under referpnce as Rs. . 4,50,000,00.000 (Totar of Tabre A and B), The estimated totar cost of project is with reference to the Civil, MEp and Allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the MtDc BUT|BoRI being the planning Authority under whose jurisdiction the aforesaid project is being impremented. 4. The Estimated cost rncurrecl ti date is carcurated at Rs. 2,98,oo.ooo.oo(Totar of Tabre A and B) The amount of Estimated cost lncurred is calculated on the ille of amount of Totar Estimated cost. 5' The Balance cost of compretion of the civir, MEp and Alried works of the Buirding (s) subject proiect to obtain occupation certificate of the / comptetion certificate from MtDc BUTIB.RI (PlanningAuthority}isestimatedatRs.1,52,ooo,oo.oo1rotalofrabteaa;;;- 6' I Certify that the cost of the civir ,MEp and Aflied work for the aforesaid project as compreted on the date of this certificate is as given in Table A and B below: ::i'::,{ yr::::",", *,,,0*---'.:':u;:l::l^,,,^, separately for each Buitding / Wing of th€-ieal Estate project) *^-.,",,..,(,o be prepared Sr.No" Particulars 1 Total estimated.cost of the Building/no Wing as on 27-07 -2077 date dl Registration is 2 Cost incurred aS on Z7-O7-ZOL7 (Based on the Estimated Cost) 3 Work done in percenfage 4 (as percentage ofthe estimated cost) r Balance Cost to be lniurred .,.1{e (Based on Estimated Cost) 5 Cost lncurred on Additional /Extra ltems The Estimated Cost (Annexure A) TABLE B (to be prepared for the entire registered phase of the Real Estate project) Sr. Particulars Amounts No 1, Total Estimated cost of the lnternal and External Development Rs. 4,50,000,00.00 Works including amenities and facilities in the layout as on _--- date of Registration 's 2" Cost incurred as on date27-07-2012 Rs. 2.98,000,00.00 (Based on the Estimated Cost) 3 Work done in Percentage 66% (as percentage of the estimated cost) 4 Balance Cost to be lncurred Rs. 1.52.000,00.00 Based on Estimated Cost) Cost incurred on Additional /Extra ltems As on date27-07-2017 NIL not included in The Estimated Cost (Annexure Yours FaithfL#g \ - r'i.1 ' signa\$6 aorurmu NITIN M, ZADE L.S. (NMC LIC NO.:573) (NlT LIC NO.:244s) *Note The Scope of the work is to comprete entire neat Estate project as per Drawings approved from time to time so as to obtain O.ccupatton Certificate Completion 'by / Certificate. 2" (x) Quantity survey can be done office of Engineei or can be done by an independent quantity surveyor. whose certificate of quantity carcurated can be reried upon by the ingineer " ln case of lndependent quantity surveyor being appointed by Developer, the name has to be mentioned at the place rnarked (+)and in case quantity are being calculated by office of Engineer the name of the person in the office of Engineer. who is responsibre for trr" qra,tiiv calculated should be mentioned at the place rnarkedJ*!. , The estimated cost inrudes a, iabour, materiaN, equipment and rnachinery and.machinery required to carry out entire Work. 4. As this is an estimated cost, any deviation in quantity required for deveropment of the Rear estate Project will result ip amendment of the cost lncurred / to Qe incurred. . r.,.4r,5" All components of work with specification are indicative ani not exhaustive. Annexure A (Not Required) List of Extra / Additional ltems Executed with Cost (Which were not part of the Original Estimate of Total Cost)