FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) To, The GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD Pune (M Corp.), Pune City, Pune, 411001 Quality Assurance Certificate Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of GLOCAL SQUARE 3 RD FLOOR having MahaRERA Registration Number P50500025959 being developed by GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD Sir, I/We Anand Shirsat have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has Yes Soil investigations of the site has been conducted before the structural been conducted before the structural design and soil design and soil parameters have been parameters have been accounted accounted for in the structural for in the structural design/drawings? design/drawings 2 Whether Structural Engineer has been Yes Name: G A BHILARE appointed for the project? License No: M145316/5 Mobile: 2025446001 E-mail: Admin@gabcpl.com Page 1 of 4 3 Whether the inspection registers, site order Yes book and quality control test registers are maintained at the site properly and endorsed by the Engineer–in- Charge? 4 Whether testing facilities to check quality of Yes Testing facilities to check quality material is available at site? of material is available at site Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for Yes The statuary provisions for disaster disaster resistance/earthquake resistant resistance/earthquake resistant design have been incorporated, specially in design have been incorporated, case of multi-storeyed construction? specially in case of multi-storeyed construction 6 Has suitable cognizance been taken on Yes Suitable cognizance been taken demarcated flood lines and appropriate on demarcated flood lines and appropriate precautions taken for precautions taken for protecting the site protecting the site from flooding from flooding considering local flooding considering local flooding issues issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials Yes confirm to relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittings and accessories Yes (d) Plumbing and sanitary fittings Yes 2 Whether regular tests of materials and Yes Regular tests of materials and construction products are being done from construction products are being accredited labs also? If yes, details of done from accredited labs also such labs 3 Whether manufacturer test certificate for Yes Manufacturer test certificate for cement, steel, pipes etc. have been cement, steel, pipes etc. have been obtained and whether obtained and whether supply records are supply records are being being maintained? maintained 4 Whether suitable water is being used for Yes Suitable water is being used for construction? construction (i) What is the source of water? Yes water tanker (ii) Has water been tested and Yes Water been tested and approved approved by Engineer-in-Charge by Engineer-in-Charge before before construction? construction (iii) Has water been tested subsequently as Yes Water been tested subsequently per requirement? as per requirement 3. Quality of Workmanship Page 2 of 4 Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes Works of all the electrical wiring/connections/lift installation/other wiring/connections/lift electrical installations have been carried out under authorized/registered electrical installation/other electrical engineer and whether records of the same installations have been carried out has been maintained? under authorized/registered electrical engineer 2 Whether all related works of plumbing & Yes All related works of plumbing & sanitary including installation of water sanitary including installation of supply systems, drainage systems, sewage systems, sinks, toilets etc. have been water supply systems, drainage carried out under authorized/registered systems, sewage systems, sinks, plumbers/sanitary contractors and whether records of the same has been maintained? toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors 3 Whether all the work is being carried out Yes All the work is being carried out under supervision of experienced and under supervision of experienced skilled professional? Further, whether the workmanship and quality is satisfactory and skilled professional and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are Yes Remedial measures are undertaken to prevent dampness and undertaken to prevent dampness leakages? If yes, provide details and leakages 5 Whether safety precautions are undertaken Yes Safety precautions are undertaken during construction activities for all type of during construction activities for all type of workers workers? 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is Yes Third party quality inspection is being carried out on site during/after being carried out on site completion of the works? If yes, provide during/after completion of the details. works 2 Whether anti-termite treatment has been Yes Anti-termite treatment has been undertaken for the soil? undertaken for the soil 3 Whether fire-fighting arrangements has Yes Fire-fighting arrangements been undertaken under supervision of fire has been undertaken under supervision of fire consultant consultant? 4 Whether proper signages have been Yes Proper signages have been installed on site/completed building as per installed on site/completed building as per requirement requirement? 5 Whether precautions are undertaken to Yes Precautions are undertaken to avoid air pollution during construction? avoid air pollution during Please specify. construction Page 3 of 4 6 Whether records of all test reports/results Yes All test reports/results have been have been properly kept in the prescribed properly kept in the prescribed formats and whether the same are available at site for viewing by allottees formats and whether the same are and to be handed over to the association of available at site allottees? 7 Whether all relevant records including Yes all relevant records including sanctioned building plans, utility drawings, sanctioned building plans, utility various test reports/results have been properly kept in the prescribed formats to drawings, various test be handed over to the association of reports/results have been properly allottees? kept in the prescribed formats 8 Any innovative/cost effective/green No technology has been used for improving quality/energy efficiency? Please specify. Yours Faithfully Signature of Engineer (Site Supervisor) Name: Qualification (Not less than graduate) License No. (if any): Phone No: Place: Agreed and accepted by Signature of Promoter Name: GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD Page 4 of 4