qrchitects & interior 'r.#,Ht r , H DESIGN CONSUTTANCY & CONTRACT EXECUTION DATE: 30-06-2021 ARCHITECT' S CERTIF'ICATE To, Luxora Infrastructures Pvt. Ltd. Office No - 1207, l2th Floor, A-Wing, 02 Commercial Building, 23-24 Minerva Industrial Estate, Off. LBS Road, Mutund (W). Site Address: On the Plot bearing Khasra Nos- 48/2,50,51, 5612,6311,6312,6411, 6412,6511' 65t2, 6514, 65t5, 66t1,6612, 68, 69,70,71,73t1,7312,74,7511,7513,7514,76, 77,78,79, 8011, 80/2, 80/3, 8ln,8lt2,8l-2ll,8l-212,81-213,81-214,81-215,81-216,82, 83, 8411,8412,8511,8512, 85/3, 86-A, 86-F,llll & 86-Bllt2,86-8t2,87, 88-1, 2,3,4,9011,9012,91,92,93,94,951A,9518, g6n,9612,9613,9614,97tL,97t2,9713,98,99tL,9912,10012,10111,10112,102,103,l04ll,l04l2, 1 04/3, 105/1, l05t2,l06ll,10612, 107, 108/1, 108/2, 108/3, 109/3, 1 10/1(1 10/4 new), I l0/2(l 10/5 new), Demarcated by boundaries- Plot of Pora river on the north, Khasra nos. 46, 47,52,55'57 and-others on the south, Pipla - Kharsoli road on the East, Ghogli village boundary on the west, Village Pipla, Tahsil- Nagpur(Rural.), District- Nagpur- 440034, admeasuring I l'60'000 Sq.Mtr. area. Developed By Luxora Infrastructures Pvt. Ltd. Reference MahaRERA Regibtration, Number P50500003509 Subject Certificate of Percentage Completion of construction work of I No of building, 'Vista-3B' of the Project Ensaara Metropark which is part of l't Phase. ( RERA No.- P50500003509 ) Sir, I/we STUDIO ELEVEN have undertaken assignment as an Architect/Licensed surveyor of certifuing percentage of completion of construction work of the 01 No buildings of Ensaara Metropark which is part of First Phase of the project situated on plot bearing Khasra Nos- 48/2, 50,51, 5612,6311,6312,6411, 6412,6511,6512,6514,6515,6611,6612,68,69,70,71,7311,7312, 74,7511,75/3,7514,76,77,78,79,8011,8012,80/3,81i1,8112,81-2ll,8l-212,81-213,81-214,81' 215,81-216,82,83,8411, 8412, 8511,8512,85/3, 86-4, 86-8,llll &. 86-Bll12,86'812,87, 88-1, 2, 3,4,9011,9012,91,92,93,94,951A,9518,9611,9612,9613,9614,9711,9712,9713,98,9911,9912, lo0l2,lolll,loll2,1o2,l03, 104/1, 10412,10413,10511,10512,10611,10612,107,108/1, 108/2, 108/3, 109/3, I l0/l(110/4 new), ll\l2(ll0/5 new), Demarcated by boundaries- Stretch of Pora river on the north, Khasra nos. 46, 47 , 52,55, 57 and others on the south, Pipla - Kharsoli road on the East, Ghogli'village boundary on the west, Village Pipla, Tahsil- Nagpur(Rural.), District- Nagpur- 440034, admeasuring 11,60,000 Sq.Mtr. area. being developed by Luxora Infrastructures Pvt. Ltd. plot no 61, shordo Nogor, hudkeshwor police stotion rood, neor vithobo lown, Nogpur 440034, www.sludioeleven.in #t 1l:|.:, r* orchitecls & interior DESIGN CONSUTTANCY & CONTRACT EXECUTION l. Following technical professionals are appointed by Luxora Infrastructures Pvt. Ltd- (r) lWs. Kadri Consultants Pvt. Ltd' as an Architectl (ii) M/s. G.N. Systech as Structural Consultant, 2. Based on site inspection, with respect of each of the building of the aforesaid Real estate Project, I/we certifu that as on the date ofthis certificate, the percentage ofwork done for each of the building/wing of Real Estate Project are registered vide number under MahaRERA is as per Table A herein below. The percentage of work executed with respect to each of the activity of entire phase is detailed in Table B. Table A BUILDING NAME: VISTA 3-B PERCENTAGE COMPLETION AS ON JUNE.zOAT "hage of Sr.No Task / Activity Work Done I Excavation 100% 2 RCC Sub Structure s7% 5 Stilt Floor 0% 4 RCC Superstructure 0% Internal Wall, Internal Plaster, Flooring with Flats/premises, door and 0% 5 windows to each of the Flat/Premises. Sanitary Fitting within the Flats/ premises, Electrical Fitting within the 0% 6 Flats/Premises. Staircase Lift Well Lobby's at Each Floor Overhead & Under Ground 0% 7 Water Tank. External Plumbing & External Plaster Elevation completion of terrace 0% 8 with water proofing of building Installation of lifts water pumps fire Fighting Fittings Equipment as 0% per CFO NOC. Electrical Fittings, Common Area Electromechanical Equipment's, Compliances to condition of environment / CRZ NOC 9 Finishing to entrance Lobby, Plinth Protection, paving of Areas appurtenant to building/ wing common wall & other requirement as may be required to obtain occupation / Completion Certificate. plol no 61. shordo Nogor, hudkeshwor police slotion rood, neor vithobo lown, Nogpur 440034, www.studioeleven.in #t E H Table B orchitects & interior DESIGN CONSUTTANCY & CONTRACT EXECUTION lLL'I1\U Sr.No Description- Toage of Work llone 1 Internal Road & footpath 62.0804 ) Water Supply 35.440/o 3 Sewerage (Sewer lines and Chanbers) 66.73% 4 Strom Water Drain 66.73% 5 Land Scape & Tree Planti4g 80% 6 Street t0% 7 Community Bui lding (Including Interior Work) s0% 8 Treatment and disposal of sewage and sullage water 9.74% 9 Solid waste management and 0% 10 Water conservation, rain water L 0% 0% 11 Energy management L2 Fire protection and fire safety requirements 0% 13 Electrical meter room, substation, receiving s 36.89% Thanking You, Your's Sincerely; For STUDIO ELEVEN Architect SACHIN KUKADE \*P'^r ,/\ Sa ch i n, K,,L* cAlz()oTstlea ?,:"i t lnr 2rJ7 NMC/R-483 plot no 61, shordo Nogor, hudkeshwor police stotion rood, neor vithobo lown, Nogpur 440034, www.studioeleven.in