P"S"CONSUTTANTS DATE: 30-09-2013 To. Luxora Infrastructures Pvt. Ltd. 6'r' f1oor, Sur.r Plaza, llariom Nagar, Off Eastern Express highway, Mulund (East), Mumbai - 400 08i. site Adctress: on the PIot bearing tr(hasra Nos- 43/2, 50, 51, 56/2, 6311.,6312,6411. 6412, 6511, 65/2, 6514, 65t5,,6611,6612,68,69,70,71,7311,73/2,71,7511,7st-1,7514,76,77,73,79.30t1,3012'3013,31/1,31/2,31- 2t7,E7-2t2,81-213,81-7t4,81-2t5,81-216,32,83, U4l1, 3412,35t1,85/2, 35/3. 36-.\, 35-B/1/1 <8 86-B/1i2,36- B/2, 87, 88-1, 2,..3, 4, g0ll, g0/7, 91, 92, 93, 94,95/A, 95/8. 9611, 96/7, 9613, 96t'!. g'.i /1, 9712, 9713, 93, 9917, 9gl2:, 10012,,10711, 101t2,102, 103, 10111,104t2, 104/3, 105/1, 1051?, 10611, L06/1, Lqi,10lj/1, 108/2- 108/3. 109/3, 110/1(Ug( new), 110/2(110/5 nell), Demarcated by bou daries- Plot of rcr:a ri.'er on thc north, Klrasra' nos. 46,:47,52,55, 57 and others on tl're south, Pipla - I(harsoli road on tlle Easi. Ghogli village boundary on the west, village Pipla, 'fahsil- Nagpur(Rural.), District- )agprrr- .14003,{, admc.rsuring 1 1,60,000 Sq.Mtr. area. Developed By : Luxora Infrastructures Plt. Ltd. Reference : MahaRERA Registration Number P50500003509 Subject : Certificate of Percentage Completion of construction work of 1 )io of brrilding. 'Yista- 3l]' olthe Ploject Ensaara .N{etroparh rvhich is part of 1"' Phnsc. ( RERA No.- P50500003s09 ) Sit', I/we Sanrachna have undertaken assigt'mrent as an Architect/Licensed surveyor of certifyilrg petcerltage of conpletion of construction work of tire 01 No builciings of Ensaara Metropark is part of First Phasc of "r'hich tlie prqect situated on plot bearing Klasra Nos- 48/2. 50, 51 . 562, 63/1 , 6312, 6411. 642. 65/1. 6512, 65 1. 6515. 6611,66/2,68,69,70,71,731,13/2,74,7511,7513,75t4.16.77.78.79.80/1,E0/1.80i3.81/1.81/2,81-l/1.81- ztL, 81-213, 8l -214, 81-215, E1-2i6. E2, 8-1. 84i l. S4/2,85/1,85/2,35ii.36-A..36-811/1 .t 36-B1112, 86-8/2, E7. 88-1,2,,3,4, gO/1,9012,91,92.93,94,951A,95t8,9611.9612.9613,9614,9711.97n.91',-i' 98.99/1,99/:. 100/2, l0l/1, 10I/2, 102; 103, l}4tt. 10412, 104/3. l0s/1, 1,0512, 106/1, t0612, 107. 103i1, l0Ei2, 108/3. 109/3, llOil(lllQ/4 nei)i 110i2(110/5 new), DeDrarcated by bounclaries- Stretch ofPora river on the north. Khasra ,or.'+6.1+q,52,1,5.57 and orhers on the south, Pipla - I(harsoli road on the East, Ghogli villatc boundary on the west, Village fiirla, fanslt- Nagpur(Rural.), District- Nagpur- 440034, adrneasuring 11,60,000 Sq.Mtr. area. beir.rg developed by Luxora Infrastnlctures Pvt. Ltd. l. Following technical professionals are appointed by Luxora lnfra sfrrr ctures Pvt. Ltd. (D M/s, Kadri Consultants Pvt. Ltd. as an Architect; (iD M/s. G.N. Systech as Structural Consultant, 2. Based on site inspection, with respect of each of the building of the aforesaid Real estate Project, Vwe certify that as on the date of this certiflcate, the percentage of work doae for each of the building/wing of Real Estate project are registered vide number under MahaRERA is as per Table A herein below. The percentage of work executed with respect to each ofthe activity of entire phase is detailed in Table B' Page 1of2 Table A IIUILDING NI\ME: VISTA 3-l] CENTAGE COMPLETI Toage of Sr,No Task / Activity Worh Done I Excavation t00yo 2 RCC Sub Structure 57% j%o 3 Stilt Floor 4 RCC S erstr:uctLrre 0% Internal Wall, Intemal Plaster, Flooring with Flats/premises, door and windows to 0% 5 each of the Flat/Premises. Sanitary Fitting within the Flats/ premises, Electrical Fitting within the 0% 6 FlatVPremises. 7 Staircase Lift Well Lob s at Each Floor Overhead & Under Ground Water Tank 0% External Plumbing & External Plaster Elevation completion of terrace with water 0% 8 roofin ofbuildi lnstallation of lifts water pumps fire Fighting Fittings Equipment as per CFO NOC. 0% Electrical Fittings, Conrrnort Area Electrorneclran ical Equipment's. Contpliances to 9 condition ofenvironment / CRZ NOC Finishing to etltrance Lobby, Plinth Protection, paving of Areas appurtenant ro building/ wing coutllon wall cQ. other requirement as nt il be to obtain occu ation / Com letion Certificate INTERNAL & EXTERNAI DEVELOPMENT IN RESPECT O PIIRCENTr\G E COMPLETION AS ON SEPTEMBER.2OIS Sr.No _1- Intemal Road & foot ath 62.080/o 2 Water S 35.44% 3 Sewera Sewer lines and Chanbers A. Strom Water Drain 5 Land Sca e & Tree Plantin 80% 6 Street Li hr 7 Communi Buil (lncludin Interior Work) 50% Treatment and di saI of sewa e and sulla 9 Solid waste mana ement and dis sal 0o/o 10 Water conservation, rain water harvestiug 0% 11 En el' nlana elrent 0o/o t2 F rotection and llre sa uirements 0% l3 EI al rneter room. substatioll. rcccivirl \ l 't1 l(, il 36.89% Thanking You, Your's Sincerely, FoT P S CONSULTANTS cr\y RASHMIPINGLE Architect cNz00s135678 (\rrT-2s09/coA) Page 2 of 2