SANRACHNA SATYENDRA GUPTA architects  interiors  engineers  landscape Architect Plot No:- 08, S.B.I. Colony, Old Sneh Nagar, Behind CA / 2001 / 28453 Nav-Bharat Press Building, Wardha Road, Nagpur-15 Mobile : +91-9011015528 & +91-9011016273 Land Line : +91-712-2293834 E-Mail : arsatyengupta@gmail.com ------------------------------------------------------------------------------------------------------------------------------------------------- Ref : SAN / NAG / LIPL-Ensaara / MahaRERA Architect’s Certificate / RP-2B / 02 Date : 30-10-2017 ARCHITECT’S CERTIFICATE To, Luxora Infrastructures Pvt. Ltd. 6th floor, Sun Plaza, Hariom Nagar, Off Eastern Express highway, Mulund (East), Mumbai – 400 081. Site Address: On the Plot bearing Khasra Nos- 48/2, 50, 51, 56/2, 63/1, 63/2, 64/1, 64/2, 65/1, 65/2, 65/4, 65/5, 66/1, 66/2, 68, 69, 70, 71, 73/1, 73/2, 74, 75/1, 75/3, 75/4, 76, 77, 78, 79, 80/1, 80/2, 80/3, 81/1, 81/2, 81-2/1, 81-2/2, 81-2/3, 81-2/4, 81-2/5, 81-2/6, 82, 83, 84/1, 84/2, 85/1, 85/2, 85/3, 86-A, 86-B/1/1 & 86-B/1/2, 86-B/2, 87, 88-1, 2, 3, 4, 90/1, 90/2, 91, 92, 93, 94, 95/A, 95/B, 96/1, 96/2, 96/3, 96/4, 97/1, 97/2, 97/3, 98, 99/1, 99/2, 100/2, 101/1, 101/2, 102, 103, 104/1, 104/2, 104/3, 105/1, 105/2, 106/1, 106/2, 107, 108/1, 108/2, 108/3, 109/3, 110/1(110/4 new), 110/2(110/5 new), Demarcated by boundaries- Plot of Pora river on the north, Khasra nos. 46, 47, 52, 55, 57 and others on the south, Pipla – Kharsoli road on the East, Ghogli village boundary on the west, Village Pipla, Tahsil- Nagpur(Rural.), District- Nagpur- 440034, admeasuring 11,60,000 Sq.Mtr. area. Developed By : Luxora Infrastructures Pvt. Ltd. Reference : MahaRERA Registration Number P50500003509 Subject : Certificate of Percentage Completion of construction work of 1 No of building, ‘Vista-3B’ of the Project Ensaara Metropark which is part of 1st Phase. ( RERA No.- P50500003509) Sir, I/we Sanrachna have undertaken assignment as an Architect/Licensed surveyor of certifying percentage of completion of construction work of the 01 No buildings of Ensaara Metropark which is part of First Phase of the project situated on plot bearing Khasra Nos- 48/2, 50, 51, 56/2, 63/1, 63/2, 64/1, 64/2, 65/1, 65/2, 65/4, 65/5, 66/1, 66/2, 68, 69, 70, 71, 73/1, 73/2, 74, 75/1, 75/3, 75/4, 76, 77, 78, 79, 80/1, 80/2, 80/3, 81/1, 81/2, 81-2/1, 81-2/2, 81-2/3, 81-2/4, 81-2/5, 81-2/6, 82, 83, 84/1, 84/2, 85/1, 85/2, 85/3, 86-A, 86- B/1/1 & 86-B/1/2, 86-B/2, 87, 88-1, 2, 3, 4, 90/1, 90/2, 91, 92, 93, 94, 95/A, 95/B, 96/1, 96/2, 96/3, 96/4, 97/1, 97/2, 97/3, 98, 99/1, 99/2, 100/2, 101/1, 101/2, 102, 103, 104/1, 104/2, 104/3, 105/1, 105/2, 106/1, 106/2, 107, 108/1, 108/2, 108/3, 109/3, 110/1(110/4 new), 110/2(110/5 new), Demarcated by boundaries- Stretch of Pora river on the north, Khasra nos. 46, 47, 52, 55, 57 and others on the south, Pipla – Kharsoli road on the East, Ghogli village boundary on the west, Village Pipla, Tahsil- Nagpur(Rural.), District- Nagpur- 440034, being developed by Luxora Infrastructures Pvt. Ltd. Page 1 of 3 SANRACHNA architects  interiors  engineers  landscape ----------------------------------------------------------------------------------------------------------------------------------- 1. Following technical professionals are appointed by Luxora Infrastructures Pvt. Ltd. (i) M/s. Kadri Consultants Pvt. Ltd. as an Architect; (ii) M/s. G.N. Systech as Structural Consultant, 2. Based on site inspection, with respect of each of the building of the aforesaid Real estate Project, I/we certify that as on the date of this certificate, the percentage of work done for each of the building/wing of Real Estate Project are registered vide number P50500003509 under MahaRERA is as per Table A herein below. The percentage of work executed with respect to each of the activity of entire phase is detailed in Table B. Table A BUILDING NAME: VISTA 3-B PERCENTAGE COMPLETION AS ON OCTOBER-2017 %age of Sr.No Task / Activity Work Done 1 Excavation 100% 2 RCC Sub Structure 57% 3 Stilt Floor 0% 4 RCC Superstructure 0% Internal Wall, Internal Plaster, Flooring with Flats/premises, door and 0% 5 windows to each of the Flat/Premises. Sanitary Fitting within the Flats/ premises, Electrical Fitting within the 0% 6 Flats/Premises. Staircase Lift Well Lobby’s at Each Floor Overhead & Under Ground Water 0% 7 Tank. External Plumbing & External Plaster Elevation completion of terrace with 0% 8 water proofing of building. Installation of lifts water pumps fire Fighting Fittings Equipment as per CFO 0% NOC. Electrical Fittings, Common Area Electromechanical Equipment’s, Compliances to condition of environment / CRZ NOC Finishing to entrance 9 Lobby, Plinth Protection, paving of Areas appurtenant to building/ wing common wall & other requirement as may be required to obtain occupation / Completion Certificate. Table B INTERNAL & EXTERNAL DEVELOPMENT IN RESPECT OF BUILDING VISTA 3-B PERCENTAGE COMPLETION AS ON OCTOBER-2017 Sr.No. Description %age of Work Done 1 Internal Road & footpath 58.76% 2 Water Supply 30.15% 3 Sewerage (Sewer lines and Chanbers) 66% 4 Strom Water Drain 66% 5 Land Scape & Tree Planting 80% Page 2 of 3 SANRACHNA architects  interiors  engineers  landscape ----------------------------------------------------------------------------------------------------------------------------------- 6 Street Light 0% 7 Community Building (Including Interior Work) 31% 8 Treatment and disposal of sewage and sullage water 9.74% 9 Solid waste management and disposal 0% 10 Water conservation, rain water harvesting 0% 11 Energy management 0% 12 Fire protection and fire safety requirements 0% 13 Electrical meter room, substation, receiving station 36.89% Thanking You, Your’s Sincerely, For SANRACHNA SATYENDRA GUPTA Architect CA/2001/28453 Page 3 of 3