H.D.P.E.Pipe Line Works Building Construction FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 26.07.2017 To MIs. Mahalaxmi Infra, N - 103, Laxmivihar Apartment Wardha Road, Somalwada, Nagpur - 440025 Subject: Certificate of Cost Incurred for Development of [Nakashtra - III] Project ( MahaRERA Registration Number) situated on the Land bearing Survey no. 56 demarcated by its boundaries by Survey no. - 52 to the North, to the South Nallah, to the East Survey no. 57 & Balance portion of Survey no. 55 to the West of Division - Nagpur, Village _ Wagdhara, Taluka - Hingna, District - Nagpur, PIN - 441122 admeasuring 16200.00 Sq.Mtrs. area being developed by MIs Mahalaxmi Infra Ref: MahaRERA Registration Number -_ Sir, I Rajesh Rewatkar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being entire Project, situated on the ___ v- .." plot bearing Survey no. 56 , of Division - Nagpur, Village - Wagdhara, Taluka - Hingna, District ~' ~ - Nagpur, Pin - 441122 admeasuring 16200.00 sq.mts. area being developed by [MIs. Mahalaxmi \ . Infra) Rajash I. R~~tbg' !ng~Ic,..w .... ,wEfjPUr !,.", 1. Following technical professionals are appointed by Owner / Promoter :_ (i) Shri. Pawan R. Gupta L.S. / Architect; (ii) Shri Rajesh Rewatkar Engineer· 2. We have estimated the cost of the completion to obtain Completion Certificate, of the site development works, of the project as approved by NMRDA. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Rajesh Rewatkar Engineer· appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 1,02,00,000/- ( Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining completion certificate for the building(s) from the NMRDA being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 72,39,651/- (Total of Table A and BL- The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Completion Certificate from NMRDA (planning Authority) is estimated at Rs NIL( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A NAKSHTRA -III NO BUILDING CONSTRUCTED Sr. No. ParticularS Amounts 1 Total Estimated cost of the building/wing as on 26/07/17 NOT date of Registration is APPLICABLE 2 Cost incurred as on 26/07/17 NOT (based on the Estimated cost) APPLICABLE 3 Work done in Percentage NOT (as Percentage of the estimated cost) APPLICABLE 4 Balance Cost to be Incurred NOT (Based on Estimated Cost) APPLICABLE 5 Cost Incurred on Additional/Extra Items NOT as on 26/07/17not included in APPLICABLE the Estimated Cost (Annexure A) R;~~ ~a,C~~ [.~'~gi)f TABLE B NAKSHTRA -III : LAYOUT DEVELOPMENT WORKS Sr. Particulars Amounts No 1 Total Estimated cost of the Internal and External Rs. 1,02,00,000/- Development Works including amenities and Facilities in the layout as on date of Registration is 2 Cost incurred as on Rs.72,39,651/- (based on the Estimated cost) 3 Work done in Percentage 71% (as Percentage of the estimated cost) 4 Balance Cost to be Incurred Rs. 29,60,349/- (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra Items as on 26/07/17 not Nil included in the Estimated Cost (Annexure A) Yours Faithfully c , e,i(~~h' ,~v:: :)~~~_. "';(~.',"' .. EnglTir',':i:: f~.'~'.'.~':