--- ------ PAWAN ~V'P~~D GUPTA CONSlJL7rNG CIVIL ENGINEER PlANNERS, f;[J(LT)ERSAND DEVELOPERS LICENSE, NO, N,I.l1161, N,H,C, 3g0 orr PlOi NO A 23, 24 MANAV SEWA NAGAR SFMINARY HilLS, NAGPUR 440006 M 9923432949 ARCHITECT'S CERTIFICATE Date: 2S-/ c~ l2C \ '1 To MIS Mahalaxmi Infra N-103, Laxmivihar Apartment, Wardha Road, Somalwada, Nagpur-440025 Subject: Certificate of Percentage of Completion of Development Work of the entire Project [MahaRERA Registration Number] situated on the land bearing Survey no. 56 demarcated by its boundaries by survey no.52 to the North, By Nallah to the South, survey no. 57 to the East, & survey no. 55 to the west of division - Nagpur, Village - Wagdhara, Taluka- Hingna, District- Nagpur PIN 441122 admeasuring 8817.00 sq.mts. area being developed by [Mahalaxmi Infra] Sir, 1/ We Pawan R. Gupta have undertaken assignment as Architect lLicensed Surveyor of certifying Percentage of Completion of Development Work of the entire Project, situated on the plot bearing Survey No,56,of Division -Nagpur , Village- Wagdhara , Taluka- Hingna, District - Nagpur PIN- 441122 admeasuring 8817.00 sq.mts. area being developed by Mis. Mahalaxmi Infra. 1. Following technical professionals are appointed by Owner I Promoter :- (i) Shri. Pawan R. Gupta as L.S. I Architect; (iv) Shri. Satish Lingalwar as Site Supervisor Based on Site Inspection, with respect to the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for the entire Real Estate Project as each as registered vide number under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building /Wing Number__ (to be prepared separately for each Building fINing of the Project) Sr. Tasks IActivity Percentage of No work done 1 Excavation Not Applicable 2 number of Basement(s) and Plinth Not Applicable 3 number of Podiums Not Applicable 4 Stilt Floor Not Applicable 5 number of Slabs of Super Structure Not Applicable 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors Not Applicable and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Not Applicable Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Not Applicable Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of Not Applicable terraces with waterproofing of the BuildingflNing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as Not Applicable per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate NOTE. Table -A is not applicable to this project as it is a project of plotted development (layout of plots) and not construction of building. TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S.No Common areas and Facilities, Proposed Percentag Details Amenities (Yes/No) e of Work done 1 Internal Roads & Footpaths YES 100% As per NMRDA Specification 2. Water Supply YES 100% As per NMRDA Specification 3. Sewerage (chamber, lines, Septic YES 100% As per NMRDA Tank, STP) Specification 4. Storm Water Drains YES 100% As per NMRDA Specification 5. Landscaping & Tree Planting YES 100% Tree Plantation Done 6. Street Lighting YES 50% Electric Network Complete Street Light Pending 7. Community Buildings NO 8. Treatment and disposal of sewage YES 100% As per NMRDA and sullage water Specification 9. Solid Waste management & Disposal NO 10. Water conservation, Rain water YES 100% As perNMRDA harvesting Specification 11. Energy management NO 12. Fire protection and fire safety NO requirements 13. Electrical meter room, sub-station, NO receiving station 14. Others ( Option to Add more) YES 100% Fencing with gate for Open space Open space NOTE- Entire development work In the project IS completed as per specifications given by NMRDA (Nagpur Metropolitan Regional Development Authority) & handed over to the Gram Panchayat For future maintenance and repairs. Yours Faithfully ~ .. (J?a't-tJan ~ qupta PLANNER & DESIGNER B.E. Civil Off.:Plot No.A·23,24 Manav Sava Nagar, Seminary Hills, Nagpur N.I.T.L.S. No.:1969 N.M.C.L.S. No.: 380 Mob. No.:9923432949