Ar. SANIAY SONI Architect, Interior Designer, Planner Shri Rishabh Appt, 10/304 Ganesh Nagar, Near S.D. Hospital Nagpur, Mobile - 7 507 544662 FORM .4(UT) ARCHTTECT'S CERTT FTCATE Date: 28-10-2020 To The Pyramid Ventures India Private Limited, "Ganesh-snehal Apartment,'South Ambazari Road, Shraddhanandpeth, Nagpur - 440010. Subject: Certificate of Comptetibn tt Construction Work of 6 Buildings 1 consist of (Tower A), Buildings 2 consist of (Tower B), Buildings 3 consist of (Tower C, D, E & F) of the project I P50500003311 ] situated on the Plot No. Land, Kh. No. 3912,Mouza - Gawsi Manapur, Tah. Nagpur (Gramin), Distt. Nagpur. demarcated by its boundaries ( latitude and longitude of the end points) 15.00 MT Wide Road to the North, Kh. No. 9 to the South, Kh. No. 39/3 to the East, Kh. No. 9 to the West of Division Nagpur, Tahsil- Nagpur (Gramin) District Nagpur. PIN - 441108. admeasuring 16006.30 sq.mt. Plot Area being developed by Pyramid Ventures India Private Limited. Sir, I Ar. Sanjay Sonf hbve undertaken assignment as Architect of certifying Completion of Construction Work of 3 Buildings I Buildings 1 consist of (Tower A), Buildings 2 consist of (Tower B), Buildings 3 consist of (Tower C, D, E & F) ], situated on the, Land, Kh. No. 39/2, Mouza - Gawsi Manapur, Tah. Nagpur (Gramin), District Nagpur, PIN - 441108 admeasuring 16006.30 sq.mt. Plot area being developed by Pyramid Ventures India Private Limited. 2. Following technical professionals are appointed by Owner / Promoter :- (i) Shri. Sanjay Soni as L.S. i Architect ; (ii) Shri. Avinash Bhatt as Structural Consultant (iii) Technic Consultancy Services Shri Ram Karu and Kishor Kogje as Plumbing Consultant (iv) Shri.sanjay Mulmule as Site Engineer. 3. Based on Completion Certificate received from Structural Engineer and Site Engineer; and to the best of my/our knowledge I hereby certify that Buildings 1 consist of (Tower A), Buildings 2 consist of (Tower B), Buildings 3 consist of (Tower C, D, E & F) has been completed in all aspects and is fit for occupancy for which it has been constructed. We will apply all 3 Buildings consist of Buildings 1 consist of (Tower A), Buildings 2 consist of (Tower B), Buildings 3 consist of (Tower C, D, E & F) for Occupancy Certificate with in 60 days and submit to RERA as soon as we received the same. Yours Faithfully ( AR. SANJAY SON| ) .d-i