FORM-2 [see Regulation 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 2910712017 To The Pyramid Ventures India Private Limited, 101 Ganesh Snehal APartment, South Ambazari Road, Shraddhanand Peth, Nagpur - 440022 subject : certificate of Percentage of completion of construction work of 3 No. of Building(s)/ 6 Wing(s) ofthe 1"t Phase ofthe Project [MahaRERA Registration Number] situated on the Plot bearing Khasara No. 39/2 Division Nagpur village Gawasi Manapur taluka Nagpur (Rural) District Nagpur PIN 441108 admeasuring 16100 sq.mts. area being develoPed by Pyramid Ventures India Private Limited. t Sir, I sanjay soni have undertaken assignment as Architect /Licensed surveyor of certifying Percentage of Completion of Conskuction Work of the 3 Building(s)/ 6 Towers(s) of the 1"r Phase of the Project, situated on the plot bearing Khasra. No. 39/2 of Division Nagpur village Gawasi Manapur taluka Nagpur (Rural) District Nagpur PIN 441108 admeasuring 16100 sq.mts. area being developed by [Promoters Name] 1. Following technical professionals are appointed by Owner / Promoter :- (i) M/s/Shri/Smt Sanjay Soni as L.S. / Architect ; (ii) M/s /Shri / Smt Avinash Bhatt as Structural Consultant (iii) M/s /Shri / Smt Ram Karu & Kishor Kobje as MEP Consultant (iv) M/s /Shri / Smt Nandu Yerunkar as Site Supervisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 392128800 (Total of Table A and B). The estimated Total,Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation c€rtificate / completion certificate for the building(s) from the NMRDA being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.392128800 (Total of TableAand B). The amount of Estimated Cost Incuned is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subjecl project to obtain Occupation Certificate / Completion Certificate from NMRDA (planning Authority) is estimated at Rs 0 ( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Proiect as completed on the date of this certificate is as given in Table A and B below : TABLE A Building Number 1,2 &3 (to be prepared separately for each Building ,Wing of the Real Estato Project) Sr. No. Particulara Amounts 'l Total Estimated cost of the building/wing as on Rs.280092000 28n12017 date ol Regishation is 2 Cost incurred as on 2810712017 Rs 280092000 (based on the Estimated cost ) 3 Work done in Percentage 100 o/o (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 00 (Based on Estimated Cost) 5 Cost lncurred on Additional /Extra ltems Rs. 00 as on 2810712017 not included in the Estimated Cost (Annexure A) TABLE B (to be prepared for ths ontire registered phase of the Real Estate Project) Sr Particulals Amounts No 1 Total Estimated -cost of the Internal and External Rs. 112036800 /- Development Works including amenities and Facilities in the fayout as on 28107120'17 dale ot Registration is 2 Cost incurred as on 2810712017 Rs. 112036800 /- (based on the Estimated cost ) 3 Work done in Percentage 1OO Yo (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred Rs. 0^ (Based on Estimated Cost) Cost Incuned on Additional /Extra ltems as on 2BlOTt2Oia Rs. 0/- not included in the Estimated Cost (Annexure A) Yours Faithfully /r'ry,",I* (Licence No......-......) * Note 1. The scope of work is to complete entire Real Estale project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent euantity surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). t 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development ofthe Realestate Project will result in amendment of the cost incured/to be incured. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost)