Ar. SANIAY SONI Architect, Interior Designer, Planner Shri Rishabh Appt, 10/304 Ganesh Nagar, Near S.D. HosPital Nagpur, Mobile - 7507544662 FORM 1 lsee Regulation 3l ARCHITECT'S CERTIFIGATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Dale ': 28107120'17 To The Pyramid Ventures India Private Limited, 101 Ganesh Snehal Apartment, south Ambazari Road, Shraddhanand Peth, Nagpur - 440022. Subject : Certificate of Percentage of Completion of Construction Work of 3 No. of Building(s)/ 6 Wing(s) of the 1't Phase of the Project [MahaRERA Registration Numbert situated on the Plot bearing Khasara No. 39/2 Division Nagpur village Gawasi Manapur taluka Nagpur (Rural) District Nagpur PIN tl4't108 admeasuring 16100 sq.mts. area being developed by Pyramid Ventures lndia Private Limited. Sir, I Sanjay Soni have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the 3 Building(s)/ 6 Towers(s) of the 1"t Phase of the Project, situated on the plot bearing Khasra. No. 39/2 of Division Nagpur village Gawasi Manapur taluka Nagpur (Rural) District Nagpur PIN 441108 admeasuring 16100 sq.mts. area being developed by lPromoter's Namel 1. Following technical professionals are appointed by Owner / Promoter :- (i) M/s/Shri/Smt Sanjay Soni as L.S. / Architect ; (ii) M/s /Shri / Smt Avinash Bhatt as Structural Consultant (iii) M/s /Shri / Smt Ram Karu & Kishor Kobje as MEP Consultant (iv) M/s /Shri / Smt Nandu Yerunkar as Site Supervisor Based on Site Inspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Tower of the Real Estate Project as registered vide number under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire ohase is detailed in Table B. Table A Building - 1, Tower- A. Sr Iasks /Activity Percentage of No work done 1 Excavation 100% 2 One number of Hjnth 100% 3 Zero number of Podiums 4 Stilt Floor 100% 5 Eight number of Slabs of Super Structure 100% 6 Internal walls, lnternal Plaster, Floorings within Flats/Premises, Doors 100% and Windows to each of the FlaVPremises 7 Sanitary Fittings within the FlaUPremises, Electrical Fittings within the 100% FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 't00% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of 100% terraces with waterproofing of the BuildingMing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as 't00% per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Building - 2, Tower- B. Sr. Tasks /Activity Percentage ot No work done ,| Excavalion 'l00o/o 2 One number of Plinth 't00% 3 Zero number of Podiums 0 4 Stilt Floor 100% 5 Eight number of Slabs of Super Structure 't00% 6 Internal walls, Internal Plaster, Floorings wlthin Flats/Premises, Doors 100% and Windows to each of the FlaUPremises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 100% FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of 100% terraces with waterproofing of the BuildingMing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as 100% per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requiremenrs as may be required to Obtain Occuoation /Completion Certificate Building - 3, Tower- C. Sr. Tasks /Activity Percentage of No work done I Excavation 100% 2 One number of Plinth 100% 3 Zero number of Podiums 0 4 Stilt Floor 5 Seven number of Slabs of SuDer Structure 1000/" o Inlernal walls, Intemal Plaster, Floorings within Flats/Premises, Doors 100o/o and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlauPremises, Electrical Fittings within the 1000/o FlaUPremises I Staircases, Lifts Wells and Lobbies at each Floor level connecting 100% Staircases and Lifts, Overhead and Underground Water Tanks o The external plumbing and external plaster, elevation, completion of 100% terraces with waterproofing of the BuildingMing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as 100% per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Buildingruing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate '/ Building - 3, Tower- D. Sr Tasks /Activity Percentage of No work done 1 Excavation 100% 2 One number of Plinth 1 00% 3 Zero number of Podiums 0 4 Stilt Floor 5 Seven number of Slabs of Super Structure 100% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors 100% and Windows to each of the FlauPremises 7 Sanitary Fittings within the FlavPremises, Electrical Fittings within the 't00% FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, comple,tion of 100% lerraces with waterproofing of the Building/l/Ving, 10 Installation of lifts, water pumps, Fire Fignting Fittingp and Equipment as 100% per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupition /Completion Certificate Building - 3, Tower- E Sr Tasks /Activity Percentage of No work done I Excavation 100% 2 One number of Plinth 1000/. 3 Zero number of Podiums 0 4 Stilt Floor 100% 5 Seven number of Slabs of Super Structure 100% 6 Internal walls, Internat Plaster, Ftooringl withinTtats/FEmGGlDooE 100% and Windows to each of the FlaVpremises 7 Sanitary Fittings within the rtavprb@ ,t000/. FlaUPremises 8 Staircases, Lifts Wells and Lobbiesffi 100% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and effi 100% terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water@ 100% per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to condilions of environment /CRZ NOC. Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate /".{i""4 cN:".c;-t:; \\no'o'-' .i l/ Building - 3, Tower- F Sr Tasks /Activity Percentage of No work done 'l Excavation 100% 2 One number of Plinth 100% 3 Zero number of Podiums 0 4 Stilt Floor 100% 5 Seven number of Slabs of SuDer Structure 100% o Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors 't00% and Windows to each of the FlavPremises 7 Sanitary Fittings within the FlavPremises, Electrical Fittings within the 100% FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of '100% terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment a! 100% per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate // TABLE-B Internal & External Development Works in Respect of the entire Registered phase S.No Common areas and Facilities, Proposed Percentage Details Amenities (Yes/No) of Work done Internal Roads & FoothDaths Yes 100o/o Water Supply Yes 100o/o Sewarage (chamber, lines, Septia Yes 1000/0 Tank , STP) 4. Storm Water Drains Yes '100o/o Landscaping & Tree Planting Yes 100yo o. Streel Lighting Yes 100yo 7. Community Buildings Yes 100yo 8. Treatment and disposal of sewage Yes 100o/o and sullage water 9. Solid Waste management & Dispost Yes 100o/o 10. Water conservation, Rain water Yes 100vo harvesting 11 Energy management Yes 100o/o 12. Fire protection anO fire safety Yes 100o/" requrrements 1., Electrical meter room, sub-Gtioil Yes 100% receiving slation Yours Faithfulty 6 * 16.; z's '.&z' N \G/ Name SANJAY SONI ii^(ffii,"ttit"):)