FORM-2 ENGINEER'S CERTIFICATE Dote: 3010912022 To, Mls. Emoor: Developers & Builders Pvl.Ltd. Subject: Certificote of percentoge of Compleiion of Construclion Work of Buildings AMARO building ( Residentiol Aportment/Commerciol), AMBER building( Residenliol Aporlment), ADEN villo buildings-ll2l3. MHADA (L.l.c/E.W.S) of "Modon Roton Ciiy" [RERA Regislrotion Numb{r P5O5OOOO1473| situoted on the C.S. no.39, Kh. No,2lll ,Mouzo:Chikholi, Toh. & Disi, Nogpur,demorcoted by its boundories (lotitude ond longiiude of.the end points) 21.lOO,79.llb ioh. & Dist. Nogpur PIN: 440024 qdmeosuring 17970.934sq.m.being developed by M/s. Emocir \o Developers & Builders Pvt.Ltd, Director: Mr.Modon.B.Rolon. Sir, We, M/s. AAJ Engineers & Consultonts Pvt,Lld hove undertoken ossignment for'certifyirrg Percentoge of Completion of Construction Work of "Modon Rolon City" [RERA Registrotion Number P505000014731 situoied on the C.S. no.39, Kh. No.2lll , Mouzo:Chikholi, Toh, & Dist. Nogpur.PfN 440O24 odmeosuring l797O.934sq.m.Areo being developed by M/s ''Emocrr Developers & Builders Pvt.Ltd, Director : Mr. Modon.B.Roton L Following technicol professionols ore oppoinied by Owner / Promoters: i. Ar. Adityo lndurkor os Architecl M/s, AAJ Engineers & Consultonts Pvt.Lld os Structurol Consultont t, Shri.Norendro Bobde os Plumbing Consultonl Shri.Devoshish Joshi os Electrlcol Consultont Mr. Muqsit Ahmed Abdul Goffor os Site Supervisor Ms.Kirti N.Kolhe os Engineer We hove eslimoted ihe cost of lhe complelion lo obtoin Occupoiiop Certificote/Cornpletion Cerlificote; of lhe Civil, MEP ond Allied works, of the Building(s) of the project. Our: estimoled cosi colculolions ore bosed on the Drowings/plons mode ovoiloble lo us for the project under reference by the Developer ond Consultonts ond the Schedule of items ond quontity for the entire work os colculoted by Mr. Muqsit Ahmed Abdul Goffor qs Ouoniity Surveyor* oppointed by Developer/Engineer, ond the ossumption of the cost df m'oteriql, lobour ond other inputs mode by developer, ond the site inspeciion corried out b! US 3 We estimote lotol Estimoted Cost of completion of the building(s) of the oforesoid project under reference os Rs.59,53,17,935/- (Totol of Toble A qnd B). The estimoted lotol Cosi of project is with reference to the Civil, MEP ond ollied works required io be completed for the purpose of obioining occupolion certificote /completion certificote for the building(s) from the Nogpur Municipol Corporolion being the Plonning Authority under whose jurisdiction the oforesoid project is being implemented. The Estimoted Cost lncurred till dotd is colculoted ot Rs, 43,11,66,418/- (Totol of Toble R ond B) Ihe omount of Estimoted Cost Incurred is colculoted on the bose of omouni of Totol Fstimaled Cost. 5 The Bolonce cost of Completion of the Civil, MEP ond Allied works of the Buildingls) of the subjecl projecl to obtoin Occupotion Certificote / Completion Certificole from Nogpur Municipol Corporotion (plonning Authority) is estimoted of Rs.16,41,51,517/- ( Totol of Toble A ond B). I certify t[rot the Cpst of the Civil, MEP