r R.D. ARCHITECTCTS & CONSULT ANT' S Near Ground , Laxm1 Nagat, Nagpur. Cell No :- 9422110416 UC No. CA /2000 / 26055 FORM 1 [See Regulation 3) ARCHITECT'SCERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) For Quarter ending 31 st March 2019 Date09thApril, 2019 To, Raghuveer Constructions, B-306, Pritam Complex, Old Bhandara Road, Bagadganj, Nagpur 440008 Subject :Certificate of Percentage of Completion of ConstructionWork of'Shivarpan" project [Maha RERA No. P50500001454 for the Construction of one Residential Building/ Nil Wings named Shivarpanofthe Mis Raghuveer Constructions situated on the Plot no. 2, Dubey layout, Jaitala Road,Nagpur 440008, demarcated by its boundaries as below, Taluka & Diskict : Nagpur, Maharashtra, Pin 440008, admeasuring 459.73 Sqmtr. area being developed by Mis Raghuveer Constructions. On the East :Plot No 1 & 6 On the West :Road & Plot no 3 On the North :Road & Plot no 1 On the South : Plot No 6 & 7 Sir, V WeRahul Deshpande have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the One Building of the Project "Shivarpan" , situated on the plot bearing Plot no. 2, Dubey layout, Jaitala Road,Nagpur 440008demarcated by its boundaries as below, Taluka & District : Nagpur, Maharashtra, Pin 440008admeasuring 459.73 Sqmtr . Area being developed by Mis Raghuveer Constructions On the East :Plot No I & 6 On the West :Road & Plot no 3 On the North :Road & Plot no I On the South: Plot No 6 & 7 1. Following technical professionals are appointed by Ow11er / Promoter :....:__ (i) Shri Rahul Deshpande as Architect (ii) Shri P. Y. Ghushe as Structural Consultant Gii) Shri Sanjay Gupta as a Site Supervisor I I( 2 Based on Site lnspectio!1, wit~1 respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date ofth1s certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide PS0S0000 I 45411mnber under !vfahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table 8 TABLE-A Building /Wing Number 0 I (to be prepared separately for each Building /Wing of the Project) Task/ Activity (2) Percentage of Sr. No. work done (3) (1) ]. Excavation 100% 0 number ofBasement(s) and 1 Plinth 100% 2. ,, 0 number of Podiums - .) . 100% 4. Stilt Floor Sn umber of Slabs of Super Structure 100% 5. Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors 100% 6. and Window·s to each of the Flat/Premises. Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 100% 7. Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level connecting 100% 8. Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, elevation, completion of 100% 9 terraces with waterproofing of the Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment 100% 10 as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas Wall and all other appurtenant to Building/ Wing, Compound requirements as may be required to obtain Occupation / Completion Certificate. 3 TABLE-B Internal and external Development Works in respect of the entire Registered Phase. Percentage of Details SI. Common areas and Facilities, Proposed Amenities (Yes/No) Workdone (5) No. (3) (4) (1) (2) 1. Internal Roads&Foot-paths. No - Yes 100% 2. WaterSunnlv Yes 100% 3. Sewerage (chamber, lines, Septic Tank , STP) No - 4. Storm WaterDrains No - s. Landscaoing& Tree Planting. No - 6. Street Lighting No - 7. Communitv Buildings No - 8. Treatment and disposal of sewage and sullage water No - Solid Waste management & 9. Disposal. Yes 100% 10 Water conservation, Rain water harvesting. No - 11 Energy management and fire safety No - 12 Fire protection requirements Yes 100% 13 Electrical meter room, sub-station, receiving station. Yes 100% 14 Open Parking YoU