FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 01/04/2024 To, Firoz S/o Faruk Husain And Keshavbhai S/o Jadavbhai Paghadal Plot No 169/1, Ward No 14, Tilak Chowk, Wardha -442001(MH) Subject: Certificate of Percentage of Completion of Construction Work of ROYAL ESTATE having MahaRERA Registration no. P50400055157 being developed by Firoz S/o Faruk Husain And Keshavbhai S/o Jadavbhai Paghadal, Wardha. Sir, I/ We Architect Sarang Agrawal have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of ROYAL ESTATE, having MahaRERA Registration no. P50400055157 being developed by Firoz S/o Faruk Husain And Keshavbhai S/o Jadavbhai Paghadal, Wardha. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A ROYAL ESTATE Sr. Tasks /Activity Percentage No of work done 1 Excavation NA 2 Basements (if any) NA 3 Podiums (if any) NA 4 Plinth NA 5 Stilt Floor NA 6 Slabs of Super Structure NA 7 Internal walls, Internal Plaster, Floorings, Doors and NA Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises NA 9 Staircases, Lifts Wells and Lobbies at each Floor level, NA Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propos Percentage Details Facilities, Amenities ed of (Yes/N Actual Work o) done (As on date of the certificate) 1 Internal Roads & Footpaths Yes 90% AS PER SANCTIONED LAYOUT PLAN 2. Water Supply Yes 85% AS PER SANCTIONED LAYOUT PLAN 3. Sewerage (chamber, lines, Yes 92% AS PER Septic Tank , STP) SANCTIONED LAYOUT PLAN 4. Storm Water Drains Yes 88% AS PER SANCTIONED LAYOUT PLAN 5. Landscaping & Tree Planting Yes 70% AS PER SANCTIONED LAYOUT PLAN 6. Street Lighting Yes 85% AS PER SANCTIONED LAYOUT PLAN 7. Community Buildings No 0 NA 8. Treatment and disposal of No 0 NA sewage and sullage water 9. Solid Waste management & Yes 87% AS PER Disposal SANCTIONED LAYOUT PLAN 10. Water conservation/ Rain No 0 NA water harvesting 11. Energy management No 0 NA 12. Fire protection and fire safety No 0 NA Requirement 13. Electrical meter room, sub- Yes 90% AS PER station, receiving station SANCTIONED PLAN 14. Aggregate area of recreational Yes 85% AS PER Open Space SANCTIONED PLAN Yours Faithfully Architect Sarang Agrawal Name of Architect & Signature Agreed and Accepted by: Signature of Promoter Shri Firoz S/o Faruk Husain Promoter and Authorised Signatory Date:- 01/04/2024