SWAPNASHILP ARCHITECTS & INTERIOR DESIGNERS Swapnil S. Khedikar Office : B.Arch. Swapnashilp, Architects & Interior Designers. 34, Kotwal Nagar., CA / 2003 / 32295 Nagpur. Email.- swapnilkhedikar@gmail.com Mo. No. 9422830795  Building & Layout Plans  Demarcation & Mark Layout  Architectural Consultancy   Estimates  Valuations  Construction  Supervision  Interior Designing  Date: 31/03/2024 ARCHITECT'S CERTIFICATE To, 1) MR. NITIN DILIPRAO GAWANDE, DIST-WARDHA 442001., 2) MRS. RUTUJA AMAR GHARFALKAR, DIST-WARDHA 442001 3) MR. YOGESH CHANDULALJI JAISWAL DIST-WARDHA 442001 Subject : Certificate of Percentage of Completion of Work of the “ Development of Plots” Project [Maha RERA Registration Number] situated on the land bearing Survey No. 373/2/1, Mauza – Nachangaon , demarcated by its boundaries ( latitude and longitude of the end points) Survey No. 373/1 to the NORTH, Survey No. 374 to the SOUTH, Survey No. 378 to the EAST, Survey No. 373/2/2 to the WEST of Division - Nachangaon, Village – Nachangaon , Taluka - Deoli, District - WARDHA, PIN - 442001, admeasuring 1.46 HR area being developed by, 1) MR. NITIN DILIPRAO GAWANDE, DIST-WARDHA 442001., 2) MRS. RUTUJA AMAR GHARFALKAR, DIST-WARDHA 442001 3) MR. YOGESH CHANDULALJI JAISWAL DIST-WARDHA 442001 Sir, I_Mr. Swapnil S. Khedikar have undertaken assignment as Architect of certifying Percentage of Completion of Work of the “Development of Plots” Project [Maha RERA Registration Number] situated on the land bearing Survey No. 373/2/1, Mauza – Nachangaon demarcated by its boundaries ( latitude and longitude of the end points) Survey No. 373/1 to the NORTH, Survey No. 374 to the SOUTH, Survey No. 378 to the EAST, Survey No. 373/2/2 to the WEST of Division - Nachangaon, Village – Nachangaon , Taluka - Deoli, District - WARDHA, PIN - 442001, admeasuring 1.46 HR area being developed by, 1) MR. NITIN DILIPRAO GAWANDE, DIST-WARDHA 442001., 2) MRS. RUTUJA AMAR GHARFALKAR, DIST-WARDHA 442001 3) MR. YOGESH CHANDULALJI JAISWAL DIST-WARDHA 442001 1. Following technical professionals are appointed by Owner / Promoter:- (i) Shri. Swapnil Khedikar as Architect; (ii) Shri. ………Nil......as Structural Consultant; (iii) Shri. Swapnil Khedikar as MEP Consultant; (iv) Shri Nitin Gawande as Site Supervisor; Based on Site Inspection, with respect of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done of the Real Estate Project as registered vide number ___ under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building /Wing Number __ (to be prepared separately for each Building /Wing of the Project) Sr.No. Task & Activity Percentage Of work done 1 Excavation 0% 2 One (1) number of Basement(s) and N.A. Plinth 3 _____________number of Podiums N.A. 4 One (1) number of Stilt Floor N.A. 5 Five (5) number of Slabs of Super Structure N.A. 6 Internal walls, Internal Plaster, N.A. Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each N.A. Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, N.A. elevation, completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire 0% Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Percentage Common Areas, Facilities Proposed S.No. Of Work Details and Amenities (Yes/No) Done 1 Internal Road & Fothpath YES 60% 0% 2 Water Supply NO 0% 0% Sewage (chamber, line, 3 YES 50% 0% Septic Tank, STP) 4 Storm Water Drains YES 0% 0% Landscaping & Tree 5 YES 40% 0% Planting 6 Street Light YES 0% 0% 7 Community Buildings NO NA 0% Treatment and disposal of 8 NO NA 0% sewage and Sullege water Soild Waste management & 9 NO NA 0% Disposal Water Conservation, Rain 10 YES 0% 0% Water harvesting 11 Energy Management NO NA NA Fire protection and fire 12 NO NA NA safety requirement Electrical Meter room, sub- 13 YES 0% Electric Meter Room station, receiving station Other ( Option to Add 14 NO NA NA more)