NITIN M.ZADE LICENCED ENGINEER t.s. No. Ntr.2445 NMC 573 ilO.21, XUBER REGENCY NEAR ALL INDIA REPORTER PRESS CONGRESS NAGAR., NAGPUR. Pr{. ilo.9tp2947995 Annexure C FORM - 2A (See MahaRERA Order No. 5 of 2O18) ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE ( Site Supervisor's Certifi cate) (To be submitted at the end of Financial Year) Date: 21-03-2023 To, Mahesh Shankarrao Gulhane Other-2 Chirag complex Anmol Nagar Nagpur Road, Wardha M20OL QUALITY ASSURANCE CERTIFICATE (Certifrcate No -1 for the Year Ending 21-O3-2O23) Subject: Certificate for quality materials used and quality of Construction & workmanship for the work of "Vrundavan park" having MahaRERA registration Number P50400048062 being developed by Radha Builders & Developers partner Mahesh Shankarrao Gulhane Other-2. Sir, I Nitin M. Zade have undertaken an assignment of supervision of this Real Estate project. OUR RESPONSIBITITY I / We are responsible for carrying out the work in accordance with that with development permission and as per the approved plan and submit certificate of supervision of work and to carry out material' testing in-situ or in authorised laboratory and to ensure quality of work & workmanship as per prescribed specifications, & as per NBC and/or other relevant code of practice. t1I INPUT MATERTALS, FTXTURES & FtTTtNGS I / We hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electrical, Sanitary Fittings, etc and amenities to be provided by the Promoter in the said project, building and the Apartment as are as per specifications mentioned in Annexure 'E', of Agreement to Sale. For those items, where no specification have been mentioned in Agreement of Sale, the Materials, Fixtures and Fittings used conform to the relevant BIS Standard / lS / National Building Codes or as per lndustry Standards. t2l WORKMANSHTP I / We hereby certif,/ that the work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviation as per relevant code of practice. t3l STRUCTURAT ENGTNEER Promoters have engaged structural engineer Mr I _ having License No having Office No CellNo The structural design of buildings in this Project has been Oon.'rnA", his supervision. The formwork and concrete mix design has been done as per lS 10252:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABIIITY and SAFETY have been kept on record. tsl PRESERVATTON OF RECORDS Record of all test results of this Project have been properly kept in the prescribed format and will be preserved at least up to the Defect Liability Period or for the period as required by any other provision of Law. Please specify deviation in quality of materials or any other item of work which were not conforming to ' the specifications as mentioned in Agreement of Sale. Yours faithfully, \)t I;::llITillr'n.".'(sitesuperv,,"t"r.{l$,i,;fi}r1,"" Name: Nitin M. Zade It{ License No (if any): ilI7 Lic [;.;i;;; Mobile No: Place: Agreed & Accepted by: /-/-9'U222/ of Signature Promoter Name: Mahesh Gulhane Partner Date: 28-05-2023