NITIN M.ZADE LICENCED ENGINEER L.S. NO. NIT.244S NMC573 NO. 21, KUBER REGENCY NEAR ALL INDIA REPORTER PRESS CONGRESS NAGAR., NAGPUR. PH. NO.9822947996 Annexure- B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date:21-03-2023 To, Mahesh Shankarrao Gulhane & Other-2 Chirag complex Anmol Nagar Nagpur Road, Wardha 442001 Subject:Certificate of Cost Incurred for Development of "Vrundavan park" having MahaRERA Registration Number PS0400048062 being Developed by Radha Builders & Developers partner Mahesh Shankarrao Gulhane Other-2. Sir, • 1. I Nitin M. Zade have undertaken assignment of Certifying Estimated Cost for "Vrundavan park" having MahaRERA Registration Number PS0400048062 being Developed by Radha Builders & Developers partner Mahesh Shankarrao Gulhane Other-2. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers'/· Consultants. The Schedule of Items & Quantity required for the entire work as calculated by Nitin M. Zade Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us' We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 40,00,000/- (Total of Table A & B) at the time of Registration' The estimated Total Cost of project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the SDO Wardha being the planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The Estimated Cost incurred till date is calculates to Rs.22,98,990/- (Total of Table A & B). The Amount of ES-tim.?.te.d.e-o.s.t l.n.curr.e.d.t.s..-c.e!-c.q.le.t-e..d..9.n .th.e-.bes.i9.qf.in-p.U.t.maleria!s-l-Ser-v!p-e-s-ss-e-d-& .u n i !..c e s.t .e.f .t h e. s.e. i t.e m s.. 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 17,01,010/- (Total of Table A & B). I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE. A g4+ilding+lgigg/ Layout / Plotted Development bearing Number 82 or called Vrundavan Park(to be prepared separately of each gr+i+eingJ-$Iiftg I Layout I Plotted Development of the Real Estate Project) S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Building / Wing I Layour I 40,oo,o0o/- Plotted Development as on date of Regl$E!lg!-!9 2. Cost incurred as on date of Certificate 22,98,9901- 3. Work Done in Percentage (as Percentage of Estimated 57.41% Cost) 4. Balance Cost to be incurred ** ((based on Estimated tT,ot,oLol- Cost) 5. Cost incurred on Additional/ Extra ltems not included in the Estimated Cost (Table-C) T TABLE - B Internal & External Development Works in respect of Registered Phase S. No. Particulars Amount (in Rs.) NA 1. Total Estimated Cost of lnternal & External Development Works including amenities & facilities in the Layoutason date of@ NA 2. Cost incurred as on date of Certificate NA 3. Work Oone in Percentage (as Percentage of Estimated Cost) 4. galance Cost to be incurred ** ((based on Estimated NA Cost) NA 5. Cost i*rrrt"d on Additional/ Extra ltems not included in the Estimated Cost (Table-C) \N Yours faithfullY, r{itinv.;]r" Consulting Civil Enginee Signature Ntc Lic x..573 Nitin M. Zade illT' Lic Brr' olr':'t'D t{o.:2rtrtf '!' License Number ( ) Agreed & AccePted bY: /4- ?'fuzrr Slgn atu re of Promote rfloi nt laiiloEfler Name: Mahesh Gulhane Partner in Radha Builders & Developers Date :21-03-2023 Note: The scope of work is to complete Registerea n"j Estate Project as per drawings approved 1. from time to time as per specifications mentioned in the Agreement to Sale' 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent can be relied up on by Engineer' Quantity Surveyor, who's Certificate of Quantity Calculated, name has to be ln case of independent quantity surveyor being appointed by Developer, the by offiqe of mentioned at the place marked (*) & in case quantity are being calculated Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*)' T 3. (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE. C List of Extra / Additional / Deleted Items considered in the cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted ltems Amount (in Rs.) 1. 2.