FORM-2 ENGINEER'S CERTIECATE (To be submitted for withdrawal of Money from Deslanated Account- Project wise-June 2023) Date: 16.07.2023 To Chhoriya Developers and construction Company, Shopping Center, Adinath Society, Pune Satara unnoriya Realty, Office No 401, 4th Floor Adinath Road, Opp Hotel Panchami, Pune 411037. future Infrastructural Development Work of Chhoriya Subject: Certificate of Cost lncurred for being Deoli Wardha Plotting having MahaRERA Registration Number: P50400031119 city - Company. developed by Chhoriya Developers and construction Sir, Cost for S. Wadgaonkar have undertaken assignment of certifying Estimated 1. | Avinash Number: - Deoli Wardha Plotting having MahaRERA Registration Chhoriya future city Developers and construction Company. P50400031119 being developed by Chhoriya completion of the required for of Civil, MEP, and allied works 2. We have estimated the cost calculations are of the project. Our estimated cost Development works, Proposed In said Layout reference by the the Drawings /plans made available to us for the project under based on entire work as schedule of items and quantity for the developer and consultants and the Surveyor* appointed by Developer/ Engineer, calculated by Mr.Dinesh Y. Moundekar Quantity developer, and the material, labour and other inputs made by and the assumption of the cost of ascertain/confirm the above analysis given to us. site inspection carried out by us to aforesaid of completion of the Infrastructural work in the 3. We estimate Total Estimated Cost registration. The under reference as Rs 3,18,24,411 (Total of Table B) at the time of project the Civil, MEP and allied works required for estimated Total Cost of project is with reference to purpose of mentioned in agreement of sale and for the completion of project as per specifications Development from the Buldana Town Planning obtaining completion certificate for the plotted the Planning Authority under whose jurisdiction And Nagar parishad Shegaon being the aforesaid project is being implemented. Table B). The date is calculated at Rs. 82,74,347 (Total of 4. The Estimated Cost Incurred till materials/Services used calculated on the basis of input amount of Estimated Cost Incurred is and unit cost of these items. of the Civil, MEP, and Allied workS in the layout, as per 5. The Balance cost of Completion project is estimated at Rs 2,35,50,064 Specifications mentioned in agreement of sale, of the (Total of Table B). and allied work for in the layout, as per 6. Icertify that the Cost of the Civil, & development as completed on the Specifications mentioned in agreement of sale, of the aforesaid Project date of this certificate is as given in Table B below : FORM-2 (TABLE B) Chhorlya Future Clty - (to be prepared for the entire reglstered phase of the Real Estate Deoll Wardha Project) Plotting Amount Sr. Particular No Total Estimated cost of the Internal and External Development 31824411 layout. Date of RS 1 |Works including amenities and facilities in the |Registration is 05.10.2021 8274347 Cost incurred as on 30.06.2023 RS. 2 (based on the Estimated cost ) 26% 3 Work done in percentage (As ercentage of the estimated cost) 23550064 Rs. Balance Cost to be Incurred 4 (Based on Estimated Cost) 0 30.06.2023 Additional/ Extra Items Rs. Cost Incurred on (AnnexureA) 5 as on not included in the Estimated Cost Yours Faithfuly Reg.No. A-17039 AvinashsWadtaenkar Agreed and Acccpted by, Signature of Pronmoter Chhoriya Name: Anmol K. approved * Note entire Real Estate Project as per drawings to complete Certificate/Completion Certificate. The scope of work is 1 to obtain Occupation by an independent from time to time so as done by office of Engineer or can be done upon by the be (*)Quantity survey can certificate of quantity calculated can be relied 2 Developer, the Quantity Surveyor, whoseependent quantity surveyor being appointed by being are Engineer. In case of find (*)and in case quantity Engineer, has to be mentioned at the place marked in the office of who is name the name of the person marked(*). of Engineer, place calculated by office calculated should be mentioned at the required to responsible for the quantity labour, material, equipment and machinery includes all The estimated cost for development of the 3 work. carry out entire deviation in quantity required estimated cost, any incurred/to be incurred. 4 As this is an result in amendment of the cost Real estate Project will are indicative and no texhaustive. components of work with specifications 5 All