FORM-2 ENGINEER'S CERTIEIGATE (To be submitted for wlthdrawal of Money from Deslgnated Account- Project wise-Sep-2022) Date: 16.10.2022 To Chhorlya Developers and construction Company, Chhorilya Realty, Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Cost Incurred for Infrastructural Development Work of Chhorlya future city Deoli Wardha Plotting having MahaRERA Registration Number: P50400031119 being developed by Chhoriya Developers and construction Company. Sir, 1. I Manish V. Pande have undertaken assignment of certifying Estimated Cost for Chhoriya future city Deoli Wardha Plotting having MahaRERA Registration Number: P50400031119 being developed by Chhoriya Developers and construction Company. 2. We have estimated the cost of Civil, MEP, and allied works required for completion of the Development works, Proposed In said Layout of the project. Our estimated cost calculations are based on the Drawings /plans made available to us for the project under reference by the developer and consultants and the schedule of items and quantity for the entire work as calculated by Mr.Dinesh Y. MoundekarQuanty Surveyor" appointed by Developer! Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the Infrastructural work in the aforesaid project under reference as Rs3.18,24411 (Total of Table B) at the time of registration . The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of project as per specifications mentioned in agreement of sale and for the purpose of obtaining completion certificate for the plotted Development from the Buldana Town Planning And Nagar parishad Shegaon being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 82.74,347 (Total of Table B). The amount of Estimated Cost Incurred is calculated on the basis of input materials/Services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP, and Alied works in the layout, as per Specifications mentioned in agreement of sale, of the project is estimated at Rs 2.35.50.064 (Total of Table B). 6. I certify that the Cost of the Clvil, & development and alliled work for in the layout, as per Specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given In Table B below iMPower Projects Project Management Consultant FORM-2 (TABLE B) Chhorlya Future Clty (to be prepared for the entire registered phase of the Real Estate Deoll Wardha Project) Plotting Sr. Particular Amount No Total Estimated cost of the Internal and External Development Works including amenities and faciltles in the layout. Date of Rs 31824411 Registration is 05.10.2021 Cost incurred as on 30.09.2022 Rs 8274347 (based on the Estimated cost) Work done in percentage 26% (As ercentage of the estimated cost) Balance Cost to be Incurred 23550064 Rs (Based on Estimated Cost) Cost Incurred on 30.09.2022 Additlonal/ Extra Items Rs 0 as on not included in the Estimated Cost (AnnexureA) Yours Faithfully wom iMPower Projccts Project Managcment Consultant Manish V. Pande (IMPower Projects) Agreed and Acccpted by, Signature of Promoter Name: Anmol K. Chhoriya Note 1 The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtaln Occupation Certiflicate/Completion Certificate. 2 (*)Quantity survey can be done by office of Englneer or can be done an by Quantity Surveyor, whose certificate of quantlty calculated can be relled upon independent by the Engineer. In case of find ependent quantity surveyor being name has to be mentloned at the appolnted by Developer, the place marked (*)and In case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responslble for the quantity calculated should be mentloned at the 3 The estimated cost includes all place marked (*). labour, materlal, equipment and machinery carry out entire work. required to 4 As this Is an estimated cost, any devlatlon In quantlty Real estate Project will result In amendment of the cost requlred for development of the 5 All components of work with incurred/to be incurred. speclfications are Indicatlve and no texhaustlve.