FORM 1 ARCHITECT'S CERTIFICATE withdrawal of at the time of Quarterly Update Registered Project and for (To be submitted Dec 2022 Money from Designated Account) Date: 12.02.2023 To, Chhoriya Developers and construction Company, Satara Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Chhoriya Realty, Road, Opp Hotel Panchami, Pune 411037. Work Certificate of Percentage of Completion of Infrastructural Development Subject: Registration Chhoriya future city - Deoli Wardha Plotting having MahaRERA of construction by Chhoriya Developers and Number: P50400031119 being developed Company. Sir, certify in as Architect / Licensed Surveyor of Mr.Kunal Patil have undertaken assignment Development Work Chhoriya future city - Deoli Percentage of Completion of infrastructural developed Registration Number: P50400031119 being Wardha Plotting having MahaRERA construction Company. by Chhoriya Developers and in aforesaid the Infrastructural Development Work Based on Site Inspection, with respect to Work date of this certificate, the Percentage of Real Estate Project, Icertify that as on the Project under in the layout of the Real Estate done for Infrastructural development work with respect to each of the activity of MahaRERA &the Percentage of the work executed the entire phase is detailed in Table B. UNAL P ARCH From 1Table - B Internal &External Development Works Respect of theentire Registered Phase 1 Project:- Chhoriya Future City Deoli Wardha Plotting. Proposed Percentage of Details S. Common areas and Facilities, Amenities Work done No (Yes/No) Yes 50 NoFootpath 1 Internal Roads &Foot paths Yes 0 water pipe line 2 Water Supply Yes 0 No STP STP) 3 Sewerage (chamber, lines, Septic Tank, No 0 NA 4 Storm Water Drains Tree Plantation along road 5 Land scaping &Tree Planting Yes and open space Boundary 0 NA 6 Street Lighting No 0 NA 7 Community Buildings No 0 NA 8 Treatment and disposal of sewage and sullage water No NA 9 Solid Waste management &Disposal No NA 10 Water conservation ,Rain water harvesting No NA 11 Energy management No 0 NA 12 Fire protection and fire safety requirements 13 Electrical meter room, sub- station, receiving station Yes 0 Layout Electrification 14 |Aggregate area of recreational open space Yes 0 with Children Equipment's No 0 NA 15 Open Parking Yes 40 Layout Entrance Gate 16 Entrance Gate Yours Faithfully, KUNA. PA Kunal Patil Consulting ArchitectyNG AR Agreed and Accepted by, Signature of Promoter Name:Anmol K. Chhoriya