'I Ult: \ Building- "AAI IU,Sll>EN('Y II" I I - r No Tasks / Activity Percentage of Actual work done (1) (2) (As on date of the certificate) (3) �I· ·c,1Yat1011 1 100 l.tscmcm (II any) NA �>u�mms (1f any) NA 1 1111th 100 Sttll Floor NA Slabs of Suoer Structure JOO Internal walls, Internal Plaster, Floorings within 50 � � Flats/ Premises 8 Sanitary Fittings within Flat/Premises 10 9 Staircases, Lifts Wells and Lobbies at each Floor 50 level Overhead and underground Water Tanks 10 External plumbing and external plaster, elevation, 80 completion of te1Taces with waterproofing of the Building/ Wing, II Installation of lifts, water pumps, Fire Fighting 0 Fittings and Equipment as per CFO NOC, Electrical fittings mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, done paving of areas appwtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications m agreement of Sale. Any other activities. TABLE-B Common Areas (Internal & External Development) Works in Respect of the entire Registered Phase. Sr Common areas and Proposed Percentage of Work done Details No. Facilities (Yes/No) (As on date of the (5) (1� , (2) (3) Certificate) (4) Internal Roads &Footpaths No NA NA 2 Water Supply Yes 0 AMC 3 Sewerage (chamber, lines, Yes 100 Completed Septic Tank, STP)