AMIT MEHARE (CIVIL ENGINER) GOPAL NAGAR PAWAN NAGAR CO 7030608|80 AMRAVATI :-444607 M- P.No E-mail :- amitmehare@gmail.com FORM-2 [see Regulation 3] ENGINEER'S CERTIFIOCATE for submitted at the time of Registration of Ongoing Project and (To be Account- Project wise) with drawal of Money from Designated Date : 10/07/2024 To, The Vasavi Lifespace Pvt Ltd, Amravati -444601. Subject: Certificate of Cost Incurred for Development of MIDAS Enclave having MahaRERA Registration Number P50300076783 being developed by Vasavi Lifespace Pvt Ltd (As on 30/06/2024) Sir, I/ we Ámit Mehare have undertaken assignment of certifying Estimated Cost for MIDAS Enclave having MahaRERA Registration Number P50300076783 being developed by Vasavi Lifespace Pvt Ltd. 2. We have estimated the cost of Civil, MEP and Allied works reguired for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculationsare based on the Drawings/ plans made available to us for the project under reference by the Developer /Consultants. The Schedule of times and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/ Engineer, the assumption of the cost of material, labor and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 4,09,40,000/- (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP, andallied works required completion of the apartments and proportionate completion of internal &% external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the building(s)/Wings)/ Layout/Plotted Development from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.14,22,160/-. The amount of Estimated Cost Incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The works for Balance cost of Completion of the Civil, MEP and Alliedinternal &% completion of the apartments and proportionate completion ofof sale, of the external works, as per specifications in agreement Project is estimated at Rs mentioned 3,95,17,840/ the apartments 6. I certify that the Cost of the work for Civil, MEP and allied mentioned in and proportionate internal & external works, as per specifications date of this agreement of sale, of the aforesaid Project as completed on the certificate is as given in Table A and B Below TABLE- A Building called MIDAS Enclave Sr. No. Particulars Amounts Total Estimated cost of the building as on date of Registration is Rs 4,09,40,000/ Cost incurred as on date of certificate Rs 14,22,160/ 3 Work done in Percentage (as Percentage of the estimated cost) 3.47% 4 Balance Cost to be Incurred** (Based on Estimated Cost) Rs 3,95,17,840/ 5 Cost Incurred on Additional /Extra Items not included in the Estimated Cost (Table-C) Rs TABLE- B Registered Internal &External Respect of the Development Works Phase in Amounts Sr. No. Particulars 1 Total Estimated cost of the Internal and External Development Works including Rs amenities and Facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs 3 Work done in Percentage % (as Percentage of the estimated cost) Balance Cost to be Incurred (Based on Estimated Cost) Rs 5 Cost Incurred on Additional/ Extra Items not included in the Estimated Cost (Table-C) Rs Yours Faithfully AMIT MEHARE B.E. Civil Engineer Clo.Gopal Nagar,Pavan Naga1 Amravati Reg.No. M/L-19216 7030608180 Signature of Engineer (Licence No............ ....) Local Authority License no. Agreed and accepted by: Signature of Promoter ES PR Name: Date: Note: 1).The scope of work is to complete Registered Real Estate Project as P drawings approved from time to time andas ner snecifications in agreement of sale. mentionea 2)-(") Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent Quantity Surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3).(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 4).All components of work with specifications are indicative and not exhaustive. 5).Please specify if there are any deviations/qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional /Deleted Items considered in cost (Which were not part of the original Estimate of Total Cost) Sr.No. List of Extra/Additional/ Deleted Items Amount (In Rs) 2