JCIVIL CONVERGE SOLUTIONS Transpiring Values Enriching life ENGINEER'S CERTIFICATE Date: 23.10.2024 To, The Nitin Builders, Amravati. Subject: Certificate of Cost Incured for Development of My Orchid Heights Phase-I having MahaRERA Registration Number P50300056450 being developed by Nitin Builders. Sir, 1 We Civil Converge Solutions have undertaken assignment of certifying Estimated Cost for My Orehid Heights Phase-I having MahaRERA Registration Number P50300056450 being developed by Nitin Builders. 2. We have estimated the cost of the Civil, MEP and Allied works required for Completion of the apartments and proportionate completion of internal &external works of the project as per specifications mentioned in agreement of sale. Our estimated COSt calculations are based on the Drawings/plans made available to us for the project under reference by the Developer / Consultants and the Schedule of items and quantity for the entire work as calculated by CivilConverge Solutions Quantity Surveyor appointed by Developer / Engineer, and the assumption of the cost of the cost material, labor and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3 We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs. (Total of Table A and B). at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of apartments and proportionate completion of internal &external works, as per specifications mentioned in agreement to sale and for the purpose of obtaining occupation certificate / completion certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. Cerilio Sructural Engincer RNo DO1CA/D'2022/APL00339 4 The Estimated Cost Incurred till date is calculated at Rs. (Total of Table A and B).The amount of EstimatedCost Incurred is calculated on the basis of inputmaterials /services used & unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartment and proportionate completion of internal & external works, as per specifications mentioned in agreement to sale of the Project is estimated at Rs. (Total of Table A and B) 6. We Certify that cost for the Civil /MEP /Allied Work for the apartment and mentioned in proportionate completion of internal & external works, as per specifications this certificate is as agreement to sale, of the aforesaid Project as completed on the date of given in Table A and B below. Table A called My Building No.1/Wing / Layout / Plotted Development bearing Number or Orchid Heights Phase-I Development of (To be prepared separately for each building / wing / Layout / Plotted the Real Estate Project) Particulars Amount (In Rs.) Sr. No. 1 Total Estimated Cost of Building / Wing / Layout / Plotted Development As On Date Of Registration is Cost Incurred As On Date of 2 Certificate 3 Work Done In Percentage (As Percentage Of Estimated Cost) 4. Balance Cost To Be Incurred (Based on Estimated Cost)** 5. Cost Incurred In Additional /Extra Item not included in the Estimated Cost (Table -C) ANIERR SILAH Cer fir Structural Enginacr iRNo.DCi1CA 20221APL/000 Table B Internal & External Development Works in Respect of the Registered nase Sr. Particulars Amounts No. 1 Total Estimated Cost of the Internal and external Development Works including amenities and facilities in the layout as on date of Registration is 2 Cost Incurred As On Date of certificate 3 Work Done In Percentage (As Percentage Of Estimated Cost) 4 Balance Cost To Be Incurred (Based on Estimated Cost) Cost Incurred In Additional / Extra Item not included in the Estimated Cost (Table -C) Yours Faithfully, Signature of Engineer RSHAH ctural Engineer o.LeiCh2022/APL/00339 Note: Estate Project as per 1. The scope of work isto complete Registered Real specifications mentioned in drawings approved from time to time and as per agreement of sale. Engineer or can be done by 2. (*)Quantity survey can be done by office of quantity calculated can be an independent Quantity Surveyor, whose certificate of surveyor being relied upon by the Engineer. In case of independent quantity () and place marked appointed by Developer, the name has to be mentionedat the of the person in case quantity are being calculated by office of Engineer, the name shouldbe calculated in the office of Engineer, who is responsible for the quantity mentioned at the place marked (*) 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4. All the components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in agreement of sale. Table C Cost List of Extra / Additional / Deleted Items considered in (Which were not part of the original estimate of Total Cost) List of Extra/ Amount (In Rs.) Sr. No. Additional/ Deleted Items ructural Engicer CO'CAN2022/APLU00339