"DESIGN PLUS" group AN ARCHITECTURAL CONSULTENCY SERVICE 02,Ritesh plaza, Swastika Nagar, Nawate Square, Badnera Road , Amravati 444605 ARCHITECT'S CERTIFICATE Date: 23.10.2024 To. NITIN BUILDERS AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of MY ORCHID HEIGHTS PHASEI having MahaRERA Registration Number P50300056450 (Only Applicable after project registration) being developed by NITIN BUILDERS. Sir. IAr. RAHUL FARKADE have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of MY ORCHID HEIGHTS PHASE-I having MahaRERA Registration Number P50300056450 (Only Applicable after project registration) being developed by NITIN BUILDERS. Based on Site Inspection, with respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, Icertify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number 01 (to be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage of No. (2) Actual Work Done (1) (3) 1. Excavation 90% 2. NA Basements (if any) 3. Podiums (if any) NA 4. Plinth 50% 5 Stilt Floor 00% 00% 6. Slabs of Super Structure 00% 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises Sanitary Fittings within the Flat/Premises 00% 8 00% 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and Underground Water Tanks 00% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. 00% 11. Installation of lifts, water pumps, Fire Fighting Fittings And Equipment as per CFO NOC, Electrical fittings, mechanical environment/CRZ NOC, equipment, Compliance to conditions of Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B the Registered Phase / CommonAreas (Internal and External Development Works) in respect to Project Number Details Sr. Common areas Proposed Percentage of Work done (5) No and Facilities. (Yes/No) (1) (2) (3) (4) Internal Roads& 00% 1. YES Footpaths 2 Water Supply YES 00% 3 Sewerage (chamber, lines, YES 00% Septic Tank, STP) 4. Storm Water Drains YES 00% 5. Landscaping & Tree Planting YES 00% 00% 6 Street Lighting YES YES 00% 7. Community Buildings 8. Treatment and disposal of YES 00% sewage and sullage water 9. Solid Waste management & YES 00% Disposal Water conservation, Rain water YES 00% 10. harvesting NO NA 11. Energy management Fire protection YES 00% 12. And fire safety requirements Electrical meter room, sub YES 00% 13. station, receiving station 14. Others (Option to Add more) RAHU FARKA Yours Faithfully, B.Arch. Ar. RAHUL FARKBO7IA01 (License No. CA/2007/40264) Architect's Signature & Name Agreed and Accepted by, NITIN BUILDERS Promoter's Signature & Name Date: 23/10/2024