ARCHITIECT'S CERTIFICATE |To be submitted at time of Registration of ongoing project and for withdrawal of Money from Designated Account] Date: 22/04/2025 To, Mr.Ajay Namdevrao Dambale, Subject : Certificate of percentage of completion of construction Work of Amravati, having single Building project situated on the plot Survey No 201, final Plot no 143 demarcated by its boundries NORTH:-12.00 m. ROAD SOUTH:- Plot no 142,144 EAST:- 7.50 m. ROAD WEST :- 7.5 m. ROAD of Mouje- Rahatgaon, Amravati District Amravati, PIN 444602, admeasuring 832.55 sq.mts. area being developed by Mr Ajay Namdevrao Dambale, Amravati Sir, IAdwait Madhukar Saurkar have undertaken assign1ment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Amravati having having single Building Project, situated on the plot bearing Survey no. 201, Final Plot no 143 of Mouje-Rahatgaon, Amravati.PIN 444602 admeasuring 832.55 sq. mts. area being developed by Mr Ajay Namdevrao Dambale ,Amravati. 1.Following technical professionals are appointed by Owner/ Promoter: [1]M/s Mr. Ar.Adwait M. Saurkar Architect: (2] M/s Mr. Er.Pankaj Deshmukh as Structural Consultant [3] M/s Mr .as MEP Consultant (4]M/s /Mr -as Site Supervisor Based on Site Inspection ,with respect to each of the Building/Wing of the aforesaid Real Estate Project ,Icertify that as on the date of this certificate , the Percentage of Work done tor each of the Building/Wing of the Real Estate Project as registered vide number under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B. Table A Building/Wing Number-[to be preparedseparately for each Building/Wing of the Project| Sr.No. Tasks/Activity Percentage of Work Done 1] Excavation 100% 2] One Number of Basement and Plinth 100% 3] No Podium Provided 4] Stilt Floor 5] 8[Eight] No. of Slabs of Super Structure 55.76% 61 Internal Walls,Internal Plasters.Floorings Within Premises Doors and Windows to each of the shop/ Premises 71 Sanitary Fitting Within Shop/Flat/Premises Electrical Fitting Within the Shop /Flat/Premises 8 Staircases,Lift wells and Lobbies at each floor level Connecting staircases and lifts, overhead and underground Water Tanks. 9 The external plumbing and external plaster,elevation Completion of terraces with waterproofing of the Building/ Wing. 10] Installation of Lifts. water pumps. Fire Fighting Fittings And Equipment as per CFO NOC, EIectrical Fitting to Common areas, electro, mechanical equipment, compliance To conditions environment/CRZ NOC, finishing to entrance lobby/s,plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all Other requirements as may be required to obtain occupation/Completion certificate Table B Internal&External Development Works inRespect of the entire Registered Phase S.No Common areas and facilities, Proposed Percentage of Details Amenities [yes/No] Work Done Internal Roads & Foothpaths NO N.A 2 Water supply YES 0% 3 Sewarage (chamber. lines, YES 0% Septic Tank, STP) 4 Storm Water Drains NO N.A. 5. Landscaping &Tree Planting NO N.A. 6 Street Lighting NO N.A. 7. CommunityBuildings NO N.A. 8 Treatment and disposal of NO N.A. sewage and sullage water 9. Solid Waste management && NO N.A. Disposal 10. Water conservation Rain YES 0% water harvesting 11. Energy management 12. Energy management NO N.A. 13. Fire protection and fire NO N.A. safely requirements 14. Electrical meter room, Sub NO N.A. station, receiving Station Your's Faithfully Adwait M. Saurkar Ar. Ad-va.it Di. Suurkar COA No. CA!20nGAS004 (License NO :- CA/2009/46004