Signature Not Verified Digitally signed by Ghanshyam Wasudeorao Waghade Date: 2024.04.06 12:52:08 IST BUILDING Reason: Approved Drawing Plan Location: Amravati Municipal Corporation FSI AREA BALCONY DUCT VENT Other TOTAL Project Code : DDMCA-23-106894 Application Number : RDDMCA202400977 BUILDING FLOORS TERRACE LIFT LIFTWELL Proposal Number : 255344 COMM. RESI. IND. EDU. INS. MEZZ. PROP. SHAFT Deduction FSIAREA SCHEDULE OF OPENING: Certificate Number : DDMCA/RB/2024/APL/00276 BUILDING FOURTH FLOOR PLAN 565.07 0.00 0.00 0.00 0.00 0.00 126.76 0.00 3.42 3.42 0.00 0.00 66.73 494.92 LEGENDS: BLD NAME NAME LENGTH HEIGHT NOS. BUILDING V 0.54 1.20 1 BUILDING TYPICAL 2ND 3RD 5TH 1615.50 0.00 0.00 0.00 0.00 0.00 445.59 0.00 10.26 10.26 0.00 0.00 99.06 1506.18 PLOT BOUNDRY SHOWN WHITE PROPOSED WORK SHOWN RED BUILDING V 0.42 1.20 1 FIRST FLOOR BUILDING PLAN 538.55 0.00 0.00 0.00 0.00 0.00 120.54 0.00 3.42 3.42 0.00 0.00 33.02 502.11 DRAINAGE LINE SHOWN YELLOW LIGHT BUILDING V 0.39 1.20 3 UPPER GROUND WATER LINE SHOWN BLUE DOTTED BUILDING 505.03 0.00 0.00 0.00 0.00 0.00 102.62 0.00 3.42 3.42 0.00 0.00 1.52 500.09 FLOOR PLAN BUILDING V 0.38 1.20 2 ENCLOSED BAL SHOWN BROWN LOWER GROUND BUILDING FLOOR PLAN 402.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.42 3.42 0.00 0.00 1.52 397.42 TERRACE SHOWN DARK YELLOW BUILDING V 0.35 1.20 2 OPEN BAL SHOWN BRAWN BASEMENT BUILDING V 0.53 1.20 2 BUILDING FLOOR PLAN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 EXSTING SHOWN BLUE HATCHED BUILDING W 4.13 1.20 1 BUILDING Total 3626.51 0.00 0.00 0.00 0.00 0.00 795.51 0.00 23.94 23.94 0.00 0.00 201.85 3400.72 BUILDING W 4.22 1.20 1 BUILDING V 0.61 1.20 1 Parking Check (Table 8B) BUILDING V 0.64 1.20 1 RATIO Required BUILDING V 0.80 1.20 1 FSI DETAILS TENAMENT NO.OF Building Name USE Transport Incentive FSI AREA Tena/Area/Units BUILDING W 1.53 1.20 1 car Scooter car Scooter Vehicle/Ambula for Ancillary Area Ancillary Area Inclusive nce/Mini Bus Basic FSI Premium FSI TDR 9 Index green building 60% of 80% of Total Housing (20%) Drawing Value BUILDING V 0.72 1.20 1 (on serial no 1) (on serial no 1) (on serial no 1) If Applicable (2+3+4+5) (2+3+4+5) If Applicable BUILDING Commertial For every 10 beds 3 10 10.00 3.00 10.00 - ( on basic FSI) BUILDING W 1.42 1.20 1 For every 200 9.1 Permissible BUILDING Commertial sq.m. carpet area 3 11 1836.58 27.55 101.01 - 1.10 0.50 1.15 0.00 0.00 0.00 2.75 0.00 0.00 BUILDING V 0.75 1.20 1 Index or fraction thereof. 9.2 Existing BUILDING W 1.41 1.20 1 21.5394 For every 100 Comsumed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BUILDING Commertial sq.m. carpet area 2 6 798.65 15.97 47.92 - Index or fraction thereof BUILDING V 0.70 1.20 1 9.3 Balance Index Total - - - - - 46.52 158.93 - 1.10 0.50 1.15 0.00 0.00 0.00 0.00 0.00 0.00 BUILDING W 1.48 1.20 1 to be Consume BUILT UP AREA CALCULATION 9.4 Total BUILDING W 3.01 1.20 1 FOR LOWER GROUND FLOOR PLAN BUILDING Permissible PLine 912.56 414.80 954.04 0.00 0.00 1511.56 3792.96 0.00 0.00 AREA NAME LENGTH WIDTH Area(Sq.M) Area() BUILDING V 0.56 1.20 2 BLOCK 21.54 18.68 402.36 Parking Check As Per Multiplying Factor : 0.60 18.6805 18.6805 9.5 Proposed P (Note-Parking calculate as per regulation 14.2.1.6 Parking provisions in the TOD Zone shall be at 50% of those as mentioned in UDCPR.) BLOCK AREA TOTAL =402.36Sq.M Line Area (Should 912.56 414.80 562.10 0.00 0.00 1511.26 3400.72 0.00 3400.72 BUILDING V 0.62 1.20 2 LiftWell5 not exceed 9.4 ) Void13 - - 0.76 Required Proposed BUILDING W 2.71 1.20 1 Void12 - - 0.76 9.6 Index 1.10 0.50 0.67 0.00 0.00 0.00 2.27 0.00 0.00 Building Name Transport Transport Status LiftWell5 - - 3.42 Consumed Void12 Car/Mini Bus Scooter Vehicle/Ambula Car/Mini Bus Scooter Vehicle/Ambula TOTAL Deduction =4.94Sq.M nce/Mini bus nce/Mini bus Void13 Net BuiltUp Area =397.42 Sq.M Total 24 83 0 24 86 0 ok 21.5394 BUILT-UP AREA CALCULATION LOWER GROUND FLOOR PLAN BUILDING 24.5394 24.5394 B 9.49 24.539 B 24.539 0.150 8.555 0.100 3.318 0.100 3.318 0.100 8.749 0.150 0.230 8.475 0.100 3.318 0.100 3.318 0.100 8.749 0.150 0.230 0.150 W W 0.150 0.150 W W 1.900 1.900 BUILT UP AREA CALCULATION W W W W FOR FIRST FLOOR PLAN BUILDING 2.0119 22.4806 1.900 1.900 Area(Sq.M) BUILT UP AREA CALCULATION ENCBALCONY LiftWell3 AREA NAME LENGTH WIDTH FOR UPPER GROUND FLOOR PLAN BUILDING 6.5806 ENCBALCONY BLOCK 24.55 22.48 538.55 Void9 AREA NAME LENGTH WIDTH Area(Sq.M) 20.5806 20.5806 BLOCK AREA TOTAL =538.55Sq.M LiftWell4 BLOCK 24.54 20.58 505.03 OFFICE8 Void7 2 Void9 - - 31.50 7.353 8.55X7.56 OFFICE4 BLOCK AREA TOTAL =505.03Sq.M 7.433 (64.69 Sq.m) OFFICE7 OFFICE6 OFFICE5 8.55X7.56 Void8 Void8 - - 0.76 OFFICE1 9.110 Void11 - - 0.76 3.32X9.34 3.32X9.34 8.75X9.34 (64.69 Sq.m) OFFICE3 OFFICE2 Void7 - - 0.76 Void10 8.75X9.34 (30.99 Sq.m) (30.99 Sq.m) (81.23 Sq.m) 3.32X9.34 3.32X9.34 9.110 Void10 - - 0.76 6.41 (81.23 Sq.m) LiftWell3 - - 3.42 Void11 (30.99 Sq.m) (30.99 Sq.m) LiftWell4 - - 3.42 TOTAL Deduction =36.44Sq.M TOTAL Deduction =4.94Sq.M Net BuiltUp Area =502.11 Sq.M Net BuiltUp Area =500.09 Sq.M 0.230 ENCBALCONY 24.5394 0.230 ENCBALCONY F.R.D. BUILT-UP AREA CALCULATION FIRST FLOOR PLAN BUILDING F.R.D. 24.5394 24.5394 ENCBALCONY 0.230 BUILT-UP AREA CALCULATION UPPER GROUND FLOOR PLAN BUILDING DN. UP 0.100 ENCBALCONY DN. UP Proforma I : Area Statement 1. Area of plot (Minimum area of a, b, c to be 6.600 18.680 Lift Well 22.481 7.813 22.481 1.85X1.85 18.680 18.680 Lift Well 22.481 24.5394 considered) or area of subplot with sanctioned layout 829.60 9.4902 No. and subplot No. REFUGE AREA (3.42 Sq.m) 22.481 1.85X1.85 18.680 VOID (3.42 Sq.m) REFUGE AREA (a) As per ownership document (7/12, CTS extract) 6.581 10.50X3.00 VOID 829.60 FIRE LIFT 1 BUILT UP AREA CALCULATION (31.50 Sq.m) FIRE LIFT 10.50X3.00 VOID FOR FOURTH FLOOR PLAN BUILDING (b) as per TILR or City Survey measurement sheet 829.60 Urinal 1.50X1.50 Urinal 1.85X1.85 10.503x3.00 1.42X1.50 3.000Urinal (31.50 Sq.m) 0 9.49 (2.25 Sq.m) (2.13 Sq.m) (3.42 Sq.m) Urinal 1.50X1.50 1.42X1.50 1.85X1.85 1 AREA NAME LENGTH WIDTH Area(Sq.M) (c) as per Demarcated drawing area 829.60 ENCBALCONY 0.230 (2.25 Sq.m) (2.13 Sq.m) (3.42 Sq.m) BLOCK 26.54 22.48 565.07 6.8302 0.230 V WC FHR LESS 1.40X1.20 BLOCK AREA TOTAL =565.07Sq.M BASIN 0.63X1.20 V WC LiftWell1 A BUILT UP AREA CALCULATION (0.76 Sq.m) 6.5804 2.515 GENTS (1.68 Sq.m) 0.100 A A BASIN 1.40X1.20 FHR 0.63X1.20 (0.76 Sq.m) Refuse2 Void3 - - 0.76 FOR TYPICAL 2ND 3RD 5TH BUILDING 2.Area not in possession 0.00 A (1.68 Sq.m) TOILET Void1 2.515 TOILET WC ED GENTS Area(Sq.M) 0.100 AREA NAME LENGTH WIDTH 1.50X1.40 1.40X1.20 0.63X1.20 TOILET TOILET WC Refuse1 Void2 - - 0.76 3. Entire area (1-2) 829.60 (2.10 Sq.m) (1.68 Sq.m) (0.76 Sq.m) 2 22.4806 Urinal Urinal ED V 0.61X0.45 0.61X0.45 V 1.50X1.40 1.40X1.20 BLOCK 24.54 22.48 538.50 0.230 0.63X1.20 (0.27 Sq.m) (0.27 Sq.m) (2.10 Sq.m) Urinal Urinal 0.62X0.45 0.62X0.45 (1.68 Sq.m) (0.76 Sq.m) 1 Void2 Void1 - - 31.50 4.Deductions for - V V LiftWell2 0.100 (0.27 Sq.m) (0.27 Sq.m) BLOCK AREA TOTAL =538.50Sq.M 6.5806 Void3 1 Refuse2 - - 13.66 (a) Proposed D.P./ D.P. Road widening Area /Service Void6 Void6 - - 31.50 0.00 7.8374 Refuse1 - - 20.05 OFFICE2 OFFICE3 OFFICE4 Road / Highway widening 6.41 Void5 - - 0.76 6.080 LiftWell1 - - 3.42 OFFICE1 3.32X6.26 3.32X6.26 8.75X6.26 STORE2 STORE3 STORE4 Void4 (b) Any D.P. Reservation area 0.00 2 4.863 6.080 Void4 0.76 8.55X5.07 (20.77 Sq.m) (20.77 Sq.m) (54.56 Sq.m) STORE1 3.32X6.26 3.32X6.26 8.75X6.26 TOTAL Deduction =70.15Sq.M - - Void5 4.993 (43.39 Sq.m) 8.55X5.07 (20.77 Sq.m) (20.77 Sq.m) (54.56 Sq.m) Net BuiltUp Area =494.92 Sq.M LiftWell2 - - 3.42 (Total a+b) 0.00 (43.39 Sq.m) TOTAL Deduction =36.44Sq.M 5.Balance area of plot (3-4) 829.60 24.5394 6.41 1.900 1.900 Net BuiltUp Area =502.06 Sq.M BUILT-UP AREA CALCULATION FOURTH FLOOR PLAN BUILDING 6. Amenity Space 0.00 W W W 1.900 1.900 0.230 ENCBALCONY W ENCBALCONY 0.230 (Applicable if (1) > 20000 sqmt - W W W 0.150 8.555 0.091 3.327 0.100 3.318 0.100 8.748 0.150 0.230 ENCBALCONY W ENCBALCONY 0.230 24.539 0.230 8.475 0.150 3.268 0.100 3.318 0.100 8.749 0.150 24.5394 (Required -(a) Upto 20000 sqmt - Nil - RAIN WATER ON 1.000 21.539 2.000 24.539 ROOF TOP 1.200 BUILT-UP AREA CALCULATION TYPICAL 2ND 3RD 5TH BUILDING (b) Above 20000 sqmt - (a) + 5 % of Total area 0.00 1.000 21.539 2.000 1.200 FILTER BED WELL MANHOLE FREE BOARD 18000 Project Details SUMP WELL LITRES 7. Net Plot Area (5-6 ) 829.60 B BORE CAPACITY. 100 mm PIPE FOR INLET BAFFLE OUTLET Proposal code - DDMCA-23-106894 B CARRING RAIN WATER WITH MESH AT ROOF PLAN RAIN WATER FALLING ON PLAN CROSS SECTION BK.WALL P.C.C. SECTION THROUGH U. WATER TANK. WATER STORAGE REQUIREMENT M.S.GATE SCALE: 100 BUILT UP AREA CALCULATION Zone Type - Residential Zone with Shop line. (R-2) 8. Recreational Open Space - 1 M. ABOVE ROOF/GROUND COLLECTED BORE OVER HEAD WATER TANK REQUIRED P.C.C.COPING FOR BASEMENT FLOOR PLAN BUILDING Location - Non-Congested (a) If area (6) is more than 4000 sqmt - 10 % of (6) is CW_HT 1.0 m X1.0 m G.L. FROM ALL SIDE VENT PIPE .23 thk.BK.WALL 0 TENEMENT = 0 PERSON X 45.00 .Ltr 5.54 0.00 TYPICAL 2ND, 3RD, &,5TH, FLOOR PLAN 4TH FLOOR PLAN UPTO 10 % DEPTH. FINE SAND UPTO 20 % DEPTH. 2 TO 2.5 m 6 M.& ABOVE G.L. UPTO 10 % DEPTH. FINE SAND PERFORATED COVER ST_WID MANHOLE 0.00Ltr 578 TENEMENT = 578 X 340 PERSON X 45.00 .Ltr 15300.00Ltr GL. thk.BK.WALL CW_WIDTH .45 thk.STONE WALL. AREA NAME LENGTH WIDTH Area(Sq.M) Name of service - Revised Building Permission required. TYPICAL 2ND 3RD 5TH FOURTH FLOOR PLAN SCALE:- 1:100 COARSE SAND UPTO 20 % DEPTH. 3.00 M OUTLET P.C.C. STUDY Proposed___ SCALE:- 1:100 UPTO 20 % DEPTH. COARSE SAND Sub service - 0.00 4.9801 20 MM STONE UPTO 20 % DEPTH. PLAN OF UNDERGROUND COMPOUND WALL BLOCK 7.06 5.54 34.78 UPTO 50 % DEPTH. OPEN WELL 20 MM STONE INLET ST_LEN 15300.00 Ltr. X 1.50=22950.00 Ltr 40 MM STONE UPTO 50 % DEPTH. WATER STORAGE TANK PROPOSED-O.H.W.T = 0.00 .Ltr DETAIL 7.0601 DETAILED FILTER BED 40 MM STONE 1.00 M SEPTIC TANK DETAIL SCALE: 100 SCALE: 100 UGR Prop:3400.00 SCALE: 100 BLOCK AREA TOTAL =34.78Sq.M Cts No./Survey No. - 48 D /21/2 (b) If area is less than 4000 sqmt -Check - - LiftWell6 LiftWell6 - - 3.42 Tahsil : Main Office AMC(Above plot 150 sqmtr) i) If it is full number like 1,2,125,419,etc. As per 7.12 TOTAL Deduction =3.42Sq.M Mouza : Gaothan-Amravati abstract or City Survey Number - No Recreational - 2.08 2.08 Net BuiltUp Area =31.36 Sq.M Prorata Value : 0.00 open space is required ROAD 24.00 M. WIDE 3.46 ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then recreational open space is required. - BUILT-UP AREA CALCULATION BASEMENT FLOOR PLAN BUILDING FOOTPATH (A) 10 % Subject to minimum 200 sqmt 0.00 FOOTPATH 28.501 28.501 Proposed ______________ 0.00 (B) Exemption to leave open space subject to availing SP SP SP - SP SP SP SP SP SP basic F.S.I of 75 % SP SP SP SP SP SP SP 86 SP SP 70 B 24.539 (C) Exemption to leave open space subject to payment of 10 % land value of land at (7) as per annual - 4.507 5.643 4.518 B 5.726 0.150 8.555 0.100 3.318 0.100 3.318 0.100 8.749 0.150 statement of rate. 21.539 3.347 0.150 0.150 0.230 7.410 0.230 3.418 3.188 0.230 3.188 0.230 3.187 0.230 W W W W Certificate of Area: 1.900 1.900 Certified that the plot under reference was surveyed by me on 3.001 4.000 3.001 4.000 1.350 2023-12-12 and the dimensions of sides etc. of plot stated onplan 0.150 6.290 0.100 2.165 0.100 3.318 0.100 3.318 0.100 8.749 0.150 ENCBALCONY 0.150 are as measured on site and the area so worked out tallies with 0.230 W W V W V W V W V 0.230 SP SP the area stated in document of Ownership/ T.P. Scheme SP SP SP TOILET TOILET TOILET TOILET 28 1.20X1.80 1.20X1.80 1.20X1.80 Records/Land Records Department/City Survey records. ENCLOSED BAL. 1.00 M.WIDE SP 1.20X1.80 SP SP STAFF ROOM (2.16 Sq.m) (2.16 Sq.m) (2.16 Sq.m) (2.16 Sq.m) OFFICE8 Signature CP RAMP UP 1/2 SP 3.108 7.433 7.41X3.11 8.54X7.56 (Name of Architect/ Licensed Engineer/ Supervisor.) stack PARKING (23.02 Sq.m) SHOP10 OFFICE7 OFFICE6 OFFICE5 SP SP (64.69 Sq.m) Owner's Declaration - 5.533 6.29X5.81 3.32X9.34 3.32X9.34 8.75X9.34 9.030 SP I/We undersigned hereby confirm that I/We would abide by plans 0.230 (81.23 Sq.m) ENCLOSED BAL. 2.00 M.WIDE SP (36.56 Sq.m) (30.99 Sq.m) (30.99 Sq.m) 17 WC Urinal Urinal approved by Authority / Collector. I/We would execute the 3.016 3.140 V 1.50X1.00 0.70X0.60 0.70X0.60 CP structure as per approved plans. Also I/We would execute the (0.41 Sq.m) (0.41 Sq.m) 3/4 8.353 (1.50 Sq.m) stack PARKING 2.115 work under supervision of proper technical person so as to ensure TOILET STACK PARKING WC 5.20 x 2.12 ROOM1 ROOM2 ROOM3 ROOM4 SHOP9 SHOP8 SHOP7 SHOP6 10.498 V 1.35X1.00 3.19X8.20 3.19X8.20 3.19X8.20 3.19X8.20 3.32X10.50 3.32X10.50 3.32X10.50 5.33X10.50 the quality and safety at the work site. 21.250 30 31 34 35 38 21.250 (1.35 Sq.m) ENCBALCONY SP SP SP SP SP 0.230 (23.68 Sq.m) (23.67 Sq.m) (23.67 Sq.m) (23.66 Sq.m) 0.230 (34.83 Sq.m) (34.83 Sq.m) (34.83 Sq.m) (55.96 Sq.m) 0.230 ENCBALCONY Owner (s) name and signature F.R.D. 29 32 33 36 37 F.R.D. F.R.D. F.R.D. Architect/ Licensed Engineer/ Supervisor name and signature DN. UP SP ENCBALCONY 0.230 Job No. 28.812 DN. UP 47 48 19/20 DN. UP DN. UP stack PARKING CP 17/18 CP SP stack PARKING 28.812 STACK PARKING 46 45 18.680 6.600 6.600 Lift Well Lift Well 1.850 Lift Well 18.680 Lift Well 22.481 1.85X1.85 6.600 1.85X1.85 1.85X1.85 22.481 1.85X1.85 18.680 Owner details 43 SP 44 15/16 PASSAGE 1.85 M. WIDE 18.680 (3.42 Sq.m) (3.42 Sq.m) (3.42 Sq.m) (3.42 Sq.m) 20.580 20.580 stack PARKING ENCBALCONY VOID ABOVE CP 0.230 0.100 21/22 SP 42 41 stack PARKING CP FIRE LIFT FIRE LIFT FIRE LIFT 10.50X3.00 6.581 10.503x3.00 1.85X1.85 Urinal 1.85X1.85 Urinal 1.85X1.85 (31.50 Sq.m) Owner Name Postal Address Contact Number SP Urinal Urinal 3.000 39 40 4.269 3.000 3.000 1.50X1.50 1.42X1.50 3.000 1.50X1.50 1.42X1.50 13/14 (3.42 Sq.m) (2.25 Sq.m) (2.13 Sq.m) (3.42 Sq.m) (2.25 Sq.m) (2.13 Sq.m) (3.42 Sq.m) PASSAGE 2.10 M. WIDE PASSAGE 2.10 M. WIDE 23/24 stack PARKING ENCBALCONY stack PARKING CP 0.230 0.230 0.230 V ,,Amravati,Amravati,Maha V WC F.H.R. WC SHOP2 SRUSHTI BANDSONS 8888960006 ENCLOSED BAL. 2.00 M.WIDE CP rashtra-444601 FHR FHR FHR A A A 0.63X1.20 1.40X1.20 0.63X1.20 BASIN 1.40X1.20 0.63X1.20 A A A GENTS A (0.76 Sq.m) Urinal (0.76 Sq.m) (0.76 Sq.m) 5/6 A (1.68 Sq.m) 1.01X0.55 (1.67 Sq.m) 3.32X8.08 2.515 2.515 (0.55 Sq.m) TOILET A Partnership Firm CP stack PARKING 11/12 GENERAL WARD GENTS 0.150 Urinal 1.01X0.60 TOILET (26.81 Sq.m) SHOP3 SHOP4 SHOP5 TOILET WC Through its partner Amravati stack PARKING 8.083 WC 8.018 E.D. ED ED TOILET ED 13.44X7.79 (0.60 Sq.m) 0.63X1.20 1.50X1.40 1.40X1.20 0.63X1.20 3.32X8.08 1.39X1.20 0.63X1.20 Satyajit Vijay Band DR.ROOM (0.76 Sq.m) (2.10 Sq.m) (1.68 Sq.m) (0.76 Sq.m) 3.32X8.08 5.33X8.08 1.50X1.40 Urinal Urinal (1.66 Sq.m) (0.76 Sq.m) CP (2.10 Sq.m) (92.69 Sq.m) WC ENCBALCONY V V (26.81 Sq.m) V 0.61X0.45 0.62X0.45 V 0.100 (26.81 Sq.m) (43.09 Sq.m) 0.100 (0.27 Sq.m)(0.27 Sq.m) 1.20X1.20 5.08X5.71 5.938 (1.44 Sq.m) V 7/8 (26.93 Sq.m) WC CP stack PARKING 9/10 1.20X1.20 SHOP1 OFFICE2 OFFICE3 OFFICE4 Postal Address : 3.323 stack PARKING W (1.44 Sq.m) V 6.29X3.32 OFFICE1 6.030 CP (20.90 Sq.m) 3.32X6.26 3.32X6.26 8.75X6.26 ,,Amravati,Amravati,Maharashtra-444601,Amravati WC 8.55X5.07 4.993 (20.77 Sq.m) (20.77 Sq.m) (54.56 Sq.m) 1.20X1.20 (1.44 Sq.m) V (43.39 Sq.m) 1 16 W W ENCBALCONY ENCBALCONY SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP DESCRIPTION OF PROJECT : Type of Proposal : Commercial 0.230 5.080 0.230 2.100 0.230 3.188 0.230 3.188 0.230 3.188 0.230 3.187 0.230 RAMP DN 1.900 OPEN BALCONY 1.90 M. WIDE 1.900 1.900 1.900 BUILDING ON CTS. NO./SURVEY NO.- 48 D /21/2 7.778 21.539 7.778 BALCONY BALCONY BALCONY BALCONY BALCONY BALCONY ENCBALCONY W W W ENCBALCONY 3.741 0.230 W 0.230 4.747 4.500 0.150 6.290 0.100 2.165 0.100 3.318 0.100 3.318 0.100 6.899 2.000 0.230 8.475 0.100 3.318 0.100 3.318 0.100 8.749 0.150 SITE ADDRESS : SCOOTER 17 NOS 24.539 5.799 24.539 SHEET NO. 48-D,PLOT NO. 21/2-B, MOUJE:-GAOTHAN-AMRAVATI 1.000 21.539 2.000 4.411 SP SP SP SP SP SP SP SP B 28.825 SP SP SP SP SP SP SP SP SP SP SP SP SP SP B Name Of Architect : Pratik Ramesh Gotkhade LOGO ADDRESS OF OFFICE 49 OFFICE - Mudliyar Nagar Near Hanuman Mandir Amravati. FIRST FLOOR PLAN BASEMENT FLOOR PLAN LOWER GROUND FLOOR PLAN UPPER GROUND FLOOR PLAN OWNERS SIGN - TECHNICAL PERSON SIGN Signature Not Verified Verified by applicant Digitally signed by Pratik Ramesh Gotkhade Date: 2024.04.02 17:48:50 IST Reason: Technical Person DSC FIRST FLOOR PLAN Location: Amravati Municipal Corporation Project Code : DDMCA-23-106894 LOWER GROUND FLOOR PLAN UPPER GROUND FLOOR PLAN SCALE:- 1:100 Application Number : RDDMCA202400977 Proposal Number : 255344 BUILDING SCALE:- 1:100 SCALE:- 1:100 Date: 29/03/24 SCALE - 1:100 JOB NO - DDMCA-23-106894 CHECK BY - - SUBMISSION DRAWING Signature Not Verified Digitally signed by Ghanshyam Wasudeorao Waghade BUILDING Date: 2024.04.06 12:52:08 IST FSI DETAILS Reason: Approved Drawing Plan Location: Amravati Municipal Corporation FSI AREA BALCONY DUCT VENT Other TOTAL Project Code : DDMCA-23-106894 BUILDING FLOORS TERRACE LIFT LIFTWELL Incentive FSI Application Number : RDDMCA202400977 COMM. RESI. IND. EDU. INS. MEZZ. PROP. SHAFT Deduction FSIAREA for Ancillary Area Ancillary Area Inclusive Proposal Number : 255344 Basic FSI Premium FSI TDR Certificate Number : DDMCA/RB/2024/APL/00276 9 Index green building 60% of 80% of Total Housing (20%) Drawing Value (on serial no 1) (on serial no 1) (on serial no 1) FOURTH FLOOR If Applicable (2+3+4+5) (2+3+4+5) If Applicable BUILDING 565.07 0.00 0.00 0.00 0.00 0.00 126.76 0.00 3.42 3.42 0.00 0.00 66.73 494.92 ( on basic FSI) PLAN TYPICAL 2ND 9.1 Permissible BUILDING 1615.50 0.00 0.00 0.00 0.00 0.00 445.59 0.00 10.26 10.26 0.00 0.00 99.06 1506.18 1.10 0.50 1.15 0.00 0.00 0.00 2.75 0.00 0.00 3RD 5TH Index FIRST FLOOR 9.2 Existing BUILDING 538.55 0.00 0.00 0.00 0.00 0.00 120.54 0.00 3.42 3.42 0.00 0.00 33.02 502.11 PLAN Comsumed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Index UPPER GROUND BUILDING 505.03 0.00 0.00 0.00 0.00 0.00 102.62 0.00 3.42 3.42 0.00 0.00 1.52 500.09 FLOOR PLAN 9.3 Balance Index 1.10 0.50 1.15 0.00 0.00 0.00 0.00 0.00 0.00 to be Consume LOWER GROUND BUILDING 402.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.42 3.42 0.00 0.00 1.52 397.42 FLOOR PLAN 9.4 Total Permissible PLine 912.56 414.80 954.04 0.00 0.00 1511.56 3792.96 0.00 0.00 BASEMENT Area() BUILDING 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FLOOR PLAN 9.5 Proposed P BUILDING Total 3626.51 0.00 0.00 0.00 0.00 0.00 795.51 0.00 23.94 23.94 0.00 0.00 201.85 3400.72 Line Area (Should 912.56 414.80 562.10 0.00 0.00 1511.26 3400.72 0.00 3400.72 not exceed 9.4 ) 9.6 Index 1.10 0.50 0.67 0.00 0.00 0.00 2.27 0.00 0.00 Consumed Parking Check As Per Multiplying Factor : 0.60 Parking Check (Table 8B) (Note-Parking calculate as per regulation 14.2.1.6 Parking provisions in the TOD Zone shall be at 50% of those as mentioned in UDCPR.) RATIO Required Required Proposed Building Name TENAMENT NO.OF USE Transport Building Name Transport Transport Status AREA Tena/Area/Units car Scooter car Scooter Vehicle/Ambula Car/Mini Bus Scooter Vehicle/Ambula Car/Mini Bus Scooter Vehicle/Ambula nce/Mini Bus nce/Mini bus nce/Mini bus BUILDING Commertial For every 10 beds 3 10 10.00 3.00 10.00 - Total 24 83 0 24 86 0 ok For every 200 BUILDING Commertial sq.m. carpet area 3 11 1836.58 27.55 101.01 - or fraction thereof. For every 100 BUILDING Commertial sq.m. carpet area 2 6 798.65 15.97 47.92 - or fraction thereof OPEN TERRACE 1.200 Total - - - - - 46.52 158.93 - TERRACE LEVEL 5F 3.150 E.D. 3.150 TERRACE LEVEL FIFTH FLOOR TOILET WC CARPET AREA TABLE 3.150 4F BUILDING NAME FLOOR NAME UNIT NO. TENEMENT NO. CARPET AREA ENCLOSED BALCONY AREA TOTAL CARPET 3.150 BALCONY AREA AREA E.D. BUILDING LOWER GROUND 1 1 26.93 00.00 00.00 26.93 FLOOR FIFTH FLOOR FOURTH FLOOR TOILET WC 3.150 3F BUILDING LOWER GROUND 2 1 104.65 00.00 00.00 104.65 FLOOR BUILDING LOWER GROUND 3 1 26.13 00.00 00.00 26.13 E.D. 3.150 FLOOR LOWER GROUND FOURTH FLOOR THIRD FLOOR TOILET WC BUILDING 4 1 26.14 00.00 00.00 26.14 2F FLOOR 3.150 BUILDING LOWER GROUND 5 1 26.14 00.00 00.00 26.14 3.150 FLOOR E.D. 23.950 BUILDING LOWER GROUND 6 1 26.14 00.00 00.00 26.14 FLOOR THIRD FLOOR SECOND FLOOR TOILET WC OFFICE OFFICE OFFICE OFFICE 27.950 3.650 1F 29.200 BUILDING LOWER GROUND 7 1 23.02 00.00 00.00 23.02 FLOOR 3.650 BUILDING LOWER GROUND T 1 10.19 00.00 00.00 10.19 FLOOR E.D. BUILDING UPPER GROUND 1 1 18.07 2.83 12.43 20.90 SECOND FLOOR FLOOR FIRST FLOOR TOILET WC BUILDING UPPER GROUND 2 1 26.82 00.00 6.49 26.82 0F 4.200 FLOOR UPPER GROUND 4.200 BUILDING 3 1 26.82 00.00 6.49 26.82 FLOOR FIRST FLOOR E.D. Proforma I : Area Statement BUILDING UPPER GROUND 4 1 26.82 00.00 6.59 26.82 FLOOR 1. Area of plot (Minimum area of a, b, c to be UPPER GROUND FLOOR TOILET WC PASSAGE -1F considered) or area of subplot with sanctioned layout 829.60 BUILDING UPPER GROUND 5 1 28.14 12.82 10.41 43.09 3.000 No. and subplot No. FLOOR (a) As per ownership document (7/12, CTS extract) 829.60 3.050 BUILDING UPPER GROUND 6 1 36.55 19.42 00.00 55.97 (b) as per TILR or City Survey measurement sheet 829.60 FLOOR (c) as per Demarcated drawing area 829.60 UPPER GROUND BUILDING FLOOR 7 1 34.83 00.00 00.00 34.83 UPPER GROUND FLOOR LOWER GROUND FLOOR PASSAGE LESS ROAD LEVEL ROAD LEVEL 2.Area not in possession -0F 0.00 BUILDING UPPER GROUND 8 1 34.83 00.00 00.00 34.83 -4.50 FLOOR 3.000 3. Entire area (1-2) 829.60 4.500 BUILDING UPPER GROUND 9 1 34.83 00.00 00.00 34.83 4.Deductions for - FLOOR LOWER GROUND FLOOR (a) Proposed D.P./ D.P. Road widening Area /Service G.L. Road / Highway widening 0.00 BUILDING UPPER GROUND 10 1 31.62 4.94 00.00 36.56 1.500 FLOOR PIT-PARKING PIT-PARKING PIT-PARKING (b) Any D.P. Reservation area 0.00 BASEMENT FLOOR BUILDING FIRST FLOOR 1 1 25.60 17.80 00.00 43.40 (Total a+b) 0.00 SECTION VIEW - BUILDING 5.Balance area of plot (3-4) 829.60 BUILDING FIRST FLOOR 2 1 14.96 5.81 00.00 20.77 6. Amenity Space P.C.C. IN P.C.C. IN P.C.C. IN P.C.C. IN P.C.C. IN 0.00 1:6 mortar 1:6 mortar 1:6 mortar 1:6 mortar 1:6 mortar (Applicable if (1) > 20000 sqmt - BUILDING FIRST FLOOR 3 1 14.96 5.81 00.00 20.77 FRONT ELEVATION SECTION A-A (Required -(a) Upto 20000 sqmt - Nil - SCALE:- 1:100 SCALE:- 1:100 (b) Above 20000 sqmt - (a) + 5 % of Total area 0.00 BUILDING FIRST FLOOR 4 1 31.39 23.17 00.00 54.56 7. Net Plot Area (5-6 ) 829.60 FIRST FLOOR 8. Recreational Open Space - BUILDING 5 1 52.33 28.93 00.00 81.26 N ROAD 24.00 M. WIDE (a) If area (6) is more than 4000 sqmt - 10 % of (6) is 0.00 FIRST FLOOR required. BUILDING 6 1 25.18 5.81 00.00 30.99 Proposed___ 0.00 25.18 5.81 00.00 (b) If area is less than 4000 sqmt -Check - - BUILDING FIRST FLOOR 7 1 30.99 28.50 i) If it is full number like 1,2,125,419,etc. As per 7.12 FIRST FLOOR abstract or City Survey Number - No Recreational - BUILDING 8 1 44.89 19.80 00.00 64.69 24.0M WIDE ROAD open space is required ST ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then FIRST FLOOR 00.00 00.00 - BUILDING G 1 8.77 8.77 recreational open space is required. 5.64 1.200 OPEN TERRACE OPEN TERRACE 3.000 4.507 (A) 10 % Subject to minimum 200 sqmt 0.00 TYPICAL 2ND, TERRACE LEVEL 4.507 BUILDING 1 3 25.90 17.49 00.00 43.39 3RD, 5TH Proposed ______________ 0.00 TYPICAL 2ND, (B) Exemption to leave open space subject to availing BUILDING 2 3 14.96 5.81 00.00 20.77 - basic F.S.I of 75 % 3.150 3RD, 5TH 3.00 21.54 4.01 3.000 (C) Exemption to leave open space subject to payment TYPICAL 2ND, 3 14.96 5.81 00.00 20.77 of 10 % land value of land at (7) as per annual - BUILDING 3 3RD, 5TH statement of rate. TOILET FIFTH FLOOR TYPICAL 2ND, 4 31.39 23.38 00.00 54.77 BUILDING 3 Certificate of Area: 3RD, 5TH 4.000 Certified that the plot under reference was surveyed by me on BUILDING TYPICAL 2ND, 5 3 52.18 29.05 00.00 81.23 3.150 2023-12-12 and the dimensions of sides etc. of plot stated onplan 3RD, 5TH are as measured on site and the area so worked out tallies with the area stated in document of Ownership/ T.P. Scheme TOILET BUILDING TYPICAL 2ND, 6 3 25.18 5.81 00.00 30.99 FOURTH FLOOR Records/Land Records Department/City Survey records. 3RD, 5TH Signature (Name of Architect/ Licensed Engineer/ Supervisor.) TYPICAL 2ND, 7 25.18 5.81 00.00 30.99 BUILDING 3 3.150 3RD, 5TH Owner's Declaration - 21.24 I/We undersigned hereby confirm that I/We would abide by plans TYPICAL 2ND, 8 44.89 19.80 00.00 64.69 approved by Authority / Collector. I/We would execute the BUILDING 3 3RD, 5TH TOILET THIRD FLOOR PROPOSED structure as per approved plans. Also I/We would execute the work under supervision of proper technical person so as to ensure 4.000 BUILDING TYPICAL 2ND, G 3 8.77 00.00 00.00 8.77 CONSTRUCTION the quality and safety at the work site. 28.81 3RD, 5TH Owner (s) name and signature 3.150 18.68 18.68 TYPICAL 2ND, 00.00 00.00 BUILDING L 3 2.10 2.10 23.500 3RD, 5TH Architect/ Licensed Engineer/ Supervisor name and signature Job No. BUILDING FOURTH FLOOR S1 1 25.60 17.80 00.00 43.40 TOILET SECOND FLOOR BUILDING FOURTH FLOOR S2 1 14.96 5.81 00.00 20.77 Owner details 3.650 BUILDING FOURTH FLOOR S3 1 14.96 5.81 00.00 20.77 Owner Name Postal Address Contact Number BUILDING FOURTH FLOOR S4 1 31.39 23.38 00.00 54.77 TOILET FIRST FLOOR ,,Amravati,Amravati,Maha SRUSHTI BANDSONS 8888960006 rashtra-444601 BUILDING FOURTH FLOOR 1 1 52.54 28.69 00.00 81.23 A Partnership Firm Through its partner Amravati 4.200 Satyajit Vijay Band BUILDING FOURTH FLOOR 2 1 25.18 5.81 00.00 30.99 R.S. R.S. BUILDING FOURTH FLOOR 3 1 25.18 5.81 00.00 30.99 TOILET UPPER GROUND FLOOR Postal Address : 3.29 BUILDING ROAD 0.600 ,,Amravati,Amravati,Maharashtra-444601,Amravati FOURTH FLOOR 4 44.89 19.80 00.00 64.69 21.54 BUILDING 1 RAMP DN FOURTH FLOOR 00.00 00.00 3.050 DESCRIPTION OF PROJECT : L 2.10 2.10 R.S. 7.78 BUILDING 1 4.500 Type of Proposal : Commercial TOILET LOWER GROUND FLOOR BUILDING ON CTS. NO./SURVEY NO.- 48 D /21/2 5.78 0.450 FOURTH FLOOR G 8.77 00.00 00.00 8.77 BUILDING 1 ROAD LEVEL SITE ADDRESS : SHEET NO. 48-D,PLOT NO. 21/2-B, MOUJE:-GAOTHAN-AMRAVATI G.L. RWH 28.83 Name Of Architect : Pratik Ramesh Gotkhade 18.0M WIDE ROAD LOGO ADDRESS OF OFFICE PIT- PARKING PIT- PARKING BASEMENT FLOOR OFFICE - ROAD 18.00 M. WIDE Mudliyar Nagar Near Hanuman Mandir Amravati. P.C.C. IN P.C.C. IN P.C.C. IN P.C.C. IN P.C.C. IN OWNERS SIGN - TECHNICAL PERSON SIGN 1:6 mortar 1:6 mortar 1:6 mortar 1:6 mortar 1:6 mortar Signature Not Verified Verified by applicant Digitally signed by Pratik Ramesh Gotkhade Date: 2024.04.02 17:48:58 IST Reason: Technical Person DSC Location: Amravati Municipal Corporation Project Code : DDMCA-23-106894 Application Number : RDDMCA202400977 Proposal Number : 255344 SECTION B-B SCALE - 1:100 Date: 29/03/24 SCALE:- 1:100 JOB NO - DDMCA-23-106894 CHECK BY - - SUBMISSION DRAWING