F6RM 1 Date: ARCHITEET,S CERTIFICATE (To be submitted at the time Registration of Ongoing Project and for withdrawal of Money from Designated Account - Building / Wing wise) To, Date : 30 I A9/2A24 Rayaji Realty Through Partner, Sanchit P. Patil, Chetan C. Wardhekar, Amravati" Subject: Certificate of cost incurred for development of RAYAJI REALTY for construction of residential buiiding L of the Project P50300055251( MahaRERA Registration Number) Situated on the ptot no 26A, 268,77 A Survey No tS7 /U2 Towards East 7,50mtr. wide Road, Towards West Layout Plot Ns. 25-A & 25- B, Towards North 9 mtr. Wide Road, Towards South layout Plot No. 27- 8..." 5ir, I Mr. Tejas P. Patil have undertaken assignment of certifying estimated cost for subject Real Estate Project proposed to be registered under lvlahaRERA, being Residential Building 1of the project P50300055251( hfrahaRERA Registration Number) situated on the plot no 26A, 26A, 27 A, Survey No 187/U2 Towards East 7.50mtr. wide Road, Towards West Layout Plot No. 25-A & 25- B, Towards North 9 mtr. Wide Road, Towards Sourth layout Plot No. 77- 8...." Amaravti , Mauje - Rahatgaon, Taluka & District - Amaravati, Pin No. 444604 adrneasuring 577.80 sq.m area being Developed by Rayaji Realty Through partner Shri Sanchit P" Patil and ehetan c" Wardhekar, Amravati 1". Following terhnical professionals are appointed by owner / Prornoter:- l. Mr. Tejas P. Patii ( Architect) tl. Mr. Sanrir Basra ( Struetural consutant) Based on site lnspection, with respect to each of the Buiiding / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of work done for each of the building /Wing of the Real Estate Project : ARCHITECTURE r INTERIOR r L.ANDSCALE as registered vide number P50300055251 under RERA is as per table A herein below . The percentage of the work executed with respect to each of the major activity of the Buiiding/ Wing and overall Percentage of the work done with respect to each Building /wing is detailed in the Table B. Table A tsuilding/wing number_i To be prepared separately for each Building / Wing of the Project) Sr. No" Tasks/Activity Percentage of work done t Excavation 1.AO% 2 Number of Basement{s)and Plinth 100% 3 Number Of Podiums 4 Stilt Floor 5 7 number of slabs of super structure ffio% 6 lnternal walls, internal plaster, Floorings within 90% Flats/premises, Doors and Windows to each of the Flatfpremises 7 Sanitary Fittings within the Flat/Premises, 8A% Electrical Fittings within the Flat/ Premise. 8 Staircase, Lifts Wells and lobbies at each Floor level 8A% connecting Staircase and lifts, Overhead and Underground Water Tanks 9 External plumbing and external plaster, elevation, 8A% completion of terrace with the waterproofing of the building 10 lnstallation of Lifts, water pumps, fire Fighting Fittings and a% Equipnrent as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Cornpliance to conditions of environnrent /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to building /wing, Compound Wall and all other requirernents as may be required to Obtain Occupation I Completion Certificate TABLE - B lnternal & External Development Works in Respect of the each Building / Wing project Sr.No. Common Roads and Facilities, Proposed Percentage of Details Amenities (Yes/No) work done 1 Internal Roads & Footh paths No 2 Water Supply No 0% 3 Sewerage {chamber, sewage lines) Yes o% Storm Water Drains 4 Storm Water Drains No 5 Landscaping & Tree planting Yes o% 6 Street Lighting No 7 Community Building No 8 Treatment and disposal of sewage No and sullage water I Solid Waste management & Disposal No 10 Water conservation, Rain water Yes Rain harvesting Water Harvesting 11 Energy management No 12 Fire protection and fire safety Yes As per requirements Request 13 Electrical meter roorn, sub-station, Yes a% Electric receiving station Meter 14 Other (Mr. Tejas P. Patil ) IOIID ts SEdlo RAYAJI REAITY , hoprAr. Tefas Pltil raw & partner Agreed and Accepted by: RAYAJI REALTY Date: 30 / 09 /202q