Date : FORVT x. ARCHITECT'S CERTIFICATE {To be submitted at the time Registration of ongoing project and for of Money from Designated withdrawal nccount _ Building Wing To, / wise) Date: 31" I OZ12g2a Rayaji Realty Through Partner, sanchit p. Fatil, chetan c. wardhekar, Arnravati. subject: certificate of ccst incurred for rieveropment construction of residentiai of RAyAJT REALTy for building L of the rrolect p50300055251( Registration Number) situated MahaRERA on the prot no z6a, 268, Towards East 7.50mtr" ?TASurvey No 1g7/u2 wide Road, Towards west Towards North g mtr" wide Layout prot No. 25_A & 25_ B, Road, Towarcrs south rayout prot No. 27- 8.... Sir, I Mr' Tejas P' Patil have undertaken assignment subject Real Estate Project of certifying estirnated cost proposed to be registered for Residential Building L of under MahaRERA, being the project p50300osszsr1 Number) situared on rhe ptot MahaRERA Registration no 2G,A,;;;,rio, ,rrvey 7'50mtr' wide Road, Towards No j,s7/J,/zTowards East west Layout Frot No. zs-A mtr. Wide Road, Towards & zs- B, Towards North g South layout plot No. 27- Rahatgaon, Taruka & District * B....,A.orr*r,i , Mauje * Amaravati, pin No" 444604 admeasuring 577.g0 i nea itv in'",*n pa rtner ::J.i::: l:: T,nf;ff i 3,,ffJf s h ri sa nch it p pa tir 1' Fo*owing technicar professionars are appointed by owner promoter:- L Mr. Tejas p. paril (Architect) / ll. Mr. Samir Basra (structural consutant) Based on site rnspection, with respect to each of the aforesaid Real Estate Project, Buirding / wing of the I certify that as on Percentage of work done the date of this eertificate, for each of the building the as registered vide number /Wing of the Real Estate project P5030005525r. unce. nrnA is as per tabre A herein : ARCHIfICTURI r L,ANDSCALE below ' The percentage of the work executed with respect to each of the major activity of the Building/ wing and overall percentage of the work done with resBect to each Buirding lwing is detaired in the Tabre B. Table A Building/wing number ( To be prepared separately for each Building / Wing of the project) Number of Basement{s)and fi,ntfi Number Of podiums 7 numher of slabs of super structure lnternal walls, internal plurtei,Hoffi w,.thin-.- 15% Flats/premises, Doors and Windows to each of the Sanitary Fittings within tfre Flrt/p*A*q Electrical Fittings within the Flat/ premise. Staircase, Lifts Welts tonffi 1A% connecting Staircase "nC and lifts, Overhead and Underground Water Tanks External plumbing unu e*tern@ completion of terrace with the waterproofing of ihe lnstallation of Lifts, water pu*pr,@ Equipment as per cFo Noc, Electricar fittings to common Areas, electro, mechanical equipmen! Compliance to conditions of environment /cRZ Noc, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to nd Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate TABIE - B lnternal & External Development Works in Respect of the each Building I Wing project Sr.No. Common Roads and Facilities, Proposed Percentage of Details Amenities {Yes/No} work done 1 lnternal Roads & Fosth paths No 2 Water Supply No Aa/o b 3 Sewerage (chamber, sewage lines) Yes a% Storm Water Drains 4 Storm Water Drains No 5 Landscaping & Tree planting Yes a% 6 Street Lighting No 7 Community Building No I Treatment and disposal of sewage No and sullage water 9 Solid Waste management & Disposal No 10 Water conservation, Rain water Yes Rain harvesting Water Harvesting 11 Energy management No L2 Fire protection and fire safety Yes As per requirements Request L3 Electrical meter room, sub-station, Yes a% Electric receiving station Meter ,'l l-4, 'l:r:li' L4 Other {Mr- Tejas P. Patil } ffiffiffiffi&&sdfrm ffi" &r. Ye$a* FetSS Aceepted by: RAYAJI REALTY Date: 3U 0f /2A24 rF $ I F, $ $l $ li s: $