FORM -2 ENGINEER'S CERTIFICATE (To be subrnitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Project wise) Date 11/07/2024 The Ratna Mauli Construction. Amravati -444601. Subject: Certificate of Cost incurred for Development of Ratna Mauli Apartrnent having MahaRERA Registration Number being developed by Construction (As on 30/06/2024) Sir Vwe Ahinh Dotnl have undertaken assianment of certifying Estimated Cost for Dotno Mnli Apartment having MahaRERA Registration Number P50300055108 being developed by Ratna 2. We have estinated the cost of Civil. MEP and Allied works required for completion of the apartments and proporionate completion of internal &eternal works of the project as per specficatons mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/ plans made availabie to us for the project under reference by the Developer Consutants. The Schedule of times and quantity required for the entire work as calculated by Quantity Surveyor appointed by Developer Engineer, the assumption of the cost of material. labour and other inputs made by deveioper, and the site inspection carried out by us to ascertainconfirm the above anaBysis given to us. 3. We estimate Total Estimated Cost cf completion of the aforesaid project under reference as Rs. 2.25 00 000/- (Totalof Table Aand B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP, and alied works required completion of the apartments and propotionate completionof internal & external works, as per specifications mentioned in agreemet of sale and for the purpOse of obtaining occupation certificate / completion certificate for the building(sWing(s/Layout/Plotted Development from the Amravati Municipa Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost incurred till date is calculated at Rs.1.66.40.000/-, The amount of Estimated Cost Incurred is calculated on the basis of input materials/services used and unit cost of these tems. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartrnents and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs 41.60,000/ 6.icertfy that the Cost of theCivil, MEP and allied work for the apartrnents and proportionate internal &external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and BBelow. ftt Äshish R. Patel CIVIL ENGINEER AMC Reg.No. 00529 Hob - 7387143127 TABLE-A Building /Wing ILayout plotted Development bearing Number called Sai Park (to be prepared separately for each Building /Wing/Layout/Plotted Development of the Real Estate Project) Sr. No. Particulars Amounts Total Estimated cost of the building as on date of Registration is Rs 2,08,00,000/ 2 Cost incurred as on date of certificate Rs 1,66,40,000/ 3 Work done in Percentage (as Percentage of the estimated cst) 80% Balance Cost to be incurredt* (Based on Estimated Cost) Rs 41,60,000/ 5 Cost Incurred on Additional /Extra ltems not included in the Estimated Cost (Table-C) Rs TABLE -B Internal &. External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts Total Estimated cost of the Internal and External Development Works including amenities and Rs Facilities in the layout as on date of Registration IS 2 Cost incurred as on date of certificate Rs 3 Work done in Percentage (as Percentage of the estimated cost) % Balance Cost to be Incurred (Based on Estimated Cost) Rs 5 Cost Incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) Rs Yours Faithfully Aastt Ashish R. Patel Signature of Engineer CIVIL ENGINEER AMÇ Reg.No. 00629 (Licence No. - 7387143127 Local Authority License no. Agreed and accepted by: Signature of Promoter Name: Date: Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done byoffice of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent Quantity Surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) As this and Actual Cost incurred (2) due to deviation in quantity required/escalation of cost etc. development of the Real Estate is an estimated cost, any deviation in quantity required for Project will result in amendment of the cost incurred/to be incurred. exhaustive. 4. All components of work with specifications are indicative and not Any deviations in input 5. Please specify if there are any deviations/qualifications. Example: material used from specifications in agreement of sale. Table C List of Extra/Additional /Deleted Items considered in cost (Which were not part of the original Estimate of Total Cost) Sr.No. List of Extra/Additional/Deleted Items Amount (In Rs) 1 2