Cape designstudio ROHIT PUNSHI ARCHITECT B.ARCH. MBA FORM 1 [see Regulation 3] ARCHITECTS CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Building/Wing wise) Date : 11/07/2024 To, Ratna Mauli Construction, Amravati Work of: abnn Subject: Certificate of Percentage of Completion of Construction Mauli Apartment having MahaRERA No. P50300055108 being developed by Ratna Mauli Construction as on (30/06/2024) Sir, I| we Rohit O. Punshi have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Ratna Mauii Apartment having MahaRERA No P50300055 108. of Based on Site Inspection, with respect to Layout/each of the Building/Wing the aforesaid Real Estate Project. Icertify that as on the date of this certificate, Estate the Percentage of Work done for each of the building / Wing of the Real Project under MahaRERA is as per Table A herein below. The percentage of the detailed work executed with respect to each of the activity of the entire phase is in Table B. Table A separately for each Building Building /Wing Number Wing A (to be prepared /Wing ol the Projcc) Percentage Sr. Tasks /Activity of No work done N.A Aggregate arca of recreational Open Space 1 Total Building Count 1 Sanction Building Count 921.26 4 Builtup ara as per approved PSI 920.88 5 Built up arca aS per poposed FSI 1.75 6 Total FSI N.A 7 No. of Basement 100% No.of Plinth N.A No. of Podiums 100 % 10 Silt Floor No. of Slabs of Super Structure 100 % 11 4Car,2 1Sc 12 No. of Open Parking N.A 13 No. of Closed Parking N.A 14 No. of Garages 100 % 15 lnternal walls, Internal Plaster, Floorings within Flats/ Premises, Doors and Windows to cach of the Flat/ Premises 16 Sanitary Fittings within the Flat/ Premises, Electrical 80% Fittings within the Flat/Premises Floor level 80% 17 StaircaSes, Lifts Wells And Lobbies at cach Lifts, Overhead and connecting Staircases and Underground Water Tanks 100 % 18 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing TABLE-B the entire Internal & External Development Works in Respect of Registered Phase Details Common areaS and Proposed Percentage S.No. of Facilities, Amenities (Yes/No) Work done NA No NA Internal Roads & Footpaths Borewell and 100 % Yes 2. Water Supply Pump installed As per Plan Yes 80 % 3. Sewerage (chamber, lines, Septic Tank ,STP) NA Storm Water Drains No NA Landscaping & Tree Planting No 5 NA No 6 Street Lighting As per Plan Yes 80% 7. Electrical meter room, sub station, receiving station NA No Aggregate area of recreational Open Space NA No 9 Open Parking NA No 10 Community Buildings NA Treatment and disposal of No 11. sewage and sullage water NA Solid Waste management & No 12. Disposal As per Plan Yes 80 % 13. Water conservation, Rain water harvesting No NA 14. Energy management No NA 15 Fire protection and fire safety requirement No NA 11 Others ( Option to Add more) Yours Faithfully C.OA. Reg.No. CA/2006/38480, ROHIT PUNSHI (Architect) rohitpunshi@gmail.com ,contact: +91 9403419559, 12, Subhash Colony, AMRAVATI - 444 606 (M.S.)