FORM 1 ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account – Building/Wing wise) To, Date: 10/01/2026 Shrushti Infra, Amravati Subject: Certificate of Percentage of Completion of Construction Work of: Rachana Srushti Phase 2 having MahaRERA No. P50300049603 being developed by Srushti Infra as on (01/12/2025) Sir, I/ we ______________ have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Rachana Srushti Phase 2 having MahaRERA No. P50300049603. Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks / Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 100 2 Basements (if any) 100 3 Number of Podiums (if any) 0 4 Plinth 100 5 Stilt Floor 70 6 slabs of super structure 0 7 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. 45 9 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0 completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting 0 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE – B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths 2 Water Supply 3 Sewerage (chamber, sewage lines), Storm Water Drains 4 Storm Water Drains 5 Landscaping & Tree Planting 6 Street Lighting 7 Community Building 8 Treatment and disposal of sewage and sullage water 9 Solid Waste management & Disposal 10 Water conservation, Rain water harvesting 11 Energy management 12 Fire protection and fire safety requirements 13 Electrical meter room, sub-station, receiving station 14 Other Yours Faithfully AR. SHAILENDRA DESHMUKH (License no CA/97/21932 ) Agreed and accepted by: Signature of Promoter Name: Date: