I AIIIH':\111'(' /\ FORM I 1s,,,. 1i(•~111ano11 JI \ IH 'I1 ITECT'S <'E lffl Fl( 'ATE ( fo b1: s11bmitt~'ll :11 thL' 1i111,,: ol Rq istrnlin11 ol 011 goi11 g l'rojrcl :111cl Im wi thdrnw.il 1 or t\lo11L'Y l'n1111 lksig11ul1.:d /\n:ot111I) Da Ic: 15/07/2024 Pr:11ibhn Pr:n in l\,lnhallc ITS- 27. Venus Plaza, Shcgaon Nah.a squ::i rc, Amrnvati - 444603 Subject: Certificate or Percentage of Completion of Construction Work of Avantika Residency h:1\ ing J\ laha RERA Registration Number P503000542 I I being developed by Prntiksha Pravin J\bhalk. Sir, I/\VcShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Avantika Residency having Maha RERA Registration Number P5030005421 t being developed by Pratiksha Pravin Mahallc. Based on Site Inspection, with respect to the aforesaid Real Estate Project.I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout/ Building/ Wing Number(to be prepared separately for each Layout 'Building/ Wing of the Sr. Tasks/ Activity Percentage of Actual No. Work Done (2) (I) (As on dale of the Ce1ti ficate) (3) I. Excavation Excavation 0% 2. Basements (if any) - - ,., .). Podiums (if any) - - Plinth 1 0% 4. 5. Stilt Floor - -- Slabs of Super Structure 6. 0% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 0% 8. SanitaryFittings within the Flat/Premises 0% 9. Staircases, 1 lifts Wells and,Lobbies at e;1ch Floor level Overhead and Underground Water Tanks 0% I 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing. 0% 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 0% entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. I TABLE-B Common Areas (Internal and faternal Ocvdopmcnt Works) in respect of the Registered Phase/ Project Number Proposed Details Sr. No. I Common areas and Facilities Percentage of (Yes/No) Actual Work Done ! (I) (2) (3) (As on date of the Certificate) (5) (4) ' I. No - Internal Roads &Footpaths Boarwell 0% 2. Water Supply "J. Sewerage(Chamber,lines,SepticTank, Septic Tank 0% STP). 4. - Storm Water Drains No 5. Landscaping &Tree Planting Tree planting 0% 6. Street Lighting No 7. Community Buildings ._ I • No .. ." •• 8. Treatment and disposal of sewage a:,d • , . No su II age water. - 9. No Solid Waste management &Disposal - 10. Water conservation/ RWH 0% Rain waler harvesting No - ll. Energy management 12. Fire protection and fire safety Yes 0% requirements 13. Yes 0% Electrical meter room, sub-station, receiving station, 14. Others (Option to Add more). Yours Faithfully, Signature & Name: S h r a d d h a ~ J sh (LicenseNo ......A... 1 rc11. ra ddh a saga..r: (B. Arc·, ) Lie. No. CA/2016/ 75!"' Agreed and Accepted by: Signature of Promoter Name: Date: 15/07/2024 Pratlksha Pravfn Mahalle Bullde11& Develope11 Amraval