FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Building/Wing wise) To, Date: 07/01/2024 Shree Gajanan Infra, Am rava ti Subject: Ce rtifi cate of Percentage of Completion of Construction Work of: Shri Guru Plaza having MahaR ERA No. P50300049083 being developed by M/s Shree Gajanan Infra as on 31/12/23 Sir, I/ we A'Wocl Tl,,atm{e have undertaken assignment as Architect/Licensed Surveyor of certifying Perce ntage o Completion of Construction work of Shri Guru Plaza having MahaRERA No. P50300049083. Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Proj ect. I certify that as on the date of this certificate, the Percentage of Work done for each of t he building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Bu ilding/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks/ Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation fOb % to 2 Basements (if any) &o 3 Number of Podiums (if any) - 4 Plinth ·go 1o Scanned with CamScanner 5 Stilt Floor 80 1o 6 slabs of super structure ~() '1b 7 1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Wi ndows to each of the (!,O Flat/Premises 8 Sanitary Fittings within the Flat/Premises. D 1o 9 Staircases, Lifts Wells and Lo bbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks - 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the 2.0 1o building. 11 Inst alla tion of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, El ectrica l fittings to Commo n Areas, electro, mechanical equipm ent, Compliance to cond itions of - environment / CRZ NOC,Finishing t o entrance lobby/s, plinth prot ection, paving of area s appurtena nt t o Building/Wing; Compound Wall and all other requirements as may be required to Obtain Occupation /Complet ion Certificate TAB LE-B comm on Areas (In ternal an d Externa l Development Works) in respect of t he Registered Phase/ Project Number Common Roads and Facilities, Amenities Proposed Percentage of Work Details S. No. (Yes/No) done 1 Internal Roads & Foothpaths f.Jo 2 Water Supply 'j~ 2-0 '10 Scanned wit h CamScanner 3 Sewerage (chamber, sewage lines), Storm Water Drains j~ \0 {<> 4 Storm Water Drains fJo - 5 Landscaping & Tree Planting 6 Street Lighting No - No - 7 Community Building ?Jo - 8 Treatment and disposal of sewage and sullage water '/Jo - 9 Solid Waste management & Disposal µ() .-- 10 Water conservation, Rain water harvesting Ye-5 1.0 7o 0D 11 Energy management 12 Fire protection and fire safety requirements JeJ \D 1o Electrical meter room, sub-station, Y~ - 13 receiving station 14 Other Yours Faithfully ~h AJ 5;'°''"" & Name (IN BLOCK LETTERS) o/ L:~~~hltect (License no ......... ...................... ) Jf.r. Jln,1al.(J3. '11iaR.,are Agreed and accepted by: COA No. CA/2GU\-l/46019 Signature of Promoter Name: SHRI GAJANAN INFRA Date: PARTNER Scanned with CamScanner