MANHOLE FREE BOARD SUMP WELL 18000 LITRES Project Details CAPACITY. JogMahajanInfraPrivateLimitedPhaseII INLET BAFFLE OUTLET Building Type - Building Development 9M Wide Road FSI AREA BALCONY TERRACE VENT Other TOTAL BUILDING FLOORS COMM. RESI. IND. SPECIAL MEZZ. PROP. PROP. LIFT LIFTWELL DUCT SHAFT Deduction FSIAREA CROSS SECTION BK.WALL P.C.C. SECTION THROUGH WATER STORAGE REQUIREMENT M.S.GATE Zone Type - Residential Zone - (R1) Signature Not Verified 9.0M WIDE ROAD U. WATER TANK. SCALE: 100 Location - Non-Congested Jog Mahajan Infra OVER HEAD WATER TANK REQUIRED P.C.C.COPING CW_HT Private Limited Phase Ground Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VENT PIPE .23 thk.BK.WALL 44 TENEMENT = 220 PERSON X 35.00 .Ltr Ward No - II MANHOLE 7700.00Ltr CW_WIDTH GL. thk.BK.WALL Plot No. - 28A,28B,29A,29B,30A,30B,31A,31B,32A,32B,33A,33B,34A,34B,35A,35B,36A,36B Digitally signed by Ashish haribhau Uikey ST_WID Jog Mahajan Infra .45 thk.STONE WALL. Private Limited Phase Basement Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 OUTLET P.C.C. STUDY Cts No./Servey No. - 38 Date: 2022.10.07 13:42:41 IST II Jog Mahajan Infra Private Limited Phase First Floor 0.00 764.42 0.00 0.00 0.00 72.72 0.00 0.00 6.34 0.00 12.26 57.08 688.74 Phase -II 4.800 4.810 Phase -I 4.800 INLET SEPTIC TANK DETAIL ST_LEN PLAN OF UNDERGROUND WATER STORAGE TANK SCALE: 100 7700.00 Ltr. X 1.50=11550.00 Ltr PROPOSED-O.H.W.T = 0.00 .Ltr UGR Prop:0.00 COMPOUND WALL DETAIL SCALE: 100 Sheet No. - 1 Zone Number: Main Office AMC Reason: Approved Drawing Plan Location: Amravati Municipal Corporation Ramp Up Ramp Down SCALE: 100 II Ward Name : Jewad Jog Mahajan Infra 4.804 Prorata Value : 0.00 Private Limited Phase Total 0.00 764.42 0.00 0.00 0.00 72.72 0.00 0.00 6.34 0.00 12.26 57.08 688.74 Rain Water II Harvesting LEGENDS: 1.20 PLOT BOUNDRY SHOWN WHITE JogMahajanPrivateLimitedPhaseI Rain Water Harvesting PROPOSED WORK SHOWN RED FSI AREA BALCONY TERRACE VENT Other TOTAL DRAINAGE LINE SHOWN YELLOW LIGHT Ramp Down BUILDING FLOORS LIFT LIFTWELL DUCT Ramp Up COMM. RESI. IND. SPECIAL MEZZ. PROP. PROP. SHAFT Deduction FSIAREA 1.20 WATER LINE SHOWN BLUE DOTTED Jog Mahajan Private Typical First To Fifth ENCLOSED BAL SHOWN BROWN 0.00 3822.10 0.00 0.00 0.00 363.60 0.00 0.00 31.70 0.00 61.30 285.40 3443.70 Limited Phase I Floor TERRACE SHOWN DARK YELLOW 7.5M W Jog Mahajan Private OPEN BAL SHOWN BRAWN Ground Floor 0.00 175.93 0.00 0.00 0.00 0.00 0.00 0.00 6.34 0.00 0.00 18.81 154.20 Limited Phase I EXSTING SHOWN BLUE HATCHED Jog Mahajan Private Basement Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Limited Phase I Jog Mahajan Private Limited Phase I Seventh Floor 0.00 131.62 0.00 0.00 0.00 9.12 0.00 0.00 0.00 0.00 0.00 0.00 131.62 4.800 Ramp Up Ramp Down ide Roa Jog Mahajan Private Sixth Floor 0.00 770.20 0.00 0.00 0.00 78.50 0.00 0.00 6.34 0.00 12.26 57.08 694.52 Limited Phase I 2.900 7F Jog Mahajan Private 3.000 3.000 Total 0.00 4899.85 0.00 0.00 0.00 451.22 0.00 0.00 44.38 0.00 73.56 361.29 4420.62 Limited Phase I d FSI DETAILS Parking Check (Table 8B) Incentive FSI for REQ. RATIO PRP. RATIO 2.900 6F Building Name USE NO.OF Tena/Area Basic FSI Premium FSI TDR green building If Ancillary Area Ancillary Area Inclusive Housing car Scooter car Scooter 9 Index Total Drawing Value (on serial no 1) (on serial no 1) (on serial no 1) Applicable 60% of (2+3+4+5) 80% of (2+3+4+5) (20%) If Applicable Jog Mahajan Infra Ramp Up Ramp Down ( on basic FSI) Private Limited Phase Residential 1 3 4 4.00 12.00 9.1 Permissible Index 1.10 0.50 0.40 0.00 0.00 0.00 2.00 0.00 0.00 II 9.2 Existing Jog Mahajan Infra Comsumed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Private Limited Phase Residential 1 5 2 1.00 5.00 2.900 5F Index II 9.3 Balance Index to Jog Mahajan Private 1.10 0.50 0.40 0.00 0.00 0.00 0.00 0.00 0.00 Residential 1 3 24 24.00 72.00 be Consume Limited Phase I 9.4 Total Permissible Jog Mahajan Private 3023.79 1374.45 1099.56 0.00 1917.37 0.00 7415.17 0.00 0.00 Residential 1 5 14 7.00 35.00 PLine Area() Limited Phase I Total - - - - 36.00 124.00 2.900 4F Ramp Down 9.5 Proposed P Line Area (Should not 3023.39 173.00 0.00 0.00 1912.97 0.00 5109.36 0.00 5109.36 Visitors parking(5%) - - - - 1.80 6.20 Ramp Up exceed 9.4 ) Total - - - - 37.80 130.20 9.6 Index Consumed 1.09 0.06 0.00 0.00 0.00 0.00 1.16 0.00 0.00 23.500 Parking Check As Per Multiplying Factor : 0.60 2.900 3F Carpet Area Table Required Proposed Enclosed Balcony Normal Balcony Building Name Status Building Name Floor Name Carpet name Tenement No Carpet Area Total Carpet Area Car/Mini Bus Scooter Car/Mini Bus Scooter Area Area Jog Mahajan Infra Total 23 78 25 79 OK Private Limited Phase First Floor 101 1 88.69 0.00 5.64 88.69 II 2F Jog Mahajan Infra 2.900 Septic Tank Carpet Area Table Private Limited Phase First Floor 102 1 67.40 0.00 0.00 67.40 II Building Name Enclosed Balcony Normal Balcony Floor Name Carpet name Tenement No Carpet Area Total Carpet Area Septic Tank Jog Mahajan Infra Area Area Private Limited Phase First Floor 103 1 88.69 0.00 5.64 88.69 Jog Mahajan Private Jog Mahajan Infra Private Limited Phase II Jog Mahajan Private Limited Phase I Sixth Floor 601 1 91.67 4.15 8.31 95.82 II Limited Phase I 2.900 1F ROAD Jog Mahajan Infra Jog Mahajan Private Sixth Floor 602 1 67.40 0.00 0.00 67.40 Private Limited Phase First Floor 104 1 88.69 0.00 5.64 88.69 Limited Phase I II Jog Mahajan Private Sixth Floor 603 1 88.69 0.00 5.64 88.69 7.5M WID Jog Mahajan Infra Limited Phase I 4.800 4.800 Private Limited Phase First Floor 105 1 67.40 0.00 0.00 67.40 Jog Mahajan Private N E II Sixth Floor 604 1 88.69 0.00 5.64 88.69 Limited Phase I Jog Mahajan Infra Jog Mahajan Private 2.900 0F Private Limited Phase First Floor 106 1 88.69 0.00 5.64 88.69 Sixth Floor 605 1 67.40 0.00 0.00 67.40 Limited Phase I II 7.5M WIDE ROAD Jog Mahajan Private Sixth Floor 606 1 91.67 4.15 8.31 95.82 0.300 Limited Phase I G.I. OF Plinth Jog Mahajan Private Limited Phase I Jog Mahajan Private Seventh Floor Seventh Floor 606 601 1 1 55.03 55.03 0.00 0.00 0.00 0.00 55.03 55.03 7.5M Wide Road -2.60 -1F Limited Phase I Jog Mahajan Private Typical First To Fifth 101;201;301;401;501 5 88.69 0.00 5.64 88.69 Limited Phase I Floor Jog Mahajan Private Typical First To Fifth 102; 202;302; SECTION VIEW - Jog Mahajan Private Limited Phase I Limited Phase I Floor 402;502 5 67.40 0.00 0.00 67.40 FRONT ELEVATION Jog Mahajan Private Limited Phase I Jog Mahajan Private Typical First To Fifth Floor Typical First To Fifth 103;203;303;403;503 5 88.69 0.00 5.64 88.69 Phase -I 104;204;304;404;504 5 88.69 0.00 5.64 88.69 WATER TANK MANHOLE Limited Phase I Floor SCHEDULE OF OPENING: SCHEDULE OF OPENING: Jog Mahajan Private Typical First To Fifth 105;205;305;405;505 5 67.40 0.00 0.00 67.40 BLD NAME NAME LENGTH HEIGHT NOS. Limited Phase I Floor BLD NAME NAME LENGTH HEIGHT NOS. Jog Mahajan Private Typical First To Fifth Jog Mahajan Private Jog Mahajan Private Balcony Balcony 106; 206;306;406;506 5 88.69 0.00 5.64 88.69 W5 2.40 1.20 2 SD2 2.05 2.10 2 Limited Phase I Floor Limited Phase I Limited Phase I BAL BAL D3 W2 W2 D3 Jog Mahajan Private Jog Mahajan Private W2 1.50 1.20 2 D2 0.90 2.10 4 TERRACE FLOOR Limited Phase I Limited Phase I Jog Mahajan Private Jog Mahajan Private Terrace Terrace w 1.30 1.20 16 OP 1.20 2.10 12 Staircase Limited Phase I Limited Phase I 2.900 M Bedroom 3 M Bedroom 3 Jog Mahajan Private Jog Mahajan Private 3.51X4.17 3.51X4.17 W3 1.50 1.20 4 D1 1.20 2.10 12 (14.59 Sq.m) (14.59 Sq.m) Limited Phase I Limited Phase I Bedroom Bedroom Jog Mahajan Private Jog Mahajan Private OP 1.17 2.10 8 D2 DN UP UP DN D2 Toilet Toilet W2 1.65 1.20 2 Limited Phase I Living/Dining Living/Dining SEVENTH FLOOR Limited Phase I Passage Below Below Passage SUNK SUNK Lift Jog Mahajan Private Jog Mahajan Private D2 D2 Phase -II W2 1.47 1.20 2 Limited Phase I SD2 1.50 2.10 6 D3 D2 D3 D3 D2 Limited Phase I 2.900 606 Jog Mahajan Private Jog Mahajan Private TOILET TOILET D3 601 TOILET TOILET Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Balcony V1 0.59 1.20 2 D2 1.00 2.10 46 1.86X1.95 1.86X1.95 Store Store 1.86X1.95 1.86X1.95 Enclosed Balcony Enclosed Balcony Limited Phase I Limited Phase I Toilet Bedroom 2.48X2.25 Store 2.48X2.25 Store Bedroom Toilet ToiletSq.m) A (3.62 Sq.m) Toilet (3.62 Sq.m) (3.62 Sq.m) (3.62 M Bedroom 4 (4.22 Sq.m) (4.22 Sq.m) M Bedroom 4 Jog Mahajan Private Jog Mahajan Private Kitchen/Dining Living Lobby Passage Passage Lobby Living Toilet Toilet V1 0.60 1.20 36 D3 0.90 2.10 36 V1 3.48X3.57 3.48X3.57 V1 SIXTH FLOOR Limited Phase I Limited Phase I V1 (12.42 Sq.m) Duct Lobby Duct (12.42 Sq.m) V1 Kitchen Dining Dining Kitchen V1 V1 SUNK SUNK Jog Mahajan Private Jog Mahajan Private Terrace Terrace W2 1.80 1.20 14 D3 6.00 2.10 6 Limited Phase I Limited Phase I DN 2.900 Jog Mahajan Private Jog Mahajan Private W2 W2 W4 1.20 1.20 4 SD1 2.70 2.10 8 Limited Phase I Limited Phase I Void f f Bedroom Bedroom Bedroom Bedroom Jog Mahajan Private Jog Mahajan Infra Kitchen/Dining Living Lobby Passage Passage Lobby Living Toilet Toilet UP Double Ht. Double Ht. UP DN UP Double ht. Double ht. UP DN W1 1.47 1.20 6 Private Limited Phase OP 1.17 2.10 4 FIFTH FLOOR Passage Living/Dining Living/Dining Passage Passage Living/Dining Living/Dining Passage Limited Phase I A SUNK SUNK Lift Lift Jog Mahajan Private II W3 1.47 1.20 8 Jog Mahajan Infra Limited Phase I 2.900 Jog Mahajan Infra Private Limited Phase SD1 2.70 2.10 4 Private Limited Phase W3 1.47 1.20 4 II Toilet Toilet Bedroom Bedroom Toilet Toilet Toilet Bedroom Bedroom Toilet C.Toilet C.Toilet Store Store Void Toilet Toilet II Jog Mahajan Infra Kitchen/Dining Living Lobby Passage Passage Lobby Living Toilet Toilet Garbage Garbage Private Limited Phase SD2 1.50 2.10 4 23.500 FOURTH FLOOR 1.800 Chute Chute Duct Lobby Duct Duct Lobby Duct Jog Mahajan Infra Lobby Lobby Private Limited Phase W3 1.50 1.20 2 II SUNK SUNK Terrace DN UP DN UP II Jog Mahajan Infra Terrace Private Limited Phase D1 1.20 2.10 6 2.900 Jog Mahajan Infra Vent shaft Vent shaft Private Limited Phase W4 1.20 1.20 2 II Void Void II Jog Mahajan Infra Kitchen/Dining Living Lobby Passage Passage Lobby Living Toilet Toilet Jog Mahajan Infra Private Limited Phase D2 0.90 2.10 2 THIRD FLOOR Private Limited Phase W2 1.80 1.20 8 II SUNK SUNK Dry Balcony Kitchen/Dining Kitchen/Dining Dry Balcony II Jog Mahajan Infra Void Lobby Living Living Jog Mahajan Infra Private Limited Phase D3 0.90 2.10 16 2.900 Lobby Private Limited Phase V1 0.60 1.20 16 II DN 1.500 1.500 II Jog Mahajan Infra Void Void Kitchen/Dining Living Lobby Passage Passage Lobby Living C.Toilet C.Toilet Jog Mahajan Infra Private Limited Phase D2 22.00 2.10 22 Toilet Toilet Garbage Chute Lobby Lobby Garbage Chute Garbage Chute Lobby Lobby Garbage Chute II Duct Lobby Duct SECOND FLOOR Toilet Toilet Private Limited Phase w 1.30 1.20 12 SUNK SUNK Terrace II Jog Mahajan Infra Terrace Jog Mahajan Infra Private Limited Phase OP 1.20 2.10 6 2.900 Bedroom Vent shaft Vent shaft Bedroom Vent shaft Vent shaft Private Limited Phase W1 1.47 1.20 4 II Bedroom Bedroom II Staircase Balcony Balcony Kitchen/Dining Living Lobby Passage Passage Lobby Living Toilet Toilet Lift Terrace Terrace FIRST FLOOR SUNK SUNK Void Void 0.3002.900 UP DN UP DN Parking Parking Duct Lobby Duct Duct Lobby Duct GROUND FLOOR GL C.Toilet C.Toilet Toilet Toilet Toilet Bedroom Bedroom Toilet Staircase 2.900 Parking Parking Lift Lift Passage Living/Dining Living/Dining Passage BASEMENT FLOOR Terrace Terrace Bedroom Bedroom Kitchen Kitchen Seventh Floor SECTION Bedroom Bedroom 7th FLOOR PLAN 3.805 0.115 2.55 0.115 2.55 3.805 4.315 4.315 Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony 1F 3.115 2.900 3.115 5.63 7.73 3.93 7.73 5.63 3.93 6th FLOOR PLAN 7th FLOOR PLAN 1.32 1.2 1.1 1.1 1.2 1.32 6.100 0F 2.900 4.02 1.62 1.5 1.5 1.62 4.02 3.78 3.78 W5 W5 0.300 BUILT-UP AREA CALCULATION Seventh Floor Jog Mahajan Private Limited Phase I BUILT-UP AREA CALCULATION Seventh Floor Jog Mahajan Private Limited Phase I G.I. OF Plinth Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Enclosed Balcony BAL BAL Enclosed Balcony BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION D2 W2 BAL WARDROBE W1 SD2 SD1 BAL BAL SD1 SD2 W1 WARDROBE BAL W2 D2 D3 BAL W2 D3 ENCL BAL SD2 SD1 SD1 SD2 ENCL BAL D3 BALW2 D3 FOR Seventh Floor Jog Mahajan Private Limited Phase I AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME FOR Seventh Floor Jog Mahajan Private Limited Phase I LENGTH WIDTH Area(Sq.M) BLOCK 10.40 9.35 65.81 BLOCK 10.40 9.35 65.81 BLOCK AREA TOTAL =65.81Sq.M BLOCK AREA TOTAL =65.81Sq.M -2.60 -1F Kitchen Kitchen TOTAL Deduction =0.00Sq.M TOTAL Deduction =0.00Sq.M Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Dining Net BuiltUp Area =65.81 Sq.M Net BuiltUp Area =65.81 Sq.M Bedroom Bedroom KITCHEN Dining KITCHEN 3.35X3.60 Bedroom Bedroom 3.35X3.60 4.52X4.20 4.52X4.20 BAL WARDROBE D2 W2 W1 SD2 SD1BAL BAL SD1 SD2 W1 WARDROBE BAL W2 D2 M Bedroom 1 (11.08 Sq.m) KITCHEN KITCHEN (11.08 Sq.m) M Bedroom 1 M Bedroom 1 (17.56 Sq.m) (17.56 Sq.m) M Bedroom 1 3.51X4.17 3.05X4.17 3.05X4.17 3.51X4.17 3.51X4.16 3.51X4.16 (14.59 Sq.m) (12.70 Sq.m) (12.70 Sq.m) (14.59 Sq.m) Kitchen Living 4.60X5.33 Living 4.60X5.33 Kitchen (14.59 Sq.m) Living 4.60X5.33 Living 4.60X5.33 (14.59 Sq.m) SECTION VIEW - Jog Mahajan Infra Private Limited Phase II Bedroom Bedroom Bedroom Bedroom Bedroom D2 (19.81 Sq.m) (19.81 Sq.m) D2 UP (19.81 Sq.m) Double Ht. (19.81 Sq.m) Double Ht. UP Bedroom 3.35X3.60 Bedroom Bedroom 3.35X3.60 Bedroom Bedroom Lift Well Passage Living/Dining Living/Dining Passage Passage Living/Dining Living/Dining (11.08 Sq.m) (11.08 Sq.m) Lift Well M Bedroom 1 3.51X4.17 KITCHEN 3.05X4.17 KITCHEN 3.05X4.17 M Bedroom 1 3.51X4.17 D2 Lift 1.80X1.76 D2 D2 1.80X1.77 Lift (3.17 Sq.m) Passage D2 3.77 1.2 6.93 6.93 0.6 3.77 Proforma I : Area Statement (14.59 Sq.m) (12.70 Sq.m) Living Living (12.70 Sq.m) (14.59 Sq.m) D3 D2 D3 OP (3.17 Sq.m) OP D3 D2 D3 D3 D2 D3 OP OP D3 D2 D3 1.88 0.6 1.88 14.05 14.05 Bedroom Kitchen 4.60X5.33 4.60X5.33 Kitchen Bedroom Bedroom Kitchen Kitchen Bedroom 1.47 1.47 1. Area of plot (Minimum area of a, b, c to be D2 (19.81 Sq.m) (19.81 Sq.m) D2 0.6 considered) or area of subplot with sanctioned layout No. 2748.90 606 TOILET TOILET D3 106,206,306,406,506 101,201,301,401,501 D3 1.86X1.95 TOILET TOILET TOILET TOILET D3 601 D3 TOILET TOILET 4.165 Passage Living/Dining Lift Well Living/Dining Passage Passage Living/Dining Living/Dining Passage 1.86X1.95 Toilet 1.86X1.95 Toilet TOILET D1 D1 TOILET Toilet 1.86X1.95 Toilet A Toilet Toilet TOILET D1 D1 TOILET A 0.6 1.2 4.165 4.165 (3.62 Sq.m) (3.62 Sq.m) Bedroom C.Toilet C.Toilet Bedroom (3.62 Sq.m) (3.62 Sq.m) 1.86X1.95 1.86X1.95 Bedroom C.Toilet Bedroom 1.86X1.95 1.86X1.95 Lift Lift 1.35X2.25 1.35X2.25 1.35X2.25 1.35X2.25 4.165 and subplot No. 1.80X1.76 (3.62 Sq.m) (3.62 Sq.m) (3.62 Sq.m) (3.62 Sq.m) D3 D2 D2 D3 OP (3.17 Sq.m) OP D3 D2 D2 D3 M Bedroom 2 (3.03 Sq.m) (3.03 Sq.m) M Bedroom 2 M Bedroom 2 (3.03 Sq.m) (3.03 Sq.m) M Bedroom 2 Toilet Toilet 7.73 7.73 V1 V1 3.48X3.57 3.48X3.57 V1 V1 V1 V1 3.48X3.57 C.Toilet 3.48X3.57 V1 V1 1.8 7.73 7.73 (12.42 Sq.m) Duct Duct (12.42 Sq.m) Duct 1.8 106 101 V1 Vent Shaft Lobby Vent Shaft V1 (12.42 Sq.m) V1 Vent Shaft Lobby Duct Vent Shaft V1 (12.42 Sq.m) (a) As per ownership document (7/12, CTS extract) 2748.90 TOILET 1.86X1.95 TOILET 1.86X1.95 D3 D3 1.86X1.95 TOILET TOILET 1.86X1.95 3.35X2.37 3.35X2.37 3.35X2.37 3.35X2.37 LiftWell2 Toilet (3.62 Sq.m) Toilet (3.62 Sq.m) Bedroom TOILET C.Toilet 1.35X2.25 D1 D1 TOILET C.Toilet 1.35X2.25 Bedroom Toilet (3.62 Sq.m) Toilet (3.62 Sq.m) Toilet Toilet Bedroom C.Toilet C.Toilet Bedroom Toilet Toilet (6.13 Sq.m) UP DN (6.13 Sq.m) (6.13 Sq.m) UP DN (6.13 Sq.m) LiftWell6 (b) as per TILR or City Survey measurement sheet 2748.90 1.47 M Bedroom 2 (3.03 Sq.m) (3.03 Sq.m) M Bedroom 2 W3 W3 W3 W3 V1 V1 3.48X3.57 (12.42 Sq.m) Duct Lobby Duct 3.48X3.57 (12.42 Sq.m) V1 V1 Duct Lobby Duct Void Void 1.47 (c) as per Demarcated drawing area 2748.90 V1 Vent Shaft Vent Shaft V1 0.90X1.90 Void 0.90X1.90 Void 4.02 Vent.Shaft1 Vent.Shaft2 4.02 (1.71 Sq.m) (1.71 Sq.m) 5.025 5.025 3.35X2.37 (6.13 Sq.m) UP DN 3.35X2.37 (6.13 Sq.m) DN UP 4.02 5.025 Vent.Shaft3 Vent.Shaft4 4.02 5.025 LESS 1.47 A KITCHEN Living W3 W3 Living KITCHEN A KITCHEN Living W3 W3 Living KITCHEN Void3 2.Area not in possession W3 W3 W4 Dry Balcony Kitchen/Dining 3.93X3.20 5.04X3.20 D1 D1 5.04X3.20 3.93X3.20 W4 Dry Balcony W4 Dry Balcony Kitchen/Dining 3.93X3.20 5.04X3.20 D1 D1 5.04X3.20 Kitchen/Dining 3.93X3.20 W4 Dry Balcony Void13 1.47 0.00 Void (12.57 Sq.m) (16.11 Sq.m) (16.11 Sq.m) (12.57 Sq.m) (12.57 Sq.m) (16.11 Sq.m) (16.11 Sq.m) (12.57 Sq.m) 3.5 3.5 3.5 3.5 1.35 3. Entire area (1-2) Lobby Lobby Lobby 0.90X1.90 Void (1.71 Sq.m) Void Living Lobby 1.52X1.50 Lobby 1.52X1.50 Living Kitchen/Dining Living 605 Lobby Lobby 1.52X1.50 Lobby 1.52X1.50 602 Living 1.35 2748.90 OP 105,205,305,405,505 (2.28 Sq.m) W W (2.28 Sq.m) 102,202,302,402,502 OP OP (2.28 Sq.m) W W (2.28 Sq.m) OP KITCHEN Living W3 W3 Living KITCHEN D2 OP OP OP OP D2 D2 OP OP OP OP D2 1.235 1.2 Void4 1.235 1.2 1.235 1.2 1.235 1.2 4.Deductions for - W4 Dry Balcony Kitchen/Dining 3.93X3.20 5.04X3.20 D1 D1 5.04X3.20 3.93X3.20 W4 Dry Balcony Dry Balcony Kitchen/Dining Kitchen/Dining Dry Balcony BAL Void C.Toilet BAL BAL Void BAL Void14 (12.57 Sq.m) (16.11 Sq.m) (16.11 Sq.m) (12.57 Sq.m) V1 TOILET C.Toilet V1 Garbage Void Garbage V1 TOILET Toilet TOILET V1 V1 TOILET C.Toilet V1 Garbage Void Garbage V1 C.Toilet TOILET V1 1.35 (a) Proposed D.P./ D.P. Road widening Area /Service 1.35 Lobby Lobby Lobby Lobby Living 105 Lobby Lobby Living Kitchen/Dining Living Living 2.40X1.35 Toilet D3 TOILET 2.30X1.35 Chute Lobby 4.20X2.04 Lobby Chute 2.30X1.35 D3 2.40X1.35 2.40X1.35 Toilet D3 TOILET 2.30X1.35 Chute Lobby 4.20X2.04 Lobby Chute TOILET 2.30X1.35 D3 2.40X1.35 Toilet 3.55 3.55 0.00 1.52X1.50 1.52X1.50 102 (3.24 Sq.m) (8.56 Sq.m) (3.24 Sq.m) (3.24 Sq.m) (8.56 Sq.m) (3.24 Sq.m) 3.55 3.55Road / Highway widening 1.47 OP OP (3.10 Sq.m) (3.10 Sq.m) (3.10 Sq.m) (3.10 Sq.m) 1.47 (2.28 Sq.m) (2.28 Sq.m) D2 OP W W OP D2 D3 D2 D2 D2 D2 D3 D3 D2 D2 D2 D2 D3 BAL OP OP BAL W W W W Void5 Void10 (b) Any D.P. Reservation area 0.00 Void C.Toilet Toilet Void 4.99 Void1 Void2 4.99 Void12 Void11 V1 TOILET C.Toilet V1 Garbage Void Garbage V1 TOILET TOILET V1 C.Toilet Garbage Garbage C.Toilet Bedroom Vent shaft Vent shaft Bedroom Bedroom Vent shaft Vent shaft Bedroom 4.02 4.02 2.40X1.35 Toilet D3 TOILET Chute Lobby 4.20X2.04 Lobby Chute D3 2.40X1.35 Toilet Chute Lobby Lobby Chute Toilet D2 Bedroom Bedroom D2 D2 Bedroom Bedroom D2 4.99 4.02 4.99 4.02 (Total a+b) 0.00 2.30X1.35 2.30X1.35 Void Void Void Void (3.24 Sq.m) (8.56 Sq.m) (3.24 Sq.m) 1.47 (3.10 Sq.m) (3.10 Sq.m) M Bedroom Bedroom Bedroom M Bedroom M Bedroom Bedroom Bedroom M Bedroom 1.47 Balcony 3.35X7.27 3.35X7.27 Balcony Balcony 3.35X7.27 3.35X7.27 Balcony D3 D2 D2 D2 D2 D3 3.66X3.25 (11.87 Sq.m) 3.50X3.25 (11.37 Sq.m) (22.55 Sq.m) (22.55 Sq.m) 3.50X3.25 (11.37 Sq.m) 3.66X3.25 (11.87 Sq.m) 3.66X3.25 (11.87 Sq.m) 3.50X3.25 (11.37 Sq.m) (22.55 Sq.m) (22.55 Sq.m) 3.50X3.25 (11.37 Sq.m) 3.66X3.25 (11.87 Sq.m) 5.Balance area of plot (3-4) 2748.90 W W W2 W2 W2 W2 LiftWell1 6. Amenity Space D2 Bedroom Bedroom Vent shaft Vent shaft Bedroom Bedroom D2 Bedroom Bedroom Vent shaft Vent shaft Bedroom Bedroom Void Void LiftWell5 0.00 7.73 7.73 W2 0.90X1.90 Void W2 W2 0.90X1.90 Void W2 7.73 7.73 Void Void Balcony M Bedroom 3.66X3.25 Bedroom 3.50X3.25 3.35X7.27 3.35X7.27 Bedroom 3.50X3.25 M Bedroom 3.66X3.25 Balcony Balcony Balcony BAL (1.71 Sq.m) BAL BAL (1.71 Sq.m) BAL 1.8 1.8 (Applicable if (1) > 20000 sqmt - (11.87 Sq.m) (11.37 Sq.m) (22.55 Sq.m) (22.55 Sq.m) (11.37 Sq.m) (11.87 Sq.m) W3 W3 W3 W3 4.165 1.2 4.165 0.6 4.165 (Required -(a) Upto 20000 sqmt - Nil - W2 W2 UP DN 0.6 1.2 4.165 0.6 Void UP DN 0.6 W2 0.90X1.90 Void W2 Void V1 V1 V1 V1 1.47 1.47 1.47 1.47 (b) Above 20000 sqmt - (a) + 5 % of Total area 0.00 (1.71 Sq.m) V1 M Bedroom 2 Lobby Duct M Bedroom 2 V1 V1 M Bedroom 2 Duct Lobby Duct M Bedroom 2 V1 1.88 0.6 1.88 BAL BAL V1 3.48X3.57 Duct 3.48X3.57 V1 V1 3.48X3.57 3.48X3.57 V1 3.77 0.6 6.93 6.93 1.2 3.77 1.88 0.6 1.88 W3 W3 TOILET TOILET (12.42 Sq.m) TOILET 1.35X2.25 C.Toilet TOILET 1.35X2.25 C.Toilet (12.42 Sq.m) TOILET TOILET TOILET TOILET (12.42 Sq.m) TOILET 1.35X2.25 C.Toilet TOILET 1.35X2.25 C.Toilet (12.42 Sq.m) TOILET TOILET Toilet 3.77 0.6 6.93 6.93 1.2 3.77 7. Net Plot Area (5-6 ) 2748.90 UP DN UP DN Toilet 1.86X1.95 Toilet 1.86X1.95 Bedroom (3.03 Sq.m) D1 D1 (3.03 Sq.m) Bedroom Toilet 1.86X1.95 Toilet 1.86X1.95 Toilet 1.86X1.95 Toilet 1.86X1.95 Bedroom (3.03 Sq.m) D1 D1 (3.03 Sq.m) Bedroom Toilet 1.86X1.95 1.86X1.95 BUILT-UP AREA CALCULATION Typical First To Fifth Floor Jog Mahajan Private Limited Phase I BUILT-UP AREA CALCULATION Sixth Floor Jog Mahajan Private Limited Phase I (3.62 Sq.m) (3.62 Sq.m) D3 104,204,304,404,504 103,203,303,403,503 D3 (3.62 Sq.m) (3.62 Sq.m) (3.62 Sq.m) D3 (3.62 Sq.m) 604 603 D3 (3.62 Sq.m) (3.62 Sq.m) 8. Recreational Open Space - M Bedroom 2 V1 Lobby V1 M Bedroom 2 Lobby BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION V1 V1 3.48X3.57 Duct Duct 3.48X3.57 V1 V1 Duct Duct FOR Typical First To Fifth Floor Jog Mahajan Private Limited Phase I FOR Sixth Floor Jog Mahajan Private Limited Phase I (a) If area (6) is more than 4000 sqmt - 10 % of (6) is D3 D2 D3 OP Lift Well OP D3 D2 D3 D3 D2 D3 OP Lift Well OP D3 D2 D3 (12.42 Sq.m) TOILET TOILET (12.42 Sq.m) D2 D2 D2 D2 AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME LENGTH WIDTH Area(Sq.M) 0.00 TOILET Toilet 1.86X1.95 TOILET Toilet 1.86X1.95 Bedroom 1.35X2.25 C.Toilet (3.03 Sq.m) D1 D1 1.35X2.25 C.Toilet (3.03 Sq.m) Bedroom TOILET Toilet 1.86X1.95 TOILET Toilet 1.86X1.95 Toilet Toilet Bedroom C.Toilet C.Toilet Bedroom Toilet Toilet Passage Living/Dining 1.80X1.77 Lift" Living/Dining Passage Passage Living/Dining 1.80X1.77 Lift Living/Dining Passage BLOCK 31.91 26.80 BLOCK AREA TOTAL =764.42Sq.M 764.42 BLOCK 31.91 26.80 BLOCK AREA TOTAL =770.20Sq.M 770.20 required. (3.62 Sq.m) (3.62 Sq.m) D3 104 103 D3 (3.62 Sq.m) (3.62 Sq.m) (3.17 Sq.m) (3.17 Sq.m) Void5 - - 1.71 Void14 - - 8.56 Bedroom D2 Kitchen Living 4.60X5.33 Living 4.60X5.33 Kitchen D2 Bedroom Bedroom D2 Kitchen Living 4.60X5.33 Living 4.60X5.33 Kitchen D2 Bedroom Void4 Void3 - - - - 8.56 1.71 Void13 Void12 - - - - 1.71 22.55 Proposed___ 0.00 (19.81 Sq.m) (19.81 Sq.m) (19.81 Sq.m) (19.81 Sq.m) D3 D2 D2 D3 OP Lift Well OP D3 D2 D2 D3 M Bedroom 1 3.51X4.17 KITCHEN 3.05X4.17 KITCHEN 3.05X4.17 M Bedroom 1 3.51X4.17 M Bedroom 1 3.51X4.17 KITCHEN 3.05X4.17 KITCHEN 3.05X4.17 M Bedroom 1 3.51X4.17 Void2 Void1 - - - - 22.55 22.55 Void11 Void10 - - - - 22.55 1.71 (b) If area is less than 4000 sqmt -Check - - Lift" 1.80X1.77 Lift" (14.59 Sq.m) (12.70 Sq.m) (12.70 Sq.m) (14.59 Sq.m) (14.59 Sq.m) (12.70 Sq.m) (12.70 Sq.m) (14.59 Sq.m) Vent.Shaft4 - - 6.13 Passage Passage Passage Passage Bedroom Bedroom Bedroom Bedroom Vent.Shaft2 - - 6.13 Living/Dining Living/Dining Living/Dining Living/Dining (3.17 Sq.m) 3.35X3.60 Bedroom (11.08 Sq.m) Bedroom 3.35X3.60 (11.08 Sq.m) 3.35X3.60 Bedroom (11.08 Sq.m) Bedroom 3.35X3.60 (11.08 Sq.m) Vent.Shaft1 - - 6.13 Vent.Shaft3 - - 6.13 i) If it is full number like 1,2,125,419,etc. As per 7.12 Bedroom D2 Living Living D2 Bedroom Bedroom Bedroom LiftWell2 - - 3.17 LiftWell6 - - 3.17 M Bedroom 1 Kitchen KITCHEN 4.60X5.33 (19.81 Sq.m) 4.60X5.33 (19.81 Sq.m) Kitchen KITCHEN M Bedroom 1 Kitchen Kitchen LiftWell1 - - 3.17 TOTAL Deduction =75.68Sq.M LiftWell5 - - 3.17 TOTAL Deduction =75.68Sq.M Net BuiltUp Area =694.52 Sq.M abstract or City Survey Number - No Recreational open - Net BuiltUp Area =688.74 Sq.M 3.51X4.17 3.05X4.17 3.05X4.17 3.51X4.17 (14.59 Sq.m) Bedroom (12.70 Sq.m) (12.70 Sq.m) Bedroom (14.59 Sq.m) D2 W2 W1 SD2 SD1BAL SD1 SD2 W1 W2 D2 D2 W2BAL W1 SD2 SD1 SD1 SD2 W1 W2 D2 4.4 4.4 space is required 3.35X3.60 Bedroom Bedroom 3.35X3.60 Bedroom Bedroom BAL WARDROBE BAL WARDROBE BAL WARDROBE BAL BAL WARDROBE BAL (11.08 Sq.m) (11.08 Sq.m) Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 etc.then recreational open space is required. - 5.25 Void6 5.25 5.25 Void7 5.25 2.1 2.1 D2 W2 W1 SD2 SD1BAL SD1 SD2 W1 W2 D2 (A) 10 % Subject to minimum 200 sqmt 0.00 2.065 2.065 BAL WARDROBE BAL WARDROBE BAL Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Balcony Dry Balcony Balcony Typical First To Fifth Floor 2.065 LiftWell3 2.065 LiftWell4 Proposed ______________ 0.00 Sixth Floor 4.4 4.4 2.1 2.1 (B) Exemption to leave open space subject to availing BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Private Limited Phase I BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Private Limited Phase I BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Private Limited Phase I - TYPICAL 1st To 5th FLOOR PLAN BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Private Limited Phase I basic F.S.I of 75 % 6th FLOOR PLAN BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION First Floor FOR Ground Floor Jog Mahajan Private Limited Phase I FOR Ground Floor Jog Mahajan Private Limited Phase I FOR Ground Floor Jog Mahajan Private Limited Phase I FOR Ground Floor Jog Mahajan Private Limited Phase I AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME LENGTH WIDTH Area(Sq.M) (C) Exemption to leave open space subject to payment First Floor Plan TYPICAL 2nd To 5th FLOOR PLAN BLOCK Void6 5.25 - 4.40 - 23.10 BLOCK AREA TOTAL =23.10Sq.M 1.71 TOTAL Deduction =1.71Sq.M BLOCK Void7 5.25 - 4.40 - 23.10 BLOCK AREA TOTAL =23.10Sq.M 1.71 TOTAL Deduction =1.71Sq.M BLOCK LiftWell3 2.10 - 2.06 - 4.33 BLOCK AREA TOTAL =4.33Sq.M 3.17 TOTAL Deduction =3.17Sq.M BLOCK LiftWell4 2.10 - 2.06 - BLOCK AREA TOTAL =4.33Sq.M 4.33 3.17 TOTAL Deduction =3.17Sq.M of 10 % land value of land at (7) as per annual - Net BuiltUp Area =21.39 Sq.M Net BuiltUp Area =21.39 Sq.M Net BuiltUp Area =1.16 Sq.M Net BuiltUp Area =1.16 Sq.M statement of rate. 4.4 4.4 Certificate of Area: 3.77 1.2 6.93 6.93 0.6 3.77 Certified that the plot under reference was surveyed by me on 0.6 1.88 1.88 5.25 5.25 5.25 5.25 1.47 1.47 Void8 Void9 2022-09-10 and the dimensions of sides etc. of plot stated onplan 0.6 4.165 0.6 1.2 are as measured on site and the area so worked out tallies with the 4.165 4.4 area stated in document of Ownership/ T.P. Scheme Records/Land 7.73 7.73 1.8 4.4 CP BUILT-UP AREA CALCULATION Basement Floor Jog Mahajan Private Limited Phase I BUILT-UP AREA CALCULATION Basement Floor Jog Mahajan Private Limited Phase I Records Department/City Survey records. CP Room 1 Room 2 BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION CP LiftWell4 3.51X3.00 3.35X3.00 FOR Basement Floor Jog Mahajan Private Limited Phase I FOR Basement Floor Jog Mahajan Private Limited Phase I (10.51 Sq.m) (10.05 Sq.m) AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME LENGTH WIDTH Area(Sq.M) Signature 1.47 Room - 1 Room - 2 BLOCK 5.25 4.40 23.10 BLOCK 5.25 4.40 23.10 CP CP 2.000 CP CP CP CP BLOCK AREA TOTAL =23.10Sq.M BLOCK AREA TOTAL =23.10Sq.M (Name of Architect/ Licensed Engineer/ Supervisor.) Void8 - - 1.71 Void9 - - 1.71 4.02 5.025 Vent.Shaft1 Vent.Shaft2 4.02 5.025 TOTAL Deduction =1.71Sq.M TOTAL Deduction =1.71Sq.M Owner's Declaration - Lift 1.80X1.77 CP TOILET Net BuiltUp Area =21.39 Sq.M Net BuiltUp Area =21.39 Sq.M Lift CP 2.10X1.20 SP Lift Well 1.80X1.77 (3.17 Sq.m) Lift Well 1.80X1.77 (3.17 Sq.m) (2.52 Sq.m) Toilet 1.80X1.77 (3.17 Sq.m) Void7 1.47 2.1 2.1 I/We undersigned hereby confirm that I/We would abide by plans (3.17 Sq.m) UP Lift UP 3.5 3.5 Lift 1.35 approved by Authority / Collector. I/We would execute the structure 2.065 2.065 SP 2.065 2.065 UP Lift UP Lift A A as per approved plans. Also I/We would execute the work under SP 1.235 1.2 Void8 1.235 1.2 2.1 2.1 supervision of proper technical person so as to ensure the quality CP Lobby BUILT-UP AREA CALCULATION Basement Floor Jog Mahajan Private Limited Phase I Lobby BUILT-UP AREA CALCULATION Basement Floor Jog Mahajan Private Limited Phase I 1.35 Lobby Lobby CP BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION and safety at the work site. SP 3.55 3.55 FOR Basement Floor Jog Mahajan Private Limited Phase I FOR Basement Floor Jog Mahajan Private Limited Phase I AREA NAME LENGTH WIDTH Area(Sq.M) 1.47 AREA NAME LENGTH WIDTH Area(Sq.M) UP BLOCK 2.10 2.06 4.33 BLOCK 2.10 2.06 4.33 UP SP SP SP SP UP UP BLOCK AREA TOTAL =4.33Sq.M Void9 BLOCK AREA TOTAL =4.33Sq.M Void 4.99 4.02 Void5 Void6 4.99 4.02 TOTAL Deduction =0.00Sq.M TOTAL Deduction =0.00Sq.M Net BuiltUp Area =4.33 Sq.M Owner (s) name and signature SP Void Net BuiltUp Area =4.33 Sq.M Void Void 0.90X1.90 0.90X1.90 Void 0.90X1.90 Void 0.90X1.90 Void CP (1.71 Sq.m) CP (1.71 Sq.m) SP SP SP SP Architect/ Licensed Engineer/ Supervisor name and signature CP 1.47 (1.71 Sq.m) (1.71 Sq.m) Void 7.8 A CP A SP Job No. 2.750 2.000 SP SP SP SP LiftWell3 SP 7.73 1.8 7.73 W W W W SP SP SP SP W W W W 2.000 4.165 1.2 4.165 0.6 CP SP 0.6 TW 27 TW 26 12.085 12.085 CP 2.040 SP SP SP SP 1.47 1.47 Name Of : Owner Jog Mahajan Infra Private Limited Tarfe Sanchalak Ram 0.6 Community Hall 1.88 1.88 7.235 TW 28 TW 25 SP 3.77 0.6 6.93 6.93 1.2 3.77 Madhukar Mahajan W W W W W W SP SP SP SP 3.265 W W Hall BUILT-UP AREA CALCULATION First Floor Jog Mahajan Infra Private Limited Phase II 7.50X11.79 SP 4.615 Postal Address : ,,,,amravati,Amravati-444607,Maharashtra SP SP SP SP BUILT UP AREA CALCULATION SP SP SP SP SP SP 4.150 CP (88.38 Sq.m) FOR First Floor Jog Mahajan Infra Private Limited Phase II AREA NAME LENGTH WIDTH Area(Sq.M) 4.87 CP CP SP BLOCK 31.91 26.80 764.42 1.35 Void BLOCK AREA TOTAL =764.42Sq.M 2.365 Void Void 0.90X1.90 Void SP SP SP SP Void9 - - 1.71 7.8 0.90X1.90 Void BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Private Limited Phase I Void 0.90X1.90 (1.71 Sq.m) Void 0.90X1.90 (1.71 Sq.m) (1.71 Sq.m) Void SP (1.71 Sq.m) Void8 Void7 - - - - 8.56 1.71 BUILT UP AREA CALCULATION BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Private Limited Phase I BUILT UP AREA CALCULATION Phone No.:9422915928 FOR Ground Floor Jog Mahajan Private Limited Phase I Void6 - - 22.55 FOR Ground Floor Jog Mahajan Private Limited Phase I UP SP SP SP SP Void5 - - 22.55 AREA NAME BLOCK LENGTH 7.24 WIDTH 4.62 Area(Sq.M) 26.81 AREA NAME LENGTH WIDTH Area(Sq.M) DESCRIPTION OF PROJECT : UP Vent.Shaft2 - - 6.13 BLOCK 12.08 7.80 94.26 CP UP UP SP BLOCK AREA TOTAL =26.81Sq.M Vent.Shaft1 - - 6.13 BLOCK AREA TOTAL =94.26Sq.M Lobby LiftWell4 LiftWell3 - - - - 3.17 3.17 TOTAL Deduction =0.00Sq.M Net BuiltUp Area =26.81 Sq.M TOTAL Deduction =0.00Sq.M Net BuiltUp Area =94.26 Sq.M Type of Proposal : Residential Lobby Lobby Lobby SP 2.500 TOTAL Deduction =75.68Sq.M Net BuiltUp Area =688.74 Sq.M BUILDING ON CTS. NO./SURVEY NO.- 38 4.4 4.4 Lift UP UP Lift UP Lift UP UP Lift Lift Well UP Fire Lift CP UP Lift Well UP SITE ADDRESS : Fire Lift 1.80X1.77 1.80X1.77 2.1 2.1 1.80X1.77 1.80X1.77 (3.17 Sq.m) Plot 5.25 5.25 2.065 2.065 (3.17 Sq.m) (3.17 Sq.m) SP SP SP SP SP SP SP SP SP SP SP SP SP 5.25 5.25 (3.17 Sq.m) 2.065 2.065 Void1 Void2 LiftWell2 LiftWell1 2.1 2.1 BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Infra Private Limited Phase II BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Infra Private Limited Phase II BUILT UP AREA CALCULATION 4.4 4.4 BUILT UP AREA CALCULATION FOR Ground Floor Jog Mahajan Infra Private Limited Phase II CP BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Infra Private Limited Phase II BUILT-UP AREA CALCULATION Ground Floor Jog Mahajan Infra Private Limited Phase II FOR Ground Floor Jog Mahajan Infra Private Limited Phase II AREA NAME LENGTH WIDTH Area(Sq.M) Name Of Architect : ADWAIT MADHUKAR SAURKAR SP SP SP SP SP SP SP SP SP SP BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION AREA NAME LENGTH WIDTH Area(Sq.M) BLOCK 2.10 2.06 4.33 FOR Ground Floor Jog Mahajan Infra Private Limited Phase II BLOCK 2.10 2.06 4.33 FOR Ground Floor Jog Mahajan Infra Private Limited Phase II BLOCK AREA TOTAL =4.33Sq.M AREA NAME BLOCK LENGTH 5.25 WIDTH 4.40 Area(Sq.M) 23.10 AREA NAME LENGTH WIDTH Area(Sq.M) LiftWell1 - - BLOCK AREA TOTAL =4.33Sq.M 3.17 LiftWell2 - - 3.17 LOGO ADDRESS OF OFFICE BLOCK 5.25 4.40 23.10 TOTAL Deduction =3.17Sq.M BLOCK AREA TOTAL =23.10Sq.M TOTAL Deduction =3.17Sq.M Void1 - - 1.71 Void2 - - BLOCK AREA TOTAL =23.10Sq.M 1.71 Net BuiltUp Area =1.16 Sq.M Net BuiltUp Area =1.16 Sq.M OFFICE - TOTAL Deduction =1.71Sq.M TOTAL Deduction =1.71Sq.M Net BuiltUp Area =21.39 Sq.M Net BuiltUp Area =21.39 Sq.M 402 MANGALMURTI APARTMENT, AMBAPETH, AMRAVATI 4.4 Basement Floor Ground Floor Basement Floor Ground Floor 4.4 OWNERS SIGN - TECHNICAL PERSON SIGN Signature Not Verified 5.25 5.25 BASEMENT FLOOR PLAN GROUND FLOOR PLAN BASEMENT FLOOR PLAN GROUND FLOOR PLAN 5.25 5.25 Void4 2.1 Verified by applicant Digitally signed by ADWAIT MADHUKAR SAURKAR 2.065 2.065 Void3 2.1 Date: 2022.10.07 12:44:02 IST Reason: Technical Person DSC 2.065 2.065 4.4 Location: Amravati Municipal Corporation 2.1 4.4 BUILT-UP AREA CALCULATION Basement Floor Jog Mahajan Infra Private Limited Phase II 2.1 Jog Mahajan Private Limited Phase I BUILT-UP AREA CALCULATION Basement Floor Jog Mahajan Infra Private Limited Phase II BUILT UP AREA CALCULATION SCALE - 1:100 Date: 14/09/22 FOR Basement Floor Jog Mahajan Infra Private Limited Phase II BUILT-UP AREA CALCULATION Basement Floor Jog Mahajan Infra Private Limited Phase II BUILT-UP AREA CALCULATION Basement Floor Jog Mahajan Infra Private Limited Phase II BUILT UP AREA CALCULATION FOR Basement Floor Jog Mahajan Infra Private Limited Phase II AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME LENGTH WIDTH Area(Sq.M) BLOCK 5.25 4.40 23.10 BUILT UP AREA CALCULATION BUILT UP AREA CALCULATION FOR Basement Floor Jog Mahajan Infra Private Limited Phase II BLOCK 5.25 4.40 BLOCK AREA TOTAL =23.10Sq.M 23.10 Void4 - - BLOCK AREA TOTAL =23.10Sq.M 1.71 FOR Basement Floor Jog Mahajan Infra Private Limited Phase II AREA NAME LENGTH WIDTH Area(Sq.M) AREA NAME LENGTH WIDTH Area(Sq.M) JOB NO - DDMCA-22-65103 CHECK BY - - Jog Mahajan Infra Private Limited Phase II Void3 - - 1.71 TOTAL Deduction =1.71Sq.M BLOCK 2.10 2.06 4.33 BLOCK 2.10 2.06 BLOCK AREA TOTAL =4.33Sq.M 4.33 TOTAL Deduction =1.71Sq.M Net BuiltUp Area =21.39 Sq.M BLOCK AREA TOTAL =4.33Sq.M TOTAL Deduction =0.00Sq.M Net BuiltUp Area =21.39 Sq.M TOTAL Deduction =0.00Sq.M Net BuiltUp Area =4.33 Sq.M Net BuiltUp Area =4.33 Sq.M SUBMISSION DRAWING