FORM - 2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account -Project wise) Date: 10/07/2023 To, The Sky Line Builders and Developers, Amravati -444601. Subject: Certificate of Cost Incurred for Development of Galaxy Tower having MahaRERA Registration Number P50300048524 being developed by Sky Line Builders and Developers (As on 30/06/2023) Sir, I/ we SAMEER AAGAZ ABDUL KALAM have undertaken assignment of certifying Estimated Cost for Galaxy Tower having MahaRERA Registration Number P50300048524 being developed by Sky Line Builders and Developers. 2. We have estimated the cost of Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal &external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer /Consultants. The Schedule of times and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/ Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 4,05,00,000/- (Total of Table Aand B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required completion of the apartments and proportionate completion of internal &external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the building(s)/Wing(s)/Layout/Plotted Development from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost ncurred tilldate is calculated at Rs.17,09,166/-. The amount of Estimated Cost Incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal &external works, as per specifications mentioned in agreement of sale,of the Project is estimated at Rs 3,87,90,834/ 6. Icertify that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table Aand BBelow. TABLE- A Building called Galaxy Tower Sr. No. Particulars Amounts 1 Total Estimated cost of the building as on date of Registration is Rs 4,05,00,000/ 2 Cost incurred as on date of certificate Rs 17,09,166/ 3 Work done in Percentage (as Percentage of the estimated cost) 4.22% Balance Cost to be Incurred** (Based on Estimated Cost) Rs 3,87,90,834/ Cost Incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) Rs TABLE-B Internal &External Development Works in Respect of the Registered Phase Particulars Amounts Sr. No. 1 Total Estimated cost of the Internal and External Development Works including amenities and Rs Facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs 3 Work done in Percentage % (as Percentage of the estimated cost) Balance Cost to be Incurred (Based on Estimated Cost) Rs Cost Incurred on Additional/Extra Items not included in the Estimated Cost (Table-C) Rs Yours Faithfully Ea. Sames Aagaz fbdudtalam DcE, SE Civi Signature of Engineer (Licence No... Local Authority License no. Agreed arnd Accepted by: Signature of Promoter Skyline Builders And Developer8 Name: shoikh kashit padnar Date: o lo7l23 Note: drawings approved 1. The scope of work is to complete Registered Real Estate Project as per from time to time and as per specifications mentioned in agreement of sale. done by an independent 2. (*)Quantity survey can be done by office of Engineer or can be upon by the Quantity Surveyor, whose certificate of quantity calculated can be relied Developer, the Engineer. In case of independent Quantity Surveyor being appointed by quantity are being calculated name has to be mentioned at the place marked (*) and in case who is responsible by office of Engineer, the name of the person in the office of Engineer, marked(*). for the quantity calculated should be mentioned at the place Difference between Total estimated Cost 3. (**) Balance Cost to be incurred (4) may vary from required/escalation of cost etc. (1) and ActualCost incurred (2) due to deviation in quantity required for development of the Real As this is an estimated cost, any deviation in quantity be incurred. Estate Project will result in amendment of the cost incurred/to indicative and not exhaustive. 4. Allcomponents of work with specifications are Example: Any deviations in input 5. Please specify if there are any deviations/qualifications. material used from specifications in agreement of sale. Table C List of Extra/Additional /Deleted Items considered in cost (Which were not part of the original Estimate of Total Cost) List of Extra/Additional/Deleted Items Amount(In Rs) Sr.No. 2