FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Building/Wing wise) To, Date: 07/01/2024 Skyline Builders and Developers, Amravati Subject: Certificate of Percentage of Completion of Construction Work of: Galaxy Tower having MahaRERA No. PS0300048524 being developed by Skyline Builders and Developers as on (31/12/2023) Sir, /we ABDUL HASAB ABDUL HAKAM have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Galaxy Tower having MahaRERA No P50300048524. Based on Site Inspection, with respect to Layout/each of the Building/Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks /Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) Excavation 90 2 Basements (if any) 80 3 Number of Podiums (if any) 0 4 Plinth 0 5 Stilt Floor 6 slabs of super structure 15 7 Internal walls, Internal Plaster, Floorings within 20 Flats/Premises, Doors and Windows toeach of the Flat/Premises Sanitary Fittings within the Flat/Premises. Staircases,Lifts Wells and Lobbies at each Floor level 30 connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 Externalplumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOc,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE -B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads &Foothpaths No 2 Water Supply Yes As pe 3 Mop Sewerage (chamber, sewage lines), Storm Water Drains As Pe Storm Water Drains 5 Landscaping &Tree Planting No 6 Street Lighting No 7 Community Building No Treatment and disposal of sewage and sullage water No Solid Waste management &DisposalNO 10 Water conservation, Rain water As Pez harvesting 11 Energy management No 2 12 Fire protection and fire safety ts pe requirements 13 Electrical meter room, sub-station, receiving station 14 Other Yours Faithfully KAHEKASHA ARCHITECTS AR ABDU HASAB ABDJL HAZAM& A3 M 888807752, 702r0 Signature &Name (IN BLOCK LETTERS) of L. S. / Architect (License no...... ...) Agreed and accepted by: DEVELOPER. KYLINE BUILDERS AND PARTNER Signature of Promoter Name: Date: