FORM 1 (To be ARCHITECT'S CERTIFICATE submitted at the time of Registration of Ongoing Project and for Designated Account -Building/Wing wise) withdrawal of Money from To, Sky Line Builders and Date: 07/04/2023 Amravati Developers, Subject: Certificate of Percentage of Completion of Construction Work of: MahaRERA No. P50300048524 being developed by Sky ine Builders and Galaxy Towershaving FoR THE PeRo Developers, on JANJARY 23 -Marh23 Sir, / we ABDUL HASAB ABDUL HAKAM have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Galaxy Tower having MahaRERA No. P50300048524. Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks / Activity Percentage of ActualWork Done (1) (2) (As on date of the Certificate) 1 Excavation 50 2 Basements (if any) 10 3 Number of Podiums (if any) Plinth 5 Stilt Flor 6 slabs of super structure 0 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. 9 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts,Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting 0 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to çonditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done Internal Roads & Foothpaths 2 Water Supply ts per 3 Sewerage (chamber, sewage lines), Storm Water Drains es flu. Storm Water Drains Landscaping &Tree Planting 6 Street Lighting Community Building 8 Treatment and disposal of sewage and sullage water Solid Waste management & Disposal 10 Water conservation, Rain water As pe harvesting Yes Plan 11 Energy management 12 Fire protection and fire safety As pen requirements yes Plaa. 13 Electrícal meter room, sub-station, receiving station No 14 Other Yours Faithfuly KAHEKASHA ARCHITECTS AR ABDäI HASAE ABD'J MAAM¿f Signature &Name (NBLOCK LETTERS) of L.S. /Architect (License no............... ..... Agreed and Accepted by: Signature of Promoter Skyline Buildors And Developars Name: shaikh Kashif Date: o7/64 /23