FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registrationof Ongoing Project and for withdrawal of Money from Designated Account - Building/Wing wise) To, Date:07/10/2023 Sky Line Builders and Developers, Amravati Subject: Certificate of Percentage of Completion of Construction Work of: Galaxy Tower having MahaRERA No. P50300048524 being developed by Sky Line Builders and Developers, Sir, / we ABDUL HASAB ABDUL HAKAM have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Galaxy Tower having MahaRERA No. P50300048524. Based on Site Inspection, with respect to Layout/each of the Building/ Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks/Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 90 Basements (if any) 50 3 Number of Podiums (if any) Plinth Stilt Floor 5 6 slabs of super structure 10 Floorings within 7 Internal walls, Internal Plaster, the Flats/Premises, Doors and Windows to each of Flat/Premises Sanitary Fittings within the Flat/Premises. level 20 Staircases, Lifts Wells and Lobbies at each Floor connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. Installation of lifts, water pumps, Fire Fighting 0 11 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads &Foothpaths No 2 Water Supply 307 Plam Sewerage (chamber, sewage lines), Storm Water Drains tes 4 Storm Water Drains No 5 Landscaping &Tree Planting NO ) 6 Street Lighting No Community Building Treatment and disposal of sewage and sullage water Solid Waste management & Disposal 10 Water conservation, Rain water harvesting Yes 11 Energy management No 12 Fire protection and fire safety requirements yes 13 Electrical meter room, sub-station, receiving station Wo 14 Other Yours Faithfully KAHEKASHA ARCHITETS AR ABDUI HASAB AEDUAAi& Signature &Name (|N BLOCK LETTERS) ofL S. /Architect (License no. Agreed and Accepted by: Signature of Promoter Name: Shak Skyline Buiders And Developers Date: (o]1o |2923 Parner