FORM 1 ARCHITECTS CERTIACATE (To be submitted at the time of Registration of Ongolng Project and for withdrawal of Money from Deslgnated AccountBullding Wing wlse) To, Date: 07/04/2023 Sky Line Builders and Developers, Amravati Subject: Certificate of Percentage of Completion of Construction Work of: Galay Tower having MahaRERA No. PS0300048524A being developed by Sly Une Bulliders and Developers, Sir, / we ABDUL HASAB ABDUL HAKAM have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Galay Tower having MahaRERA No. PSO300048524 Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesald Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detalled n Table B. Table-A Layout/Bullding Wing Number (To be prepared separately for each Bulding Wing of the Project) SrNo Tasks/ Actvity Percentage of Actual Work Done (2) (As on date of the Certicate) 1 Excavation 50 Basements (if any) 10 3 Number of Podiums (if any) 0 Plinth Sut Floor 0 slabs of super structure Ta213IH)RA 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises Sanitary Flttings within the Flat/Premises. 9 Staircases, Lifts Wells and Lobbles at each Floor level connecting Staircases and LIfts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the bulding. 15 Installation of lifts, water pumps, Fire Fighting Fltings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanlcal equipment, Compliance to condtions 'of environment /CRZ NOC,FInlshing to entrance lobby/s, plinth protectlon, paving of areas appurtenant to BulldingWlng, Compound Wall and all other requirements as may be requlred to Obtain Occupation /Completion Certiflcate TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No, Common Roads and Faclities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths Water Supply awerge (chamber, sewage lnes), Yes flan Storn Water Dralns Yes Storm Water Drains Landscaping &Tree Planting Street Lighting Community Bullding N 8 Treatment and disposal of sewage and sullage water No 9 Solid Waste management &Disposal No 10 Water conservatlon, Rain water harvesting Yes Pla Energy management 12 Fire protection and fire safety As pe requirements plam. 13 ESectrical meter room, sub-station, receiving station No 14 other Yours Faithfully KAHEKASHA ARCHITECTS AR ABDUL HASAB ABDU AA6 r Signature &Name (IN BLOCK LETTERS) of L S.J Architect (icense no. Agreed and Äccepted by: Signature of Promoter Skyline Builders And Developers Name: shaikh Kashig Date: o7o4 /2g Parne