\ SHAILENDRA DESHMUKH & ASSOCIATES ARCHIIECTS, INTERIOR DESIGNERS & GOW. APPROVED.VATUER OFFICE: "VRINDAVAN SANKUL" PANCHAVAn SQUARE AMRAV Afrt//,&3 PH.NO :- OFF. lo7 2t ) 25 67 233, MOB,9 123 12 1Ol g .t' FORM I [see Regulation 3] ARCHTTECTS CERNFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Account) t Date :2311112022 To, SRUSHTI INFRA, Through partner SHATLESH WANKHADE Dental College Road, Near Amravati Univercity Amravati - 444603. sublect : certificate of percentage of completion of construction work of Rachana srushti Building(s) ! of the onlv phase of th€ project Rera No. p50300031i76] [Maha situated on the PIot bearing C.N. No/GTS No. /Survey no.-_r, Final plot no. 24 Lsurvey no-[llffdemarcated by its boundaries ( ratitude and rongitude of the end points) prot No. 25 to the North, 30 M wde Road to the South, prot no. 22-A,22-8,23 to the East 30 M Wide Road to the West of Division Wadali village - Tatuka Amravati District Amravati plN 1144603 .(m€suring 2s45.72 sq.mts. Area being deveroped by Srushti tnfra Through partner Shailesh Wankhade. Sir l/ we Shailendra Deshmukh have undertaken assignment as Architect /Licensed surveyor of certifying Percentage of completion of construc{ion work of Rachana srushti Building(sJ 1 of the onlv Phase of the project [[Maha Rera No. p50300031176]l situated on the prot bearing c N' NoicrS No. /Survey no.-,r Finar prot no. 24 ,-survey no._!!3A_demarcated by its boundaries ( latitude and rongitude of the end points) prot No. 2s to the North, 30M e Road to the south, plot no. 22-A,22-8, 23 to the East, 30 M wide Road to the west of Division wadali - village Taluka Amravati District Amravati plN 444603 admeasuring zils-7| sq.mts. Aiea... _;, ;..r being developed by Srushti lnfra Through partner Shailesh Wankhade -l ,:r.\i L '' ' ).,','t , , i'\\ , Y< \\r::,^ - .-r.:t _ '1. Following technical professionals are appointed by Owner / promoter :- (i) M/s/Shri/Smt Shailendra Deshmukh as L.S. / Architect ; (ii) litl/s /Shri / Smt Dilip P. MASE as Structural Consuttant (iii) M/s /Shri / Smt as MEP Consultant --_ (iv) M/s /Shri / Smt -Sudeep Pethe- as Site Supervisor 4 Based on Site lnspection, with respect to each of the BuildingANing of the aforesaid Real Estate Projeg , I certlfy that as on the date of this certificate, the Percentage of W-grk done for ' ', each of the buildingMing of the Real Estate Project as registered vide number [Maha Rera No. P50300031176] under MahaRERA is as per.table A herein:below. The percentage of the work executed with respec{ to each of the activity of the entiie phase is detailed in Table B. Table A t. Building Ming Number@@fu!!! (to be prepared separately foreach B uilding Ming of the Project) Sr. Tasks /Activity Percentage No of work done 1 Excavation 90% 2 0_.l2qq) number of Basement(s) and 1(One) Plinth 90% 3 0 (zero) number of Podiums 60% 4 Stilt Floor 90% 5 11 (Eleven) number of Slabs of Su per Structure 40% lnternal walls, lntemal Plaster, Floorings within Flats/Premises, 25 o/o Doors and Wndows to each of the FlaUPremises I 7 Sanitary Fittings within the FlaUPremises, Electrical Fittings within a% the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 25% Staircases and Lifts, Overhead and Underground Water Tanks o The e'xtemal plumbing and extemal plaster, elevation, completion 0% of tenaces with waterproofing of the BuildingMing, t0 lnstallation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of '/CRZ environment NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate I TABLE-B lnternal & External Development Works in Respect of the enti re Registered phase S.No. Co mmon areas and Facilities, Proposed Percentage Details Amenities (Yes/No) of Work done 1 lntemal Road s & Footpath- No NA NA 2 WEter Supply Yes 0 o/o NIL '3. S ewerage (chamber, lines, Yes 0 o/o As per Plan Septic Tank , STp) 4 a torm Water Drains Yes 0 o/o As per Plan 15. Lands caplng & Tree Planting No 0 o/o AT THE TIME OF coMPLtTtorioF PROJECT o Street Lighting No 0% NIL 7 Com munity Buildings No 0 a/o NA 8 Treatm ent and disposal of Yes Q o/o Work in sewage and sullage water progress I Solid Waste management & No 0% NA Disposal 10. Water conservation, Rain water Yes 0% At the time of harvesting I I completion of I work 11. E nergy management No 0 o/o NA '12. F ire protection and fire safety Yes 0 o/o At Th e time of requjrement completion of work '13 Electrical meter room, sub- Yes o/o 0 As per thE station, receiving station requirements of authority 14 Others ( O ption to Add more) NA 0% NA I Yours Faithfully AR. SHAILENDRA DESHMUKH ----1 Reg. no. CN97t2j932 n t