SHAILENDRA DESHMUKH & ASSOCIATES ARCHI]ECTS, INTERIOR DESIGNERS & GOW APPROVED VALUER . OFFICE: ',VRIN DAVAN SANKU t ' PANCHAVATI . SOUARE, AMRAVATI-444603 PH,NO :- oFF. (o72t)266 7 233, MO8.9423424013 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submifted at the time of Registration of ongoing project and for withdrawar of Money from Designated Account) Date:05107t2022 To, SRUSHTI INFRA, Through partner SHATLESH WANKHADE Dental College Road, Near Amravati Univercity Amravati - 444603. subject : certificate of Percentage of compretion of construction work of Rachana srushti Building(s) ! of the onlv Phase of the project [Maha Rera ruo. psoeoffi situated on the plot bearing C.N. No/CTS No. /Survey no._____/ Final plot no. 24 no' 103/4 demarcated by its boundaries ( ratitude -survey and rongitude of the end points) prot No' 25 to the North, 30 M wide Road to the south, prot no. 22-A,22-8,23 to the East, 30 M wide Road to the west of Division wadari vilage -- Taruka Amravati District Amravati prN 444603 admeasuring 2545.77 sq.mts. Area being deveroped by srushti rnfra Through partner Shailesh Wankhade. Sir, l/ we shairendra Deshmukh have undertaken assrgnment as Architect /Licensed surveyor of certifying Percentage of compretion of construction work of Rachana srushti Buirding(s) of the onlv Phase of the project I [[Maha Rera No. pso30o03{i76]r situated on the prot bearing c N No/CTS No /survey no.--------l Finar prot no. 24 boundaries ( ratitude and rongitude of the -Survey no. 103/4 demarcated by its end points) prot No. 25 to the North, 30 M wide Road to the south, prot no.22-A,22-8, 23 to the East, 30 [/ Wide Road to the west of Division wadari village - Taruka Amravati District Amravati prN 444603 admeasuring 2s4s.77 sq_mts. Area being developed by Srushti rnfra Through partner shairesh wankhade. 1. Following technical professionals are appointed by Owner / promoter :- (i) M/s/Shri/Smt Shaitendra Deshmukh as L.S. / Architect ; (ii) M/s /Shri / Smt Ditip p MASE as Structurat Consultant (iii) M/s /Shri / Smt ______ as MEp Consuttant (iv) M/s /Shri / Smt -Sudeep pethe_ as Site Supervisor Based on site rnspection, with respect to each of the BuirdingA/i/ing of the aforesaid Estate Project , r certify that as on Rear the date of this certificate, the percentage of work done for each of the buirdingMing of the Rear Estate project as registered vide number [Maha Rera No' P5o30o031l76] under MahaRERA is as per table A herein berow. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building &ving Number Rachana srushti (to be prepared separatery for each Buirding Arving of the Project) Sr. T asks /Activity P ercentage No of work done 1 Excavation 90o/o 2 0 (zero) n u m be r of B a m e nt ( S a n d 'l(One) P n h 90% 3 0 (zero) numbe r of Podiums 20o/o 4 Stilt Floor 90o/o 5 11 (El even) number of Slabs of Super Structure 30% 6 lnternal walls , lnternal Plaste r, Floorings with in Flats/Premises, 10 o/o Doors and Windows to each of the FlaUpremises 7 Sanitary Frttin gs within the FtaUp remises, Electrical Fittings within o% the FlaUPremises 8 Sta rca S Lifts e S a n d L o b bi s a e a ch F o o r e co n n ct n s 15% S rc a S ES a n d Lifts, Ove rh a d a n d U n de rg ro u n d Wate r T a n k S I The external pl umbing and external plaster, el evation, completion o% of terraces with waterproofing of the BuildingA/Vin s, 10 lnstallation of llfts, water pumps, Fire Fighting Fittings and o% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingM/ing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B lnternal & External Development Works in Res pect of the entire Registered phase S.No. Com mon areas and Facilities, Proposed Percentage Details Amenities (Yes/No) of I Work done lt lnternal R oads & Footpaths No NA NA Water Supply Yes 0 o/o NIL 3 J ewerage (chamber, lines, Yes 0 o/o As per Plan Septic Tank , STp) 4 I Storm Water Drains Yes 0 o/o As per Plan 5 Land scaping & Tree Planting No l o% ATT HE TIME OF COMPLITION OF PROJECT 6. Street Lighting No O o/o NIL 7 (- ommunity Buildings No 0 o/o NA I Treat ment and disposal of Yes 0% Work in sewage and sullage water progress I Solid Wast e management & No 0% NA Disposal 10 Wate r conservatlon, Rain water Yes 0Yo At the time of harvesting completion of I work 11 E nergy management No 0% NA 12. Fire protectt on and fire safety Yes 0Yo A t The time of requrrement completion of ,1.> work Electrical meter room, sub- I Yes 0% As per the statron, receiving station requtrements of authority 14 Others ( Opti on to Add more) NA 0 o/o NA Yours Faithfully AR. SHAILENDRA DESHMUKH Reg. no. CN97t21932 7 4