S.R.Infrastructure Shashank.R.Chandak M.Tech (C.M), VJTI, Mumbai B.E (Civil), VIIT, Pune Mob. : 8080364755, 8275418699 Date : Ref. No. FORM -2 ENGINEER'S CERTIFICATE tobe submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Accout- Project wise) Date: 10/07/2025 T¢, The Chandak Construction,/s Armravati -444601. subject: Certificațé of Cost Incurred for Development of Chandak Towerhaving MahaRERA Rezistration Number P50300051204being developed by Chandak Construction(As on 30/06/2025) Sir, / We ......have undertaken assignment of çertifying Estimated Cost for Chandak Towerhaving MaHaRERA Registration NumberP50300051204being developed by Chandak Construction. 2. We have estimated the cost of Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per speçitications mentioned in agreement of sale. Our estimated cost calculations are based on the Draings|/ plans made available to us for the project under reference by the Developer /Consultants. The Schedule of times and quantity required for the entire work as calculated by ShashankR. Chandak Licensed Engineer appointed by Developer/ Engineer, the assumption of the cost of\raterial, labour and other inputs made by developer, and the site inspection carried out by us to asertain/confirm the above analysis given to us. 3.We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 1.22,50do0/-(Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with eference to the Civil, MEP, and allied works required completion of the apartments and propbrtioate completion of internal & external works, as per specifications mentioned in agreementof sale and for the purpose of obtaining occupation certificate / completion certificate forthe butding(s)/Wingls)/Layout/Plotted Development from the Amravati Municipal Corporation being the AarisCamp AtketHdENOGAUAÜGPdEAoESABTİFEGA Dsieseemented. Road, Amravati. Maharastra. - 444 602 at Rs.2,04,34,779/-. The amount of Estimated Cost Incurred till date is calculated and unit cost of these items. Estimated used on the basis of input materials/services 4. The Cost Incurred is calculated completion of the Allied works for Completion of the Civil, MEP and specifications 5. The Balance cost of of internal & external works,as per completion apartments and proportionate of sale, of the Project is estimated at Rs -81,84,779/ mentioned in agreement MEP and allied work for the apartments and proportionate of the Civil, the aforesaid 6. Icertify that the Cost mentioned in agreement of sale, of per specifications internal & external works, as of this certificate is as given in Table A and B Below. Project as completed on the date 3A TABLEA 4 2 isiswrh'ii, nu rBuilding calledChandak Tower 1Qqrci Amounts Sr. No. Particulars t as on date of 1 Total Estimated cost of the building Registration is Rs 1,22,50,000/ of certificate Oi otrl j D to A72s Cost incurred as on date Rs 2,04,34,779/ Work done in Percentage cost) 166.81% (as Percentage of the estimated Balance Cost to be Incurred** lt no a(Based on Estimated Cost) Rs -81,84,779/ not included 5 Cost Incurred on Additional/Extra Items in the Estimated Cost (Table-C) Rs_ TABLE -B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts 1 Total Estimatedcost of the Internal and External Development Works including amenities and RS Facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs 3 Work done in Percentage (as Percentage of the estimated cost) % 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs - 5 Cost Incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) Rs Yours Faithfully Signature of Engineer Speeto (Licence No.MLI935 Local Authority License no. Agreed and acceptedby: HAHDAR Signature of Promoter PARTNEN Name: Kaoal J- (hamdalk amd ip3. chawdakk Date: 1o Jo?H25 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned inagreement of sale. 2. (*)Quantity survey can be done byoffice of Engineer or can be done byan independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer.In case of independent Quantity Surveyor being appointed by Developer,the name has to be mentioned at the place marked (*) and incase quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and ActualCost incurred (2) due to deviationin quantity required/escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/qualifications. Example:Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional /Deleted Items considered in cost (Which were not part of the original Estimate of Total Cost) Sr.No. List of Extra/Additional/Deleted Items Amount(In Rs) 1 2