S.R.Infrastructure Shashank.R.Chandak R M.Tech (C.M), VJTI, Mumbai B.E (Civil), VIIT, Pune Mob. : 8080364755, 8275418699 Ref. No. Date : FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Building/Wing wise) To, Date: 07/01/2026 Chandak Construction, |Amravati Subject: Certificate of Percentage of Completion of Construction Work of:Chandak Towerhaving MahaRERA No.P50300051204being developed by Chandak Construction as on (31/12/2025) Sirl I ye Shashank , Chandak have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of/ Completion of Construction wotk of Chandak TowerhavingMahaRERA No. P$300051204. Bas¢d on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Projęct. I certifythat as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed id Table B. Table-A Layput/Building/Wing Number(To be prepared separately for each Building /Wing of the Project) SrNo Tasks/ Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation | 0 2 Basements (if any) Çhandak Bungalow, Near Govt. Girls High School, Camp Road, Amravati. Maharastra. - 444 602 3 Number of Podiums (if any) Plinth 5 Stilt Floor 6 slabs of super structure Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises. 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. 11 Installationof lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 40 environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal andExternal Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths Yes 2 Water Supply Yes 3 Sewerage (chamber, sewage lines), Yes Storm Water Drains 4 Storm Water Drains Yes Landscaping & Tree Planting No 6 Street Lighting No 7 Community Building No Treatment and disposal of sewage and sullage water Solid Waste management & Disposal No Water conservation, Rain water Yes 10 J0D harvesting 11 Energy management e l0D Yes 12 Fire protection and fire safety Yes requirements go 13 Electricalmeter room, sub-station, Yes receiving station 14 Other No Yours Faithfully strycLure or (License no....M.LA33.36..) Agreed and accepted by: M CHANDAK CONEIUOTOe PARTNEM Signatureof Promoter Name: Rajbopal. Chamdak aed Diip. Chandok Date: