S.R.Infrastructure Shashank.R.Chandak MTech (C.M), VJTI, Mumbai B.E (Civil), VIIT, Pune Mob. : 8080364755, 8275418699 Ref. No. Date : FORM 1 ARCHITECT'SCERTIFICATE (to be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Building/Wing wise) T, Date: 07/10/2025 Chandak Construction, |Amravati sbject: Çertificate of Percentage of Completion of Construction Work of:Chandak Towerhaving MahaRERA No.P5030ó051204being developed by Chandak Construction as on (30/09/2025) Sir I we Shashank , Chandak have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Chandak TowerhavingMahaRERA No. P$d300051204. Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Projgct. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building /Wing of the Real Estate Project under MahaRERA is as per Table A herein below. Tha bercehtage of the work executed with respect to each of the activity of the entire phase is detailed ih Table B. Table-A Layou/Building/Wing Number(To beprepared separately for each Building /Wing of the Project) SrNd Tasks /Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) Excavation Bạsements (if any) Çhandak Bungalow, Near Govt. Girls High School, Camp Road, Amravati. Maharastra, - 444 602 3 Number of Podiums (if any) 4 Plinth Stilt Floor 6 slabs of super structure 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings andEquipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance toconditions of environment/CRZ NOC,Finishing to entrance lobby/s,plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE- B Common Areas (Internaland External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths Yes 2 Water Supply Yes 3 Sewerage (chamber, sewage lines), Yes Storm Water Drains 4 Storm Water Drains Yes |0D Landscaping & Tree Planting No 6 Street Lighting No 7 Community Building No Treatment and disposal of sewage No and sullage water 9 Solid Waste management & Disposal No 10 Water conservation, Rain water Yes harvesting 11 Energy management No 00 12 Fire protection and fire safety Yes requirements 13 Electrical meter room, sub-station, Yes receiving station 14 Other No Aructure Yours Faithfully Signature & Name (IN BLOCK LETTERS) of L. S. /Architect ML (License no....LlS..) Agreed and accepted by: SARTNE Signature of Promoter Name: Kaigopal J. chande k. ad elip s. Chamdele Date: