2 Basements (if any) 3 Number of Podiums (if any) Plinth 5 Stilt Floor 6 slabs of super structure 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises. to Staircases, Lifts VWells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks go 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE -B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths Yes |00 2 Water Supply Yes : 3 Sewerage (chamber, sewage lines), Yes Storm Water Drains 100 Storm Water Drains Yes 100 5 Landscaping & Tree Planting No 6 Street Lighting No 7 Community Building No Treatment and disposal of sewage No and sullage water Solid Waste management & Disposal No 10 Water conservation, Rain water Yes harvesting 11 Energy management No 12 Fire protection and fire safety Yes requirements 13 Electrical meter room, sub-station, Yes receiving station 14 Other No Yours Faithfully (License no....MLIA3) Agreed and accepted by: M/s ChANOAK CONSTRUGTIS Loladale Signature of Promoter Name: Reysgpad.J.Ckamdak, Date: 0fofa025