S.R.Infrastructure Shashank.R.Chandak M.Tech (C.M), VJTL, Mumbai B.E (Civil), VIIT, Pune Mob. : 8080364755, 8275418699 Ref. No. Date : FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Building/Wing wise) To, Date: 07/04/2025 Chandak Construction, Amravati Subject:Certificate of Percentage of Completion of Construction Work of: Chandak Tower having MahaRERA No. P5Q300051204 being developed by Chandak Construction as on (31/03/2025) Sir, Wwe Shashank R, Chandak have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Chandak Tower having MahaRERA No. P50300051204. Based on $ite Inspection, with respect to Layout/each of the Building/ Wing of the aforesaid Real state Project. Icertify that as on the date of this certificate, the Percentage of Work done for each df the byitding / Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. rhe pertentage of the work executed with respect to each of the activity of the entire phase is betailedin Table B. Table-A Laygut/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) Sryo Tasks/ Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) Excavation |00 Çhandak Bungalow, Near Govt. Girls High School, Camp Road, Amravati. Maharastra.- 444 602 2 Basements (if any) 3 Number of Podiums (if any) 0 Plinth 5 Stilt Floor 6 slabs of super structure LO0 7 Internal walls, Internal Plaster, Floorings within 80 Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. +0 9 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0 completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittingsand Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment,Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE -B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done Internal Roads & Foothpaths Yes Water Supply Yes Sewerage (chamber, sewage lines), Yes 0 Storm Water Drains 4 Storm Water Drains Yes 0 5 Landscaping &Tree Planting No 0 6 Street Lighting No 7 Community Building No Treatment and disposal of sewage No and sullage water Solid Waste management & Disposal No 10 Water conservation, Rain water Yes 0 harvesting 11 Energy management No 0 12 Fire protection and fire safety Yes requirements 13 Electrical meter room, sub-station, Yes 0 receiving station 14 Other No 0 Rnfrasirucure Yours Faithfully Propietor Signature &Name (IN BLOCK LETTERS) ofL. S. / Architect ML9356.) (License no... Agreed and accepted by: e f CBARDAR CONSTKOOTIg PARTNEA Signature of Promoter Name: fajgopal. J. Chomdak owd Dip-J. Chaudak Date: lo4| 202s