Mobile :9370153239, 9370151769 M/s. CHANDAK CONSTRUCTIONS o BuildeRs & DEVElopeRs Main Square, Govt. Girls High School, Court Road, Camp, AMRAVATI -444 602 Ref. No. Date : FORM 2 ENGINEER'S CERTIFICATE (To be submitted at the time of Reglstration of Ongoing ProjeƧt and for withdrawal of Money from Designated' Account -Project wise) Date: 10/01/2024 To, The Chandak Construction, Amravati -444601. Subject: Certificate of Cost Incurred for Development of Chandak Tpwerhaving MahaRERA Registration Number P50300051204being developed by Chandak Construction(As on October 2023 to December 2023) Sir, IShashank. R. Chandak have undertaken assignment of certifying Estimated Cost for Chandak Tower having MahaRERA Registration NumberP5030o0051204being developed by Chandak Construction. 2. We have estimated the cost of Civil, MEPand Allied works required for completion of the apartments and proportionate completion of internal &external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer /Consultants. The Schedule of times and quantlty requlred for the entlre workas calculated by Shashank. R. Chandak Licensed Engineer" appointed byDeveloper/ Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us toascertain/confirm the above analysis given to us. 3.We estimate Total Estimated Cost of completion of the aforeseid project under reference as Ra. 1,22,50,00O/-(Total of Table Aand B)at thetlme af Reglatratlan, The aatlmated TetalCaat af Araleet is with reference to the Clvl, MEP,and alled works requlred completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate /completion certificate Corporation building(s)/Wing(s)/Layout/Plotted Development from the AmravatiMunicipal for the implemented. jurisdiction the aforesaid project is being being the Planning Authority under whose Estimated Cost calculated at Rs.58.37.213/-, The amount of 4. The Estimated Cost Incurred till date is materials/services used and unit cost of these items. Incurred is calculated on the basis of input works for completion of the 5. The Balance cost of Completion of the Civil, MEP and Allied specifications apartments and proportionate completion of internal &external works,as per mentioned in agreement of sale, of the Project is estimated at Rs 64,12,787/ 6. Icertify that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal &external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table Aand BBelow. TABLE -A Building / Wing / Layout/ plotted Development bearing Number called Chandak Tower (to be prepared separately for each Building/ Wing/Layout/Plotted Development of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building as on date of Registration is Rs 1,22,50,000/ 2 Cost incurred as on date of certificate Rs 58,37,213/ 3 Work done in Percentage (as Percentage of the estimated cost) 47.65% Balance Cost to be Incurred** (Based on Estimated Cost) Rs 64,12,787/ 5 Cost Incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) Rs TABLE-B Internal & External Development Norks in Respect of the Registered Phase Sr. No. Particulars Amounts 1 Total Estimated cost of the Internal and External Development Works including amenities and Rs Facilities in the layout as on date of Registration is 2 Cost incurred as ondate of certificate Rs 3 Work done in Percentage (as Percentage of the estimated cost) % 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs 5 Cost Incurred on Additional /Extra Items not included in the Estimated Cost (Table-C) Rs Your_ Faithfully SnASHANK.R. HAND AK (Licence No- M/L i- 19356) Local Authority License no. Agreed and acceptedby: el MIs CHANDAK CORSTF Signature of Promoter NTNES PAGINEE Name: Date: Note: 1 The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*)Quantity survey can be done byoffice of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer.In case of independent Quantity Surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked("). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/qualifications. Example:Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional /Deleted Items considered in cost (Which were not part of the original Estimate of Total Cost) Sr.No. List of Extra/Additional/Deleted Items Amount(In Rs) 1 2