Mobile : 9370153239, 9370151769 M/s.CHANDAK CONSTRUCTIONS BuildeRs & DEVElopeRS Main Square, Govt. Girls High School, CourtRoad, Camp, AMRAVATI - 444 602 Ref. No. Date : FORM -2 ENGINEER'S CERTIFICATE withdrawal of Money from (To be submitted at the time of Registration of Ongoing Project and for Deslgnated Account - Project wise) Date: 10/07/2023 To, The Chandak Construction, Amravati -444601. Towerhaving MahaRERA Subject: Certificate of Cost Incurred for Development of Chandak Construction(As on April 2023 to Registration Number P50300051204being developed by Chandak June 2023) Sir, ISha_hank. R. Chandak have undertaken assignment of certifying Estimated Cost for Chandak Chandak Towerhaving MahaRERA Registration Number P50300051204being developed by Construction. completionof the 2. We have estimated the cost of Civil, MEP and Allied works required for per apartments and proportionate completion of internal & external works of the project as on the specifications mentioned in agreement of sale. Our estimated cost calculations are based Drawings / plans made available to us for the project under reference by the Developer by /Consultants. The Schedule of times and quantity required for the entire work as calculated of the Sha_hank. R. Chandak Licensed Engineer* appointed by Developer/ Engineer, the assumption carried out by cost of material, labour and other inputs made by developer, and the site inspection us to ascertain/confirm the above analysis given to us. reference as Rs. 3. We estimate Total Estimated (ost of completion of the aforesald project under project 1,22,50,000/-(Total of Table Aand B) at thetime of Registratlon, The estimated Total Cost of completlon of the apartments and is with reference to the Civil, MEP, and allled works requlred mentioned in specifications proportionate completion of internal & external works, as per 769 certificate/completion certifica obtaining occupation agreement of sale and for the purpose of Corporation building(s)/Wing(s)/Layout/Plotted Development from the Amravati Municipal for the whose jurisdiction the aforesaid project is being implemented. being the Planning Authority under date is calculated at Rs.0/-. The amount of Estimated Cost till 4.The Estimated Cost Incurred materials/services used and unit cost of these items. Incurred is calculated on the basis of input of the The Balance cost of Completion of the Civil, MEP and Allied works for completion 5. &external works, as per specifications apartments and proportionate completion of internal estimated at Rs 1,22,50,000/ mentioned in agreement of sale, of the Project is 6. Icertify that the Cost of the Civil, MEP and alied work for the apartments and proportionate agreement of sale, of the aforesaid internal&external works, as per specifications mentioned in in Table Aand B Below. Project as completed on the date of this certificate is as given TABLE-A (to be Building / Wing / Layout/ plotted Development bearing Number called Chandak Tower prepared separately for each Building / Wing/Layout/Plotted Development of the Real Estate Project) Particulars Amounts Sr. No. 1 Total Estimated cost of the building as on date of Registration is Rs 1,22,50,000/ 2 Cost incurred as on date of certificate Rs 0/ 3 Work done in Percentage (as Percentage of the estimated cost) 0% 4 Balance Cost to be Incurred** (Based on Estimated Cost) Rs 1,22,50,000/ 5 Cost Incurred on Additional/Extra Items not included inthe Estimated Cost (Table-c) Rs TABLE -B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts 1 Total Estimated cost of the Internal and External Development Works including amenities and Rs 0/ Facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs 0/ Work done in Percentage (as Percentage of the estimated cost) 0% 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs 0/ 5 Cost Incurred on Additional/ Extra Items not included in the Estimated Cost (Table-C) Rs 0/ Yours Faithfylly SHASHANK.R.CHANDAK (Licence No : M/L :-19356) 2 Amount(ln Rs) Extra/Additional/Deleted Items ofList Sr.No. Cost) Total Estimate of original the of part not were (Which costconsidered in Items/Deleted Extra/Additional ofList TableC sale.agreement of specifications in from usedmaterial input deviations in Example:Any deviations/qualifications. any are there specifyif Please 5. exhaustive. not and indicative specifications are with work components of Al 4. incurred. incurred/to be cost the amendment of result in wilProject Estate Real the development of required quantity for deviation in any cost, estimated an thisis As required/escalation etc. cost of quantity deviation in todue (2) incurred CostActual and (1) estimated Cost Totalbetween Difference from vary may (4 incurred ) betoCostBalance (**) 3. marked(*). place thementioned at should be calculated quantity the responsible for Engineer, whois office of the person in the nameof the Engineer, office of calculated by being quantity are case in and (*)marked place thementioned at betohas name Developer, the appointed by beingSurveyor Quantity independent Engineer.In case of the upon by relied calculated quantity becan certificate of whoseSurveyor, Quantity independent andone by becan Engineer or of office by done becansurvey (*)Quantity 2. sale. agreement of mentioned in specifications per asand time time from to approved drawings per Project as Estate Registered Real complete to work is scope of The 1. Note: Date: Name: PABTAE Promoter Signature of CORSTR! CHANDAK accepted /s Mar by: andAgreed License Authority no. Local