FORM 1 ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account – Building/Wing wise) To, Date: 07/07/2024 Chandak Construction, Amravati Subject: Certificate of Percentage of Completion of Construction Work of: Chandak Tower having MahaRERA No. P50300051204 being developed by Chandak Construction as on (30/06/2024) Sir, I/ we Shashank R, Chandak have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Chandak Tower having MahaRERA No. P50300051204. Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks / Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 100 2 Basements (if any) 0 3 Number of Podiums (if any) 0 4 Plinth 100 5 Stilt Floor 0 6 slabs of super structure 80 7 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. 0 9 Staircases, Lifts Wells and Lobbies at each Floor level 80 connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0 completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting 0 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE – B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths Yes 0 ……….. 2 Water Supply Yes 0 ……… 3 Sewerage (chamber, sewage lines), Yes 0 ………. Storm Water Drains 4 Storm Water Drains Yes 0 ………… 5 Landscaping & Tree Planting No 0 ………. 6 Street Lighting No 0 ………. 7 Community Building No 0 ………… 8 Treatment and disposal of sewage No 0 ………… and sullage water 9 Solid Waste management & Disposal No 0 ………… 10 Water conservation, Rain water Yes 0 ………. harvesting 11 Energy management No 0 ………… 12 Fire protection and fire safety Yes 0 ……….. requirements 13 Electrical meter room, sub-station, Yes 0 ………….. receiving station 14 Other No 0 …………. Yours Faithfully Signature & Name (IN BLOCK LETTERS) of L. S. / Architect (License no………………………….) Agreed and accepted by: Signature of Promoter Name: Date: