Mobile :9370153239, 9370151769 M/s.CHANDAK CONSTRUCTIONS BuildeRs & DEVelopeRs Main Square, Govt. Girls High School, Court Road, Camp, AMRAVATI -444 602 Date: Ref. No. FORM 1 ARCHITECT'S CERTIFICATE Ongoing Project and for withdrawal of Money from (To be submitted at the time of Registration of Designated Account- Building/Wing wise) Date: 07/04/2024 To, Chandak Construction, Amravati Construction Work of:Chandak Towerhaving Subject: Certificate of Percentage of Completion of Constructionas on (January 2024 to MahaRERA No.P50300051204being developed by Chandak March 2024) Sir, Architect/Licensed Surveyor of certifying IShashank. R. Chandak have undertaken assignment as Chandak TowerhavingMahaRERA No. Percentage of Completion of Construction work of P50300051204. the Building/ Wing of the aforesaid Real Based on Site Inspection, with respect to Layout/each of the Percentage of Work done for each Estate Project. Icertify that as on the date of this certificate, MahaRERA 0s as per Table A herein below. of the building/ Wing of the Real Estate Project under to each of the activity of the entire phase is The percentage of the work executed with respect detailed in Table B. Table-A of the Project) Layout/Building/Wing Number(To be prepared separately for each Building /Wing Percentage of Actual Work Done SrNo Tasks/ Activity (As on date of the Certificate) (1) (2) 100 1 Excavation 2 Basements (if any) 0 3 Number of Podiums (if any) 100 Plinth 0 5 Stilt Floor 75 6 slabs of super structure 10 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises. Wells and Lobbies at each Floor level 75 Staircases, Lifts connecting Staircases and Lifts, Overhead and Underground Water Tanks 0 10 External plumbing and externalplaster, elevation, completion of terrace with the waterproofing of the building. 11 Installationof lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment,Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /CompletionCertificate TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads &Foothpaths Yes 2 Water Supply Yes 3 Sewerage (chamber, sewage lines), Yes Storm Water Drains 4 Storm Water Drains Yes 5 Landscaping &Tree Planting NO 6 Street Lighting No 7 Community Building No 0 Treatment and disposal of sewage NO and sullage water 9 Solid Waste management & Disposal NO 10 Water Conservation, Rain water harvesting Yes 11 Energy management NO 0 12 Fire protection and fire safety Yes requirements 13 Electrical meter room, sub-station, Yes receiving station 14 Other NO 0 Yours Faithfully SHASHANK R CHANDA K (License no- ML:-19356) Agreed andarepteDAK CONSTRUCTION Name: PAETRER PARTNEF Date: