Mobile : 9370153239, 937015 1769 M/s. CHANDAK CONSTRUCTIONS BuildeRs & DEVelopeRS Main Square, Govt. Girls High School, Court Road, Camp, AMRAVATI -444 602 Date : Ref. No. FORM1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account -Building/Wing wise) To, Date: 07/10/2023 Chandak Construction, Amravati Subject: Certificate of Percentage of Completion of Construction Work of: Chandak Towerhaving MahaRERA No.P50300051204being developed by Chandak Constructionas on (July 2023 to September 2023) Sir, IShashank. R. Chandak have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Chandak TowerhavingMahaRERA No. P50300051204. Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building /Wing of the Rea! Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number(To be prepared separately for each Building /Wing of the Project) SrNo Tasks / Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 100 2 Basements (if any) 3 Number of Podiums (if any) 100 4 Plinth 5 Stilt Floor 6 slabs of super structure 21 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/ Premises Sanitary Fittings within the Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level 21 connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0 completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment,Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE e Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. CommonRoads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths Yes 2 Water Supply Yes Sewerage (chamber, sewage lines), Yes 0 Storm Water Drains 4 Storm VWater Drains Yes 5 Landscaping &Tree Planting NO 6 Street Lighting No 7 Community Building No Treatment and disposalof sewage NO and sullage water Solid Waste management & Disposal NO 0 10 Water conservation, Rain water Yes 0 harvestíng 11 Energy management NO 12 Fire protection and fire safety Yes 0 requirements 13 Electrical meter room, sub-station, Yes 0 receiving station 14 Other NO Yours Faithfully SHASHA NK.R.CHANDAK (License no - ML:-19356) Agreed and accepted by: Ms CL A nACTRDCTIO Name: PASTNE8 PABTNET Date: